Cresswell Homes

Dubai SouthMerath

Cresswell Homes is an off-plan project by Merath in Dubai South, with 70 homes on 6 floors. DLD’s last inspection, on 26 Oct 2026, found it 29% built.

Built
29%
Handover
Q4 2026
Sales in 12 months
1
Homes
70

Progress

29%built
  1. Q4 2024Building started
  2. Oct 2026Last inspection · 29%
  3. Q4 2026Planned handover

Prices

Typical price by size

Typical price by size · Nov 2025 – Oct 2026
SizeTypical priceAED/sq ftSales
1 bedNot enough sales1

Against 66 Dubai South off-plan projects with 10 or more sales

  • Lowest750AED/sq ft
  • Cresswell Homes1,306AED/sq ft
  • Typical1,580AED/sq ft
  • Highest2,550AED/sq ft

Latest sales

Plus 3 newer sales, newest first
1 off-plan sale · Nov 2025 – Oct 2026, plus 3 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
6 Nov 20262 beds New1,3151,312AED 1.73M
4 Nov 20261 bed New8521,325AED 1.13M
4 Nov 20261 bed New8881,374AED 1.22M
Oct 2026 · 1 sale
29 Oct 20261 bed8191,306AED 1.07M

Homes

70 homes by size

  • 1 bed49%34 homes · 819–888 sq ft · 3 layouts
  • 2 beds51%36 homes · 1,250–1,314 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai41min
  • Dubai Airport (DXB)47min
  • Dubai Marina28min

By car. JBR Beach, the nearest beach, is 17.7 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Expo 2020Red Line7.5 kmaway
  • Al Maktoum AirportHigh-speed rail · planned7.6 kmaway
  • Al Maktoum InternationalDWC7.6 kmaway
  • Al YalayisEtihad Rail9.7 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%

Developer

  • 1 finished
  • 1 being built, on time
Escrow bank
Emirates NBD Bank
Legal name
Abdulwahed Faqeeh Properties L.L.C

More by Merath

Merath’s other projects
ProjectHandoverBuilt
Cresswell ResidencesDubai SouthQ2 2025Finished
All 2 Merath projects
Questions

More questions about Cresswell Homes

Q4 2026, the planned date in DLD’s register.

It is not past its planned date. It was 29% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.

70 homes on 6 floors: 34 1-bed flats of 819–888 sq ft and 36 2-bed flats of 1,250–1,314 sq ft.

About AED 57k a year for a 1-bed and AED 85k for a 2-bed in Dubai South, a gross yield of about 7.4% Estimate.

Of Merath’s 2 projects on DLD’s record, 1 are finished. Of the 1 being built, none is past its planned date.

In Dubai South, 41 minutes by car to Downtown Dubai and 47 to Dubai Airport (DXB). Expo 2020 Metro station on the Red Line is 7.5 km away.

More nearby

How the numbers work