Binghatti Square 1
MajanBinghatti
Binghatti Square 1 is an off-plan project by Binghatti in Majan, with 149 homes on 7 floors. DLD’s last inspection, on 18 Feb 2026, found it 0% built.
- Built
- 0%
- Handover
- Q2 2027
- Sales in 12 months
- No sales
- Homes
- 149
Progress
- Feb 2026Last inspection · 0%
- Q1 2026Building started
- Q2 2027Planned handover
DLD updates % built after each inspection, so work on site can be further along than this figure.
Homes
149 homes by size
- 1 bed35%52 homes · 702–813 sq ft · 4 layouts
- 2 beds46%69 homes · 1,041–1,868 sq ft · 8 layouts
- 3 beds19%28 homes · 1,393–2,094 sq ft · 5 layouts
Location
Drive times
- Downtown Dubai22min
- Dubai Airport (DXB)27min
- Dubai Marina35min
By car. Mercato Beach, the nearest beach, is 14.0 km away.
Rated schools
- Repton SchoolUK/IB (Y 13) · Outstanding3.1 kmaway
- GEMS Wellington Academy -FzeUK · Very good3.9 kmaway
Getting around
- Nad Al ShebaGold Line · opens 20323.8 kmaway
- MeydanEtihad Rail · planned5.7 kmaway
- CreekGreen Line9.7 kmaway
- Al JaddafHigh-speed rail · planned10 kmaway
- Dubai InternationalDXB13 kmaway
Area guideMajanFinished homesAED 1,181/sq ft1-bed rentAED 65k/yrGross yieldEstimate6.6%Developer
- 43 finished
- 21 being built, on time
- 15 past their planned date
- 5 not started
- Escrow bank
- Not on record
- Legal name
- Binghatti Developers FZE
Also being built by Binghatti
| Project | Handover | Built |
|---|---|---|
| Bugatti Residences by BinghattiBusiness Bay | Q4 2025Past planned date | 66% |
| Binghatti AmberhallJVC | Q1 2026Past planned date | 38% |
| Binghatti RubyJVC | Q1 2026Past planned date | 46% |
| Binghatti HavenDubai Sports City | Q1 2026Past planned date | 76% |
| Binghatti StarlightSama Al Jadaf | Q1 2026Past planned date | 63% |
More questions about Binghatti Square 1
Q2 2027, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 18 Feb 2026, with handover planned in 7 months.
149 homes on 7 floors: 52 1-bed flats of 702–813 sq ft, 69 2-bed flats of 1,041–1,868 sq ft and 28 3-bed flats of 1,393–2,094 sq ft.
About AED 65k a year for a 1-bed, AED 90k for a 2-bed and AED 130k for a 3-bed in Majan, a gross yield of about 6.6% Estimate.
Of Binghatti’s 84 projects on DLD’s record, 43 are finished. Of the 36 being built, 15 are past their planned date.
In Majan, 22 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). Creek Metro station on the Green Line is 9.7 km away.
More nearby
Off-plan nearby
- Binghatti Square 2No sales0% built · Planned Q2 2027
- Gate Eleven ResidencesFrom AED 1.55M31% built · Planned Q1 2028
- Binghatti Square 3No sales0% built · Planned Q2 2027
- Knightsbridge ParkFrom AED 7.94M11% built · Planned Q4 2027
- Art House Private Residences by VivaFrom AED 1.29M0% built · Planned Q1 2028
- Woodland TerracesFrom AED 1.27M10% built · Planned Q1 2027
Finished buildings nearby
Typical next door AED 1,525/sq ft · 2 buildings within a 10-minute walk
- Grenland Residence by arloid1,243AED/sq ftNot enough rents · 10-minute walk
- The Spark by Esnaad1,807AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- Al Rabia Tower760AED/sq ftNot enough rents
- The Haven1,452AED/sq ft1-bed rent AED 75k/yr
- Paradise View 11,020AED/sq ft1-bed rent AED 65k/yr
- Celia Heights1,359AED/sq ft1-bed rent AED 65k/yr