Enre Residence by Imtiaz
Dubai SouthImtiaz
Enre Residence by Imtiaz is an off-plan project by Imtiaz in Dubai South, with 169 homes on 9 floors. DLD’s last inspection, on 26 Oct 2026, found it 15% built.
- Built
- 15%
- Handover
- Q3 2028
- Sales in 12 months
- 133
- Payment plan
- 20/40/40
- Homes
- 169
About
Enre Residence is a 9-floor building of 169 homes in Dubai South, close to Al Maktoum International Airport and Expo City. Over half the homes are 2-bed flats, with 1-bed flats and a few studios, all with smart home controls that work with Alexa. Shared spaces include a floating deck, a swing garden and fire-pit seating, set among lawns and garden paths.
- Smart homes that work with Alexa
- Floating deck and swing garden
- Near Al Maktoum airport
Shared facilities
- Adults’ pool
- Kids’ pool
- Floating deck
- Swing garden
- Fire-pit seating
- Indoor gym
- Jogging track
- Yoga deck
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 15%
- Q1 2028Developer’s date
- Q3 2028Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 804k420 sq ft · 1,888 AED/sq ft · 16 sales
- 1 bed
- AED 1.27M772 sq ft · 1,615 AED/sq ft · 59 sales
- 2 beds
- AED 1.78M1,321 sq ft · 1,407 AED/sq ft · 58 sales
Against 66 Dubai South off-plan projects with 10 or more sales
- Lowest750AED/sq ft
- Enre Residence by Imtiaz1,570AED/sq ft
- Typical1,580AED/sq ft
- Highest2,550AED/sq ft
32nd lowest of 66 · AED per sq ft in 12 months
Latest sales
Plus 5 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 19 Nov 2026 | 2 beds New | 1,128 | 1,590 | AED 1.79M |
| 17 Nov 2026 | 1 bed New | 880 | 1,365 | AED 1.2M |
| 13 Nov 2026 | 2 beds New | 1,128 | 1,560 | AED 1.76M |
| 13 Nov 2026 | 2 beds New | 1,450 | 1,219 | AED 1.77M |
| 13 Nov 2026 | 2 beds New | 1,342 | 1,415 | AED 1.9M |
| Oct 2026 · 8 sales | ||||
| 19 Oct 2026 | 1 bed | 760 | 1,715 | AED 1.3M |
| 19 Oct 2026 | 2 beds | 1,321 | 1,397 | AED 1.85M |
| 19 Oct 2026 | 2 beds | 1,334 | 1,325 | AED 1.77M |
| 16 Oct 2026 | 2 beds | 1,450 | 1,342 | AED 1.95M |
| 8 Oct 2026 | 2 beds | 1,366 | 1,383 | AED 1.89M |
| 5 Oct 2026 | 1 bed | 758 | 1,661 | AED 1.26M |
| 5 Oct 2026 | 2 beds | 1,412 | 1,201 | AED 1.7M |
| 2 Oct 2026 | 1 bed | 733 | 1,756 | AED 1.29M |
| Sep 2026 · 13 sales | ||||
| 28 Sep 2026 | 1 bed | 777 | 1,709 | AED 1.33M |
| 25 Sep 2026 | 2 beds | 1,402 | 1,384 | AED 1.94M |
| 23 Sep 2026 | 1 bed | 747 | 1,676 | AED 1.25M |
| 23 Sep 2026 | 2 beds | 1,175 | 1,402 | AED 1.65M |
| 22 Sep 2026 | 2 beds | 1,098 | 1,603 | AED 1.76M |
| 21 Sep 2026 | 2 beds | 1,111 | 1,577 | AED 1.75M |
| 21 Sep 2026 | 2 beds | 1,107 | 1,580 | AED 1.75M |
| 21 Sep 2026 | 2 beds | 1,107 | 1,580 | AED 1.75M |
| 17 Sep 2026 | 2 beds | 1,447 | 1,225 | AED 1.77M |
| 4 Sep 2026 | 1 bed | 747 | 1,744 | AED 1.3M |
| 4 Sep 2026 | 1 bed | 871 | 1,614 | AED 1.41M |
| 3 Sep 2026 | 1 bed | 904 | 1,589 | AED 1.44M |
| 3 Sep 2026 | 1 bed | 733 | 1,754 | AED 1.29M |
| Aug 2026 · 10 sales | ||||
| 26 Aug 2026 | 1 bed | 733 | 1,631 | AED 1.2M |
| 25 Aug 2026 | 2 beds | 1,126 | 1,460 | AED 1.64M |
| 25 Aug 2026 | 1 bed | 874 | 1,452 | AED 1.27M |
| 25 Aug 2026 | 1 bed | 733 | 1,772 | AED 1.3M |
| 19 Aug 2026 | 1 bed | 756 | 1,632 | AED 1.23M |
| 19 Aug 2026 | 2 beds | 1,098 | 1,590 | AED 1.75M |
| 19 Aug 2026 | 1 bed | 787 | 1,566 | AED 1.23M |
| 19 Aug 2026 | 2 beds | 1,402 | 1,274 | AED 1.79M |
| 18 Aug 2026 | 1 bed | 735 | 1,810 | AED 1.33M |
| 6 Aug 2026 | 2 beds | 1,128 | 1,391 | AED 1.57M |
| Jul 2026 · 7 sales | ||||
