Moonsa Residences
International City Phase 2 and 3Dugasta
Moonsa Residences is an off-plan project by Dugasta in International City Phase 2 and 3, with 93 homes on 7 floors. DLD’s last inspection, on 26 Oct 2026, found it 95% built.
- Built
- 95%
- Handover
- Q3 2025
- Sales in 12 months
- 15
- Homes
- 93
About
Moonsa Residences is a 7-floor building of 93 homes in International City Phase 2 and 3, in a gated neighbourhood of tree-lined streets. Homes run from studios to 3-bed flats, with studios the largest group. Residents share a pool and kids’ pool, a jacuzzi and EV charging points.
- Gated, tree-lined neighbourhood
- Jacuzzi and kids’ pool
- EV charging points
Shared facilities
- Pool
- Kids’ pool
- Jacuzzi
- Gym
- Kids’ play area
- EV charging
Progress
- Q1 2024Building started
- Jul–Sep 2024Launch sales · 0
- Q3 2025Planned handover · passed
- Oct 2026Last inspection · 95%
Prices
Price per sq ft
Typical price by size
- 1 bed
- Not enough sales2 sales
Against 20 International City Phase 2 and 3 off-plan projects with 10 or more sales
- Lowest1,017AED/sq ft
- Typical1,169AED/sq ft
- Moonsa Residences1,318AED/sq ft
- Highest1,501AED/sq ft
6th highest of 20 · AED per sq ft in 12 months
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Oct 2026 · 1 sale | ||||
| 19 Oct 2026 | 2 beds | 828 | 1,422 | AED 1.18M |
| Sep 2026 · 1 sale | ||||
| 23 Sep 2026 | 1 bed | 840 | 1,427 | AED 1.2M |
| Jun 2026 · 1 sale | ||||
| 5 Jun 2026 | 1 bed | 840 | 1,400 | AED 1.18M |
| Apr 2026 · 1 sale | ||||
| 22 Apr 2026 | Studio | 357 | 1,231 | AED 440k |
| Jan 2026 · 9 sales | ||||
| 14 Jan 2026 | Studio | 349 | 1,214 | AED 424k |
| 5 Jan 2026 | Studio | 349 | 1,315 | AED 459k |
| 5 Jan 2026 | 2 beds | 828 | 1,350 | AED 1.12M |
| 5 Jan 2026 | 2 beds | 1,428 | 1,400 | AED 2M |
| 5 Jan 2026 | Studio | 349 | 1,318 | AED 460k |
| 5 Jan 2026 | Studio | 349 | 1,272 | AED 444k |
| 5 Jan 2026 | Studio | 349 | 1,320 | AED 461k |
| 5 Jan 2026 | Studio | 349 | 1,318 | AED 460k |
| 2 Jan 2026 | 2 beds | 1,870 | 1,300 | AED 2.43M |
| Nov 2025 · 2 sales | ||||
| 4 Nov 2025 | Studio | 349 | 1,219 | AED 425k |
| 3 Nov 2025 | 1 bed | 840 | 1,376 | AED 1.16M |
Homes
93 homes by size
- Studio43%40 homes · 285–659 sq ft · 8 layouts
- 1 bed27%25 homes · 773–1,640 sq ft · 5 layouts
- 2 beds26%24 homes · 765–1,879 sq ft · 5 layouts
- 3 beds4%4 homes · 2,165 sq ft · 1 layout
Location
Drive times
- Downtown Dubai30min
- Dubai Airport (DXB)25min
- Dubai Marina39min
By car. Mercato Beach, the nearest beach, is 16.8 km away.
Rated schools
- Repton SchoolUK/IB (Y 13) · Outstanding1.9 kmaway
- GEMS Wellington Academy -FzeUK · Very good3.4 kmaway
Getting around
- International City 2Blue Line · opens 202915 minwalk
- CentrepointRed Line9.3 kmaway
- MeydanEtihad Rail · planned9.6 kmaway
- Al JaddafHigh-speed rail · planned11 kmaway
- Dubai InternationalDXB12 kmaway
Developer
- 1 finished
- 5 being built, on time
- 1 past their planned date
- Escrow bank
- Mashreq Bank
- Legal name
- Dugasta Properties Development L.L.C
Also being built by Dugasta
| Project | Handover | Built |
|---|---|---|
| Al Haseen Residence 4Dubai Industrial City | Q4 2026Being built | 12% |
| Moonsa Residences 2International City Phase 2 and 3 | Q4 2026Being built | 1% |
| Terra TowerDubai Land Residence Complex | Q2 2027Being built | 7% |
| Al Haseen Residence 3Dubai Industrial City | Q2 2027Being built | 10% |
| Astra ResidencesDubai South | Q3 2027Being built | 15% |
More questions about Moonsa Residences
Q3 2025, the planned date in DLD’s register.
No. It is 14 months past its planned date, and was 95% built at DLD’s last inspection on 26 Oct 2026.
93 homes on 7 floors: 40 studios of 285–659 sq ft, 25 1-bed flats of 773–1,640 sq ft, 24 2-bed flats of 765–1,879 sq ft and 4 3-bed flats of 2,165 sq ft.
About AED 40k a year for a studio, AED 56k for a 1-bed, AED 72k for a 2-bed and AED 100k for a 3-bed in International City Phase 2 and 3, a gross yield of about 7.7% Estimate.
Of Dugasta’s 7 projects on DLD’s record, 1 are finished. Of the 6 being built, 1 is past its planned date.
In International City Phase 2 and 3, 30 minutes by car to Downtown Dubai and 25 to Dubai Airport (DXB). Centrepoint Metro station on the Red Line is 9.3 km away.
More nearby
Off-plan nearby
- NestFrom AED 451k1% built · Planned Q2 2027
- Sports View Residence 2 by Al Helal Al ZahabyFrom AED 564k13% built · Planned Q1 2027
- Easel TowerNo sales0% built · Planned Q3 2027
- Tavora Grand by JHKNo sales0% built · Planned Q1 2029
- Elevia ResidencesFrom AED 550k9% built · Planned Q2 2027
- The Maiden ResidenceFrom AED 456k73% built · Past planned date
Finished buildings nearby
Typical next door AED 906/sq ft · 12 buildings within a 10-minute walk
- Glorious Central Residences1,283AED/sq ft1-bed rent AED 65k/yr · 10-minute walk
- Ritz Residence786AED/sq ft1-bed rent AED 52k/yr · 10-minute walk
- BNH Smart Tower894AED/sq ftNot enough rents · 10-minute walk
- HZ Residences 5882AED/sq ft1-bed rent AED 61k/yr · 10-minute walk
- Berlin Group778AED/sq ftNot enough rents · 10-minute walk
- KHK 211,086AED/sq ftNot enough rents · 10-minute walk
- Hz Residences 4975AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Modelux Tower 1917AED/sq ftNot enough rents · 10-minute walk
- Al Helal Al Zahaby Building942AED/sq ftNot enough rents · 10-minute walk
- Al Helal Al Zahaby 2882AED/sq ft1-bed rent AED 52k/yr · 10-minute walk
- Rokane G231,005AED/sq ftNot enough rents · 10-minute walk
- Park ville 07892AED/sq ft1-bed rent AED 45k/yr · 10-minute walk
- Al Jawzaa785AED/sq ft1-bed rent AED 55k/yr
- Equiti Apartments920AED/sq ft1-bed rent AED 53k/yr
- Aamna Residency811AED/sq ftNot enough rents
- Easy 181,158AED/sq ft1-bed rent AED 51k/yr
