
Club Place
Dubai Hills EstateEmaar
Club Place is an off-plan project by Emaar in Dubai Hills Estate, with 473 homes on 20 floors. DLD’s last inspection, on 26 Oct 2026, found it 69% built.
- Built
- 69%
- Handover
- Q4 2028
- Since launch
- Up 2%1 bed price per sq ft
- Homes
- 473
About
Club Place has 473 homes in buildings of up to 20 floors in Dubai Hills Estate, looking over the Dubai Hills Golf Course. About half the homes are 1-bed flats, with 2-bed and 3-bed flats, some of them on the ground floor. Residents share an infinity pool ringed by cabanas, a landscaped deck high up and indoor and outdoor gyms.
- Golf course views
- Ground-floor homes
- Infinity pool with cabanas
Shared facilities
- Infinity pool and pool deck
- Kids’ play area
- Indoor and outdoor gyms
- Indoor multipurpose room
- Landscaped podium deck
- Upper-floor landscaped deck
- Covered car park
Progress
- Aug–Oct 2024Launch sales · 347
- Q3 2024Building started
- Oct 2026Last inspection · 69%
- Q4 2028Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 1.66M746 sq ft · 14 sales
- 2 beds
- AED 3.29M1,187 sq ft · 6 sales
- 3 beds
- AED 4.03M1,752 sq ft · 8 sales
Against 14 Hills Estate off-plan projects with 10 or more sales
- Lowest2,135AED/sq ft
- Club Place2,307AED/sq ft
- Typical2,439AED/sq ft
- Highest2,800AED/sq ft
6th lowest of 14 · AED per sq ft in 12 months
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Oct 2026 · 1 sale | ||||
| 26 Oct 2026 | 2 beds | 1,222 | 2,695 | AED 3.29M |
| Sep 2026 · 11 sales | ||||
| 30 Sep 2026 | 3 beds | 1,551 | 2,377 | AED 3.69M |
| 3 Sep 2026 | 2 beds | 1,087 | 3,671 | AED 3.99M |
| 3 Sep 2026 | 2 beds | 1,152 | 2,856 | AED 3.29M |
| 3 Sep 2026 | 3 beds | 1,551 | 3,346 | AED 5.19M |
| 3 Sep 2026 | 1 bed | 785 | 2,790 | AED 2.19M |
| 3 Sep 2026 | 2 beds | 1,086 | 3,674 | AED 3.99M |
| 3 Sep 2026 | 1 bed | 728 | 2,967 | AED 2.16M |
| 3 Sep 2026 | 1 bed | 746 | 2,895 | AED 2.16M |
| 3 Sep 2026 | 1 bed | 743 | 2,907 | AED 2.16M |
| 3 Sep 2026 | 1 bed | 746 | 2,895 | AED 2.16M |
| 3 Sep 2026 | 1 bed | 746 | 2,895 | AED 2.16M |
| Aug 2026 · 2 sales | ||||
| 26 Aug 2026 | 1 bed | 748 | 1,705 | AED 1.28M |
| 26 Aug 2026 | 1 bed | 753 | 1,660 | AED 1.25M |
| Jul 2026 · 1 sale | ||||
| 6 Jul 2026 | 1 bed | 746 | 2,103 | AED 1.57M |
| Jun 2026 · 2 sales | ||||
| 11 Jun 2026 | 3 beds | 1,752 | 2,591 | AED 4.54M |
| 4 Jun 2026 | 1 bed | 746 | 2,103 | AED 1.57M |
| Apr 2026 · 2 sales | ||||
| 16 Apr 2026 | 1 bed | 763 | 2,162 | AED 1.65M |
| 6 Apr 2026 | 1 bed | 753 | 2,226 | AED 1.68M |
| Mar 2026 · 2 sales | ||||
| 30 Mar 2026 | 1 bed | 746 | 2,102 | AED 1.57M |
| 17 Mar 2026 | 3 beds | 1,752 | 2,308 | AED 4.04M |
| Feb 2026 · 4 sales | ||||
| 26 Feb 2026 | 1 bed | 753 | 2,183 | AED 1.64M |
| 5 Feb 2026 | 3 beds | 1,752 | 2,296 | AED 4.02M |
| 5 Feb 2026 | 2 beds | 1,383 | 2,099 | AED 2.9M |
| 4 Feb 2026 | 2 beds | 1,559 | 1,908 | AED 2.97M |
| Jan 2026 · 1 sale | ||||
| 5 Jan 2026 | 3 beds | 1,931 | 1,982 | AED 3.83M |
| Dec 2025 · 1 sale | ||||
| 30 Dec 2025 | 3 beds | 1,923 | 1,985 | AED 3.82M |
| Nov 2025 · 1 sale | ||||
| 6 Nov 2025 | 3 beds | 1,752 | 2,306 | AED 4.04M |
Homes
473 homes by size
- 1 bed49%234 homes · 693–898 sq ft · 8 layouts
- 2 beds35%164 homes · 1,086–1,559 sq ft · 11 layouts
- 3 beds16%75 homes · 1,551–1,923 sq ft · 6 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 4.04MLocation
Drive times
- Downtown Dubai21min
- Dubai Airport (DXB)30min
- Dubai Marina23min
By car. Kite Beach, the nearest beach, is 6.8 km away.
