Skip to content

Binghatti Titania

MajanBinghatti

FromAED 691kStudio · 375 sq ft

Binghatti Titania is an off-plan project by Binghatti in Majan, with 789 homes on 32 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q1 2027
Sales in 12 months
725
Homes
789

About

Binghatti Titania is a 32-floor building of 789 homes in Majan, close to Al Barari and the area’s parks. Most homes are studios, with 1-bed flats and a few 2-bed flats, all with open-plan layouts. A family deck holds a shallow pool, a kids’ pool and a pergola deck that appears to float.

  • Mostly studios
  • Family amenity deck
  • Close to Al Barari

Shared facilities

  • Adults’ pool
  • Shallow pool
  • Kids’ pool
  • Floating pergola deck
  • Kids’ play area
  • Yoga zone
  • Gym
  • Outdoor seating

Progress

0%built
  1. Q4 2025Building started
  2. Oct 2026Last inspection · 0%
  3. Q1 2027Planned handover

Prices

Price per sq ft

1,767 AED/sq ft725 sales in 12 months

Typical price by size

Studio
AED 691k375 sq ft · 1,842 AED/sq ft · 439 sales
1 bed
AED 1.15M795 sq ft · 1,446 AED/sq ft · 262 sales
2 beds
AED 1.57M1,200 sq ft · 1,301 AED/sq ft · 24 sales

Against 35 Majan off-plan projects with 10 or more sales

  • Lowest783AED/sq ft
  • Typical1,474AED/sq ft
  • Binghatti Titania1,767AED/sq ft
  • Highest2,941AED/sq ft

11th highest of 35 · AED per sq ft in 12 months

Binghatti’s own price starts at AED 680k. DLD’s AED 691k is the lowest typical price paid in the 12 months.

Latest sales

Plus 5 newer sales, newest first
725 off-plan sales · Nov 2025 – Oct 2026, plus 5 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
19 Nov 2026Studio New3691,762AED 650k
18 Nov 2026Studio New3751,600AED 600k
17 Nov 2026Studio New3991,629AED 650k
11 Nov 2026Studio New4291,690AED 725k
9 Nov 2026Studio New3761,596AED 600k
Oct 2026 · 12 sales
26 Oct 2026Studio3731,810AED 675k
23 Oct 2026Studio3721,815AED 675k
20 Oct 2026Studio3761,795AED 675k
13 Oct 20262 beds1,2001,302AED 1.56M
6 Oct 2026Studio3731,810AED 675k
5 Oct 20261 bed7721,328AED 1.03M
5 Oct 2026Studio3721,546AED 575k
5 Oct 2026Studio3751,800AED 675k
5 Oct 20262 beds1,2161,255AED 1.53M
2 Oct 2026Studio4291,704AED 731k
2 Oct 2026Studio6301,151AED 725k
1 Oct 20261 bed8571,405AED 1.2M
Sep 2026 · 39 sales
24 Sep 2026Studio3731,810AED 675k
24 Sep 20261 bed6681,609AED 1.08M
14 Sep 2026Studio3721,815AED 675k
14 Sep 20261 bed6741,595AED 1.08M
14 Sep 2026Studio3731,810AED 675k
14 Sep 20261 bed8381,384AED 1.16M
14 Sep 20261 bed8571,342AED 1.15M
14 Sep 2026Studio3751,600AED 600k
11 Sep 20261 bed8571,342AED 1.15M
10 Sep 2026Studio3651,874AED 684k
10 Sep 2026Studio3731,810AED 675k
10 Sep 20261 bed7521,430AED 1.08M
10 Sep 20261 bed8381,253AED 1.05M
10 Sep 2026Studio3731,810AED 675k
10 Sep 20262 beds1,2161,292AED 1.57M
10 Sep 20261 bed1,0261,121AED 1.15M
9 Sep 20261 bed7521,363AED 1.03M
8 Sep 2026Studio3881,740AED 675k
7 Sep 2026Studio3731,810AED 675k
7 Sep 20261 bed7821,375AED 1.08M
7 Sep 2026Studio3711,617AED 600k
4 Sep 2026Studio3731,767AED 659k
3 Sep 20261 bed8571,342AED 1.15M
3 Sep 2026Studio3751,800AED 675k
3 Sep 2026Studio3731,810AED 675k
3 Sep 20261 bed1,0261,072AED 1.1M
3 Sep 2026Studio3751,800AED 675k
3 Sep 20261 bed7721,496AED 1.15M
3 Sep 2026Studio3751,600AED 600k
3 Sep 20261 bed7521,430AED 1.08M
3 Sep 2026Studio6301,032AED 650k
3 Sep 2026Studio3731,810AED 675k
2 Sep 2026Studio3751,600AED 600k

Homes

789 homes by size

  • Studio60%473 homes · 365–630 sq ft · 9 layouts
  • 1 bed36%284 homes · 661–1,053 sq ft · 12 layouts
  • 2 beds4%32 homes · 1,200–1,216 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai30min
  • Dubai Airport (DXB)27min
  • Dubai Marina31min

By car. Kite Beach, the nearest beach, is 13.9 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Global VillageGold Line · opens 20322.1 kmaway
  • MeydanEtihad Rail · planned8.0 kmaway
  • ONPASSIVERed Line12 kmaway
  • Al JaddafHigh-speed rail · planned16 kmaway
  • Dubai InternationalDXB19 kmaway
Area guideMajanFinished homesAED 1,181/sq ft1-bed rentAED 65k/yrGross yieldEstimate6.6%

Developer

  • 43 finished
  • 21 being built, on time
  • 15 past their planned date
  • 5 not started
Escrow bank
Dubai Islamic Bank
Legal name
Binghatti Developers FZE

Also being built by Binghatti

Binghatti’s other projects
ProjectHandoverBuilt
Bugatti Residences by BinghattiBusiness BayQ4 2025Past planned date66%
Binghatti AmberhallJVCQ1 2026Past planned date38%
Binghatti RubyJVCQ1 2026Past planned date46%
Binghatti HavenDubai Sports CityQ1 2026Past planned date76%
Binghatti StarlightSama Al JadafQ1 2026Past planned date63%
All 84 Binghatti projects
Questions

More questions about Binghatti Titania

From AED 691k for a 375 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.15M and 2-bed flats sell for about AED 1.57M.

Q1 2027, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 months.

789 homes on 32 floors: 473 studios of 365–630 sq ft, 284 1-bed flats of 661–1,053 sq ft and 32 2-bed flats of 1,200–1,216 sq ft.

About AED 44k a year for a studio, AED 65k for a 1-bed and AED 90k for a 2-bed in Majan, a gross yield of about 6.6% Estimate.

Of Binghatti’s 84 projects on DLD’s record, 43 are finished. Of the 36 being built, 15 are past their planned date.

In Majan, 30 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). ONPASSIVE Metro station on the Red Line is 12 km away.

More nearby

How the numbers work

FromAED 691kSee it on the map