Skip to content

Al Haseen Residence 4

Dubai Industrial CityDugasta

FromAED 572kStudio · 385 sq ft

Al Haseen Residence 4 is an off-plan project by Dugasta in Dubai Industrial City, with 248 homes on 5 floors. DLD’s last inspection, on 26 Oct 2026, found it 12% built.

Built
12%
Handover
Q4 2026
Since launch
Up 2%Studio price per sq ft
Homes
248

Progress

12%built
  1. May–Jul 2025Launch sales · 14
  2. Q2 2025Building started
  3. Oct 2026Last inspection · 12%
  4. Q4 2026Planned handover

Prices

Price per sq ft

1,470 AED/sq ft101 sales in 12 months

Typical price by size

Studio
AED 572k385 sq ft · 101 sales

Against 11 Dubai Industrial City off-plan projects with 10 or more sales

  • Lowest1,215AED/sq ft
  • Al Haseen Residence 41,470AED/sq ft
  • Highest1,598AED/sq ft

6th lowest of 11 · AED per sq ft in 12 months

Latest sales

Newest first
101 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 9 sales
13 Oct 2026Studio3851,634AED 629k
13 Oct 2026Studio3851,634AED 629k
13 Oct 2026Studio3811,702AED 648k
13 Oct 2026Studio3851,634AED 629k
12 Oct 2026Studio3841,399AED 537k
12 Oct 2026Studio3811,399AED 533k
12 Oct 2026Studio3851,700AED 654k
7 Oct 2026Studio3791,400AED 531k
6 Oct 2026Studio3841,399AED 537k
Sep 2026 · 7 sales
23 Sep 2026Studio3811,535AED 585k
23 Sep 2026Studio3791,600AED 606k
11 Sep 2026Studio3851,559AED 600k
11 Sep 2026Studio3861,501AED 579k
8 Sep 2026Studio2921,319AED 385k
8 Sep 2026Studio3811,208AED 460k
8 Sep 2026Studio3851,208AED 465k
Aug 2026 · 3 sales
18 Aug 2026Studio3851,573AED 605k
17 Aug 2026Studio3851,492AED 574k
17 Aug 2026Studio3851,208AED 465k
Jul 2026 · 3 sales
20 Jul 2026Studio3851,668AED 642k
20 Jul 2026Studio3811,399AED 533k
20 Jul 2026Studio5411,383AED 748k
Jun 2026 · 14 sales
19 Jun 2026Studio3841,167AED 448k
19 Jun 2026Studio3811,168AED 445k
19 Jun 2026Studio3811,168AED 445k
19 Jun 2026Studio3811,168AED 445k
18 Jun 2026Studio3791,169AED 443k
18 Jun 2026Studio3661,167AED 427k
18 Jun 2026Studio3661,167AED 427k
18 Jun 2026Studio3661,167AED 427k
18 Jun 2026Studio3811,168AED 445k
18 Jun 2026Studio3811,168AED 445k
12 Jun 2026Studio3861,246AED 481k
12 Jun 2026Studio3791,600AED 606k
12 Jun 2026Studio3851,600AED 616k
12 Jun 2026Studio3851,500AED 577k
May 2026 · 6 sales
19 May 2026Studio3851,536AED 591k
13 May 2026Studio3861,451AED 560k
12 May 2026Studio3811,352AED 515k
12 May 2026Studio3941,455AED 573k
12 May 2026Studio3811,352AED 515k
6 May 2026Studio3791,600AED 606k
Apr 2026 · 1 sale
21 Apr 2026Studio3901,470AED 573k
Mar 2026 · 4 sales
30 Mar 2026Studio3791,182AED 448k
16 Mar 2026Studio4281,394AED 597k
2 Mar 2026Studio3851,402AED 540k
2 Mar 2026Studio3851,367AED 526k
Feb 2026 · 10 sales
27 Feb 2026Studio3831,552AED 595k
26 Feb 2026Studio3791,470AED 557k
24 Feb 2026Studio3851,500AED 577k

Homes

248 homes by size

  • Studio96%238 homes · 292–541 sq ft · 10 layouts
  • 1 bed2%5 homes · 1,058 sq ft · 1 layout
  • 2 beds2%5 homes · 1,153 sq ft · 1 layout

Location

Drive times

  • Downtown Dubai44min
  • Dubai Airport (DXB)52min
  • Dubai Marina33min

By car. Jebel Ali Beach, the nearest beach, is 12.7 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Al Maktoum AirportHigh-speed rail · planned13 kmaway
  • Al Maktoum InternationalDWC13 kmaway