
Terra Tower
Dubai Land Residence ComplexDugasta
Terra Tower is an off-plan project by Dugasta in Dubai Land Residence Complex, with 366 homes on 12 floors. DLD’s last inspection, on 26 Oct 2026, found it 7% built.
- Built
- 7%
- Handover
- Q2 2027
- Since launch
- Up 10%Studio price per sq ft
- Homes
- 366
About
Terra Tower is a 12-floor building of 366 homes in Dubai Land Residence Complex. Most homes are studios, with 1-bed, 2-bed and a few 3-bed flats, many with large balconies and some with a terrace garden. Residents share a terrace garden, an outdoor cinema and pools for adults and children.
- Mostly studios
- Some flats with a terrace garden
- Outdoor cinema
Shared facilities
- Pool
- Kids’ pool
- Gym
- Terrace garden
- Outdoor cinema
- Play area
- Outdoor seating
Progress
- Q4 2024Building started
- Dec 2024 – Feb 2025Launch sales · 160
- Oct 2026Last inspection · 7%
- Q2 2027Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 566k359 sq ft · 1,663 AED/sq ft · 18 sales
- 1 bed
- AED 1.06M720 sq ft · 1,514 AED/sq ft · 18 sales
- 2 beds
- AED 1.79M1,118 sq ft · 1,576 AED/sq ft · 8 sales
- 3 beds
- Not enough sales1 sale
Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales
- Lowest810AED/sq ft
- Typical1,386AED/sq ft
- Terra Tower1,550AED/sq ft
- Highest1,737AED/sq ft
19th highest of 72 · AED per sq ft in 12 months
Latest sales
Plus 1 newer sale, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 17 Nov 2026 | Studio New | 351 | 1,903 | AED 668k |
| Oct 2026 · 2 sales | ||||
| 13 Oct 2026 | Studio | 351 | 1,698 | AED 596k |
| 5 Oct 2026 | 1 bed | 740 | 1,550 | AED 1.15M |
| Sep 2026 · 13 sales | ||||
| 24 Sep 2026 | 1 bed | 720 | 1,449 | AED 1.04M |
| 23 Sep 2026 | Studio | 351 | 1,698 | AED 596k |
| 23 Sep 2026 | Studio | 292 | 1,448 | AED 423k |
| 14 Sep 2026 | 2 beds | 937 | 1,227 | AED 1.15M |
| 14 Sep 2026 | 1 bed | 763 | 1,528 | AED 1.17M |
| 14 Sep 2026 | 2 beds | 1,083 | 1,327 | AED 1.44M |
| 14 Sep 2026 | 2 beds | 1,290 | 1,551 | AED 2M |
| 14 Sep 2026 | Studio | 367 | 1,500 | AED 550k |
| 14 Sep 2026 | 1 bed | 595 | 1,451 | AED 863k |
| 14 Sep 2026 | Studio | 333 | 1,399 | AED 466k |
| 14 Sep 2026 | Studio | 351 | 1,598 | AED 561k |
| 14 Sep 2026 | Studio | 367 | 1,700 | AED 624k |
| 11 Sep 2026 | 1 bed | 740 | 1,920 | AED 1.42M |
| Aug 2026 · 9 sales | ||||
| 17 Aug 2026 | Studio | 351 | 1,624 | AED 570k |
| 17 Aug 2026 | 3 beds | 1,708 | 1,800 | AED 3.07M |
| 17 Aug 2026 | Studio | 367 | 1,800 | AED 661k |
| 17 Aug 2026 | 1 bed | 684 | 1,104 | AED 755k |
| 17 Aug 2026 | 1 bed | 720 | 1,599 | AED 1.15M |
| 17 Aug 2026 | 1 bed | 595 | 1,601 | AED 953k |
| 17 Aug 2026 | 1 bed | 740 | 1,600 | AED 1.18M |
| 17 Aug 2026 | 2 beds | 937 | 1,200 | AED 1.12M |
| 17 Aug 2026 | 2 beds | 1,048 | 1,600 | AED 1.68M |
| Jul 2026 · 1 sale | ||||
| 15 Jul 2026 | Studio | 367 | 1,500 | AED 550k |
| Jun 2026 · 2 sales | ||||
| 18 Jun 2026 | 1 bed | 723 | 1,500 | AED 1.08M |
| 5 Jun 2026 | Studio | 370 | 1,861 | AED 688k |
| May 2026 · 1 sale | ||||
| 7 May 2026 | 2 beds | 1,290 | 1,727 | AED 2.23M |
| Mar 2026 · 3 sales | ||||
| 30 Mar 2026 | Studio | 367 | 1,824 | AED 669k |
| 30 Mar 2026 | 2 beds | 1,153 | 1,648 | AED 1.9M |
| 10 Mar 2026 | Studio | 367 | 1,530 | AED 561k |
| Feb 2026 · 11 sales | ||||
| 26 Feb 2026 | Studio | 370 | 1,854 | AED 686k |
| 24 Feb 2026 | Studio | 351 | 1,698 | AED 596k |
| 23 Feb 2026 | 1 bed | 710 | 1,470 | AED 1.04M |
| 23 Feb 2026 | 1 bed | 694 | 1,379 | AED 957k |
| 19 Feb 2026 | Studio | 367 | 1,300 | AED 477k |
| 19 Feb 2026 | 1 bed | 595 | 1,151 | AED 685k |
| 19 Feb 2026 | 1 bed | 595 | 1,151 | AED 685k |
| 19 Feb 2026 | 1 bed | 740 | 1,600 | AED 1.18M |
| 19 Feb 2026 | Studio | 351 | 1,398 | AED 491k |
| 19 Feb 2026 | 1 bed | 747 | 1,607 | AED 1.2M |
| 2 Feb 2026 | 1 bed | 710 | 1,440 | AED 1.02M |
| Jan 2026 · 1 sale | ||||
| 16 Jan 2026 | 2 beds | 1,290 | 1,800 | AED 2.32M |
| Nov 2025 · 1 sale | ||||
| 10 Nov 2025 | 1 bed | 720 | 1,535 | AED 1.11M |
Homes
366 homes by size
- Studio55%201 homes · 250–370 sq ft · 8 layouts
- 1 bed31%113 homes · 549–763 sq ft · 10 layouts
- 2 beds11%41 homes · 937–1,290 sq ft · 5 layouts
- 3 beds3%11 homes · 1,400–2,394 sq ft · 9 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 2.23MLocation
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)27min
- Dubai Marina35min
By car. Jumeirah Open Beach, the nearest beach, is 17.8 km away.