| 29 Jul 2026 | 2 beds | 1,450 | 1,347 | AED 1.95M |
| 29 Jul 2026 | 1 bed | 904 | 1,500 | AED 1.36M |
| 8 Jul 2026 | 2 beds | 1,128 | 1,391 | AED 1.57M |
| 8 Jul 2026 | 2 beds | 1,126 | 1,581 | AED 1.78M |
| 7 Jul 2026 | 1 bed | 760 | 1,623 | AED 1.23M |
| 7 Jul 2026 | 2 beds | 1,334 | 1,394 | AED 1.86M |
| 6 Jul 2026 | 1 bed | 751 | 1,536 | AED 1.15M |
| Jun 2026 · 57 sales | ||||
| 26 Jun 2026 | 1 bed | 777 | 1,696 | AED 1.32M |
| 25 Jun 2026 | 2 beds | 1,137 | 1,539 | AED 1.75M |
| 25 Jun 2026 | 1 bed | 733 | 1,596 | AED 1.17M |
| 25 Jun 2026 | 1 bed | 836 | 1,640 | AED 1.37M |
| 24 Jun 2026 | 1 bed | 756 | 1,612 | AED 1.22M |
| 24 Jun 2026 | 2 beds | 1,342 | 1,313 | AED 1.76M |
| 24 Jun 2026 | 2 beds | 1,111 | 1,457 | AED 1.62M |
Homes
169 homes by size
- Studio10%17 homes · 355–483 sq ft · 4 layouts
- 1 bed38%65 homes · 733–904 sq ft · 9 layouts
- 2 beds51%87 homes · 1,107–1,450 sq ft · 10 layouts
Payment plan
Imtiaz’s project page- 20%On booking
- 40%During construction
- 40%On handover
Location
Drive times
- Downtown Dubai41min
- Dubai Airport (DXB)46min
- Dubai Marina28min
By car. JBR Beach, the nearest beach, is 17.5 km away.
Rated schools
No rated schools within 5 km
Getting around
- Expo 2020Red Line7.4 kmaway
- Al Maktoum AirportHigh-speed rail · planned7.6 kmaway
- Al Maktoum InternationalDWC7.6 kmaway
- Al YalayisEtihad Rail9.5 kmaway
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%Developer
- 10 finished
- 28 being built, on time
- 3 past their planned date
- Escrow bank
- Not on record
- Legal name
- Imtiaz South Real Estate Development L.L.C
Also being built by Imtiaz
| Project | Handover | Built |
|---|---|---|
| Beach Walk Residences 3 BY ImtiazDubai Islands | Q2 2026Past planned date | 100% |
| Cove Edition Residence 1 By ImtiazDubai Land Residence Complex | Q3 2026Past planned date | 90% |
| Cove Edition Residence 2 By ImtiazDubai Land Residence Complex | Q4 2026Past planned date | 60% |
| Luxur Tower By ImtiazJVC | Q4 2026Being built | 90% |
| Beach Walk Grand By ImtiazDubai Islands | Q4 2026Being built | 68% |
More questions about Enre Residence by Imtiaz
From AED 804k for a 420 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.27M and 2-bed flats sell for about AED 1.78M.
20/40/40: 20% on booking, 40% during construction, 40% on handover.
Q3 2028, the planned date in DLD’s register.
It is not past its planned date. It was 15% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 22 months.
169 homes on 9 floors: 17 studios of 355–483 sq ft, 65 1-bed flats of 733–904 sq ft and 87 2-bed flats of 1,107–1,450 sq ft.
About AED 41k a year for a studio, AED 57k for a 1-bed and AED 85k for a 2-bed in Dubai South, a gross yield of about 7.4% Estimate.
Of Imtiaz’s 41 projects on DLD’s record, 10 are finished. Of the 31 being built, 3 are past their planned date.
In Dubai South, 41 minutes by car to Downtown Dubai and 46 to Dubai Airport (DXB). Expo 2020 Metro station on the Red Line is 7.4 km away.
More nearby
Off-plan nearby
Finished buildings nearby
Typical next door AED 949/sq ft · 2 buildings within a 10-minute walk
- The Pulse Residence1,001AED/sq ft1-bed rent AED 55k/yr · 10-minute walk
- Tenora897AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- MAG 5 Boulevard1,124AED/sq ft1-bed rent AED 51k/yr
- Celestia1,109AED/sq ft1-bed rent AED 63k/yr
- Majestique Residence 21,318AED/sq ftNot enough rents
- Majestique Residence 11,209AED/sq ft1-bed rent AED 63k/yr