Easel Tower
International City Phase 2 and 3Newbury
Easel Tower is an off-plan project by Newbury in International City Phase 2 and 3, with 94 homes on 5 floors. DLD’s last inspection found it 0% built.
- Built
- 0%
- Handover
- Q3 2027
- Sales in 12 months
- No sales
- Homes
- 94
Progress
- Q3 2025Building started
- Jun 2026Last inspection · 0%
- Q3 2027Planned handover
DLD updates % built after each inspection, so work on site can be further along than this figure.
Homes
94 homes by size
- Studio60%56 homes · 398–464 sq ft · 6 layouts
- 1 bed38%36 homes · 750–954 sq ft · 10 layouts
- 2 beds2%2 homes · 1,343–2,043 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai30min
- Dubai Airport (DXB)25min
- Dubai Marina39min
By car. Mercato Beach, the nearest beach, is 17.1 km away.
Rated schools
- Repton SchoolUK/IB (Y 13) · Outstanding2.1 kmaway
- GEMS Wellington Academy -FzeUK · Very good3.4 kmaway
Getting around
- International City 2Blue Line · opens 202914 minwalk
- CentrepointRed Line9.3 kmaway
- MeydanEtihad Rail · planned9.8 kmaway
- Al JaddafHigh-speed rail · planned11 kmaway
- Dubai InternationalDXB12 kmaway
Developer
- 1 being built, on time
- 1 not started
- Escrow bank
- Al Ahli Bank of Kuwait
- Legal name
- Newbury Chapter Real Estate Development L.L.C
Also being built by Newbury
| Project | Handover | Built |
|---|---|---|
| Chapter 01 By Newbury DevelopmentsInternational City Phase 2 and 3 | Q4 2028Being built | 2% |
More questions about Easel Tower
Q3 2027, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection, with handover planned in 10 months.
94 homes on 5 floors: 56 studios of 398–464 sq ft, 36 1-bed flats of 750–954 sq ft and 2 2-bed flats of 1,343–2,043 sq ft.
About AED 40k a year for a studio, AED 56k for a 1-bed and AED 72k for a 2-bed in International City Phase 2 and 3, a gross yield of about 7.7% Estimate.
Of Newbury’s 2 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.
In International City Phase 2 and 3, 30 minutes by car to Downtown Dubai and 25 to Dubai Airport (DXB). Centrepoint Metro station on the Red Line is 9.3 km away.
More nearby
Off-plan nearby
- Moonsa ResidencesNo sales95% built · Past planned date
- Chapter 01 by Newbury DevelopmentsFrom AED 514k2% built · Planned Q4 2028
- Park ResidencyFrom AED 562k0% built · Planned Q3 2029
- NestFrom AED 451k1% built · Planned Q2 2027
- Sports View Residence 2 by Al Helal Al ZahabyFrom AED 564k13% built · Planned Q1 2027
- Kiwi Yard ResidencesNo sales55% built · Past planned date
Finished buildings nearby
Typical next door AED 894/sq ft · 11 buildings within a 10-minute walk
- Ritz Residence786AED/sq ft1-bed rent AED 52k/yr · 10-minute walk
- Berlin Group778AED/sq ftNot enough rents · 10-minute walk
- Glorious Central Residences1,283AED/sq ft1-bed rent AED 65k/yr · 10-minute walk
- Park ville 07892AED/sq ft1-bed rent AED 45k/yr · 10-minute walk
- Equiti Apartments920AED/sq ft1-bed rent AED 53k/yr · 10-minute walk
- Hz Residences 4975AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Rokane G231,005AED/sq ftNot enough rents · 10-minute walk
- Aamna Residency811AED/sq ftNot enough rents · 10-minute walk
- BNH Smart Tower894AED/sq ftNot enough rents · 10-minute walk
- Al Jawzaa785AED/sq ft1-bed rent AED 55k/yr · 10-minute walk
- KHK 211,086AED/sq ftNot enough rents · 10-minute walk
- HZ Residences 5882AED/sq ft1-bed rent AED 61k/yr
- Modelux Tower 1917AED/sq ftNot enough rents
- Al Helal Al Zahaby 2882AED/sq ft1-bed rent AED 52k/yr
- Easy 181,158AED/sq ft1-bed rent AED 51k/yr