Beachfront Gates 1

Dubai SouthDubai South

Beachfront Gates 1 is an off-plan project by Dubai South in Dubai South, with 70 homes on 6 floors. DLD’s last inspection, on 26 Oct 2026, found it 36% built.

Built
36%
Handover
Q4 2026
Sales in 12 months
No sales
Homes
70

Progress

36%built
  1. Q1 2025Building started
  2. Oct 2026Last inspection · 36%
  3. Q4 2026Planned handover

Homes

70 homes by size

  • 1 bed33%23 homes · 866–1,102 sq ft · 5 layouts
  • 2 beds50%35 homes · 1,228–2,788 sq ft · 8 layouts
  • 3 beds17%12 homes · 2,057–3,090 sq ft · 3 layouts

Location

Drive times

  • Downtown Dubai42min
  • Dubai Airport (DXB)47min
  • Dubai Marina28min

By car. JBR Beach, the nearest beach, is 18.5 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Al Maktoum AirportHigh-speed rail · planned7.7 kmaway
  • Al Maktoum InternationalDWC7.7 kmaway
  • Expo 2020Red Line8.3 kmaway
  • Al YalayisEtihad Rail11 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%

Developer

  • 13 finished
  • 15 being built, on time
  • 3 past their planned date
Escrow bank
Abu Dhabi Commercial Bank
Legal name
Dubai South Properties Dwc LLC

Also being built by Dubai South

Dubai South’s other projects
ProjectHandoverBuilt
South LivingDubai SouthQ1 2020Past planned date89%
South Bay 1Dubai SouthQ1 2025Past planned date94%
South Bay 2Dubai SouthQ2 2026Past planned date94%
Beachfront Gates 2Dubai SouthQ4 2026Being built61%
Hayat 3Dubai SouthQ2 2028Being built4%
All 31 Dubai South projects
Questions

More questions about Beachfront Gates 1

Q4 2026, the planned date in DLD’s register.

It is not past its planned date. It was 36% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.

70 homes on 6 floors: 23 1-bed flats of 866–1,102 sq ft, 35 2-bed flats of 1,228–2,788 sq ft and 12 3-bed flats of 2,057–3,090 sq ft.

About AED 57k a year for a 1-bed, AED 85k for a 2-bed and AED 120k for a 3-bed in Dubai South, a gross yield of about 7.4% Estimate.

Of Dubai South’s 31 projects on DLD’s record, 13 are finished. Of the 18 being built, 3 are past their planned date.