Azizi Venice 2
Dubai SouthAzizi
Azizi Venice 2 is an off-plan project by Azizi in Dubai South, with 504 homes on 11 floors. DLD’s last inspection, on 26 Oct 2026, found it 57% built.
- Built
- 57%
- Handover
- Q4 2025
- Sales in 12 months
- 205
- Homes
- 504
Progress
- Q4 2023Building started
- Jan–Mar 2024Launch sales · 1
- Q4 2025Planned handover · passed
- Oct 2026Last inspection · 57%
Prices
Price per sq ft
Typical price by size
- Studio
- AED 694k334 sq ft · 2,042 AED/sq ft · 160 sales
- 1 bed
- AED 1.21M665 sq ft · 1,786 AED/sq ft · 43 sales
- 2 beds
- Not enough sales2 sales
Against 66 Dubai South off-plan projects with 10 or more sales
- Lowest750AED/sq ft
- Typical1,580AED/sq ft
- Azizi Venice 21,980AED/sq ft
- Highest2,550AED/sq ft
10th highest of 66 · AED per sq ft in 12 months
Latest sales
Plus 5 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 17 Nov 2026 | Studio New | 333 | 1,980 | AED 659k |
| 4 Nov 2026 | 1 bed New | 682 | 1,676 | AED 1.14M |
| 3 Nov 2026 | Studio New | 336 | 1,964 | AED 660k |
| 3 Nov 2026 | Studio New | 335 | 1,979 | AED 663k |
| 3 Nov 2026 | Studio New | 333 | 1,997 | AED 665k |
| Oct 2026 · 16 sales | ||||
| 30 Oct 2026 | Studio | 334 | 1,976 | AED 660k |
| 22 Oct 2026 | Studio | 334 | 2,083 | AED 696k |
| 22 Oct 2026 | Studio | 334 | 2,013 | AED 672k |
| 22 Oct 2026 | Studio | 335 | 1,925 | AED 645k |
| 21 Oct 2026 | Studio | 332 | 1,832 | AED 608k |
| 21 Oct 2026 | Studio | 332 | 1,823 | AED 605k |
| 15 Oct 2026 | Studio | 388 | 1,945 | AED 755k |
| 13 Oct 2026 | 1 bed | 682 | 1,848 | AED 1.26M |
| 13 Oct 2026 | 1 bed | 665 | 1,759 | AED 1.17M |
| 13 Oct 2026 | Studio | 334 | 2,186 | AED 730k |
| 13 Oct 2026 | Studio | 336 | 2,095 | AED 704k |
| 13 Oct 2026 | Studio | 332 | 2,021 | AED 671k |
| 13 Oct 2026 | Studio | 345 | 1,965 | AED 678k |
| 12 Oct 2026 | Studio | 334 | 2,051 | AED 685k |
| 9 Oct 2026 | Studio | 336 | 1,967 | AED 661k |
| 8 Oct 2026 | Studio | 334 | 2,072 | AED 692k |
| Sep 2026 · 11 sales | ||||
| 28 Sep 2026 | 1 bed | 662 | 1,858 | AED 1.23M |
| 22 Sep 2026 | 1 bed | 659 | 1,882 | AED 1.24M |
| 17 Sep 2026 | Studio | 336 | 2,232 | AED 750k |
| 16 Sep 2026 | Studio | 337 | 2,047 | AED 690k |
| 14 Sep 2026 | 1 bed | 662 | 1,745 | AED 1.16M |
| 9 Sep 2026 | Studio | 334 | 2,246 | AED 750k |
| 8 Sep 2026 | Studio | 334 | 2,093 | AED 699k |
| 8 Sep 2026 | 1 bed | 665 | 1,759 | AED 1.17M |
| 7 Sep 2026 | 1 bed | 621 | 1,747 | AED 1.08M |
| 2 Sep 2026 | Studio | 334 | 1,940 | AED 648k |
| 1 Sep 2026 | 1 bed | 809 | 1,523 | AED 1.23M |
| Aug 2026 · 20 sales | ||||
| 31 Aug 2026 | Studio | 331 | 2,081 | AED 689k |
| 27 Aug 2026 | 2 beds | 1,521 | 1,512 | AED 2.3M |
| 25 Aug 2026 | Studio | 389 | 1,928 | AED 750k |
| 25 Aug 2026 | Studio | 334 | 2,156 | AED 720k |
| 25 Aug 2026 | Studio | 347 | 2,161 | AED 750k |
| 25 Aug 2026 | Studio | 345 | 1,993 | AED 688k |
| 25 Aug 2026 | Studio | 335 | 2,000 | AED 670k |