Rated schools
- GEMS Wellington Academy -FzeUK · Very good2.7 kmaway
Getting around
- Dubai Silicon OasisBlue Line · opens 20293.0 kmaway
- MeydanEtihad Rail · planned9.6 kmaway
- CreekGreen Line14 kmaway
- Al JaddafHigh-speed rail · planned15 kmaway
- Dubai InternationalDXB17 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%Developer
- 1 finished
- 5 being built, on time
- 1 past their planned date
- Escrow bank
- Mashreq Bank
- Legal name
- Dugasta Properties Development L.L.C
Also being built by Dugasta
| Project | Handover | Built |
|---|---|---|
| MOONSA ResidencesInternational City Phase 2 and 3 | Q3 2025Past planned date | 95% |
| Al Haseen Residence 4Dubai Industrial City | Q4 2026Being built | 12% |
| Moonsa Residences 2International City Phase 2 and 3 | Q4 2026Being built | 1% |
| Al Haseen Residence 3Dubai Industrial City | Q2 2027Being built | 10% |
| Astra ResidencesDubai South | Q3 2027Being built | 15% |
More questions about Terra Tower
From AED 566k for a 359 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.06M and 2-bed flats sell for about AED 1.79M.
Q2 2027, the planned date in DLD’s register.
It is not past its planned date. It was 7% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 7 months.
366 homes on 12 floors: 201 studios of 250–370 sq ft, 113 1-bed flats of 549–763 sq ft, 41 2-bed flats of 937–1,290 sq ft and 11 3-bed flats of 1,400–2,394 sq ft.
Up 8% for 1-bed flats, per sq ft. Against the launch sales of Dec 2024 – Feb 2025: studios up 10%, 2-bed flats up 18%.
About AED 40k a year for a studio, AED 56k for a 1-bed, AED 73k for a 2-bed and AED 100k for a 3-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.
Of Dugasta’s 7 projects on DLD’s record, 1 are finished. Of the 6 being built, 1 is past its planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.23M.
In Dubai Land Residence Complex, 27 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). Creek Metro station on the Green Line is 14 km away.
More nearby
Off-plan nearby
- Celesto Tower 2From AED 560k0% built · Planned Q2 2028
- Cove Edition Residence 3 by ImtiazFrom AED 652k37% built · Planned Q4 2026
- Empire GardensFrom AED 825k0% built · Planned Q4 2028
- Floarea OasisFrom AED 694k13% built · Planned Q4 2028
- Celesto Tower 3From AED 535k0% built · Planned Q3 2028
- Weybridge Gardens 2From AED 566k34% built · Handover not on record
Finished buildings nearby
Typical next door AED 754/sq ft · 7 buildings within a 10-minute walk
- Ajmal Sarah754AED/sq ft1-bed rent AED 50k/yr · 10-minute walk
- Qpoint Liwan-Plot R072718AED/sq ft1-bed rent AED 54k/yr · 10-minute walk
- Qpoint Liwan-Plot R070817AED/sq ft1-bed rent AED 50k/yr · 10-minute walk
- Qpoint Liwan-Plot R069659AED/sq ft1-bed rent AED 49k/yr · 10-minute walk
- Qpoint Liwan-Plot R068630AED/sq ft1-bed rent AED 50k/yr · 10-minute walk
- Time 11,222AED/sq ft1-bed rent AED 55k/yr · 10-minute walk
- Blue Wave953AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Sky Courts724AED/sq ft1-bed rent AED 50k/yr
- The V Tower1,012AED/sq ft1-bed rent AED 60k/yr
- Desert Sun Tower827AED/sq ft1-bed rent AED 57k/yr
- Durar 1945AED/sq ft1-bed rent AED 57k/yr