Rated schools
No rated schools within 5 km
Getting around
- Hadaeq Mohammed Bin RashidGold Line · opens 20322.0 kmaway
- ONPASSIVERed Line4.6 kmaway
- MeydanEtihad Rail · planned5.5 kmaway
- Al JaddafHigh-speed rail · planned13 kmaway
- Dubai InternationalDXB17 kmaway
Developer
- 193 finished
- 139 being built, on time
- 3 past their planned date
- Escrow bank
- Emirates NBD Bank
- Legal name
- Dubai Hills Estate L.L.C
Also being built by Emaar
| Project | Handover | Built |
|---|---|---|
| MaysanTown Square | Q3 2016Past planned date | 37% |
| Teema 1 & Teema 2Al Yalayis 4 | Q3 2016Past planned date | 9% |
| Ocean StarDubai Maritime City | Q3 2025Past planned date | 30% |
| SeascapeDubai Maritime City | Q4 2026Being built | 79% |
| The St. Regis Residences, Downtown DubaiDowntown Dubai | Q4 2026Being built | 76% |
More questions about Club Place
From AED 1.66M for a 746 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 3.29M and 3-bed flats sell for about AED 4.03M.
Q4 2028, the planned date in DLD’s register.
It is not past its planned date. It was 69% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.
473 homes on 20 floors: 234 1-bed flats of 693–898 sq ft, 164 2-bed flats of 1,086–1,559 sq ft and 75 3-bed flats of 1,551–1,923 sq ft.
Up 2% for 1-bed flats, per sq ft. Against the launch sales of Aug 2024 – Oct 2024: 2-bed flats up 15%, 3-bed flats down 10%.
About AED 90k a year for a 1-bed, AED 140k for a 2-bed and AED 250k for a 3-bed in Hills Estate, a gross yield of about 6.1% Estimate.
Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 4.04M.
In Dubai Hills Estate, 21 minutes by car to Downtown Dubai and 30 to Dubai Airport (DXB). ONPASSIVE Metro station on the Red Line is 4.6 km away.
More nearby
Off-plan nearby
- Golf HillsideFrom AED 1.54M66% built · Planned Q4 2028
- Vida Residences Club PointFrom AED 1.73M44% built · Planned Q1 2029
- RosehillFrom AED 1.65M8% built · Planned Q2 2029
- Greenside ResidenceFrom AED 1.62M93% built · Handover not on record
- 399 Hills Park ANo sales0% built · Handover not on record
- Ellington House IVFrom AED 2.08M70% built · Handover not on record
Finished buildings nearby
Typical next door AED 2,310/sq ft · 2 buildings within a 10-minute walk
- Golf Suites - Dubai Hills2,322AED/sq ft1-bed rent AED 98k/yr · 10-minute walk
- Golf Ville2,298AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- Park Ridge2,435AED/sq ft1-bed rent AED 95k/yr
- Hills Park2,229AED/sq ft1-bed rent AED 80k/yr
- Park Heights II2,108AED/sq ft1-bed rent AED 85k/yr
- Mulberry at Park Heights2,485AED/sq ft1-bed rent AED 115k/yr