| 24 Aug 2026 | Studio | 373 | 1,870 | AED 697k |
| 24 Aug 2026 | Studio | 334 | 2,096 | AED 700k |
| 24 Aug 2026 | Studio | 391 | 1,844 | AED 721k |
| 20 Aug 2026 | Studio | 334 | 2,043 | AED 682k |
| 20 Aug 2026 | Studio | 333 | 2,049 | AED 682k |
| 19 Aug 2026 | Studio | 334 | 1,922 | AED 642k |
| 17 Aug 2026 | Studio | 332 | 2,055 | AED 682k |
| 14 Aug 2026 | Studio | 345 | 2,174 | AED 750k |
| 13 Aug 2026 | Studio | 332 | 2,078 | AED 690k |
| 7 Aug 2026 | Studio | 335 | 2,263 | AED 758k |
| 5 Aug 2026 | Studio | 334 | 2,093 | AED 699k |
Homes
504 homes by size
- Studio66%331 homes · 332–746 sq ft · 16 layouts
- 1 bed30%151 homes · 621–1,032 sq ft · 9 layouts
- 2 beds4%22 homes · 1,251–1,521 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai39min
- Dubai Airport (DXB)44min
- Dubai Marina28min
By car. Jebel Ali Beach, the nearest beach, is 20.1 km away.
Rated schools
No rated schools within 5 km
Getting around
- Al Maktoum AirportHigh-speed rail · planned6.4 kmaway
- Al Maktoum InternationalDWC6.4 kmaway
- Expo 2020Red Line13 kmaway
- Al YalayisEtihad Rail20 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%Developer
- 91 finished
- 47 being built, on time
- 10 past their planned date
- 2 not started
- Escrow bank
- Emirates NBD Bank
- Legal name
- Azizi Developments L.L.C
Also being built by Azizi
| Project | Handover | Built |
|---|---|---|
| Azizi GrandDubai Sports City | Q1 2025Past planned date | 82% |
| Azizi Riviera ReveAl Merkadh | Q1 2025Past planned date | 77% |
| Azizi Venice 5Dubai South | Q4 2025Past planned date | 63% |
| Azizi Venice 1Dubai South | Q4 2025Past planned date | 67% |
| Azizi Venice 3Dubai South | Q4 2025Past planned date | 76% |
More questions about Azizi Venice 2
From AED 694k for a 334 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.21M.
Q4 2025, the planned date in DLD’s register.
No. It is 11 months past its planned date, and was 57% built at DLD’s last inspection on 26 Oct 2026.
504 homes on 11 floors: 331 studios of 332–746 sq ft, 151 1-bed flats of 621–1,032 sq ft and 22 2-bed flats of 1,251–1,521 sq ft.
About AED 41k a year for a studio, AED 57k for a 1-bed and AED 85k for a 2-bed in Dubai South, a gross yield of about 7.4% Estimate.
Of Azizi’s 150 projects on DLD’s record, 91 are finished. Of the 57 being built, 10 are past their planned date.
In Dubai South, 39 minutes by car to Downtown Dubai and 44 to Dubai Airport (DXB). Expo 2020 Metro station on the Red Line is 13 km away.
More nearby
Off-plan nearby
- Azizi Venice 1From AED 787k67% built · Past planned date
- Azizi Venice 3From AED 641k76% built · Past planned date
- Azizi Venice 8From AED 624k53% built · Handover not on record
- Azizi Venice 7From AED 640k29% built · Past planned date
- Azizi Venice 9From AED 673k54% built · Handover not on record
- Azizi Venice 4From AED 606k62% built · Past planned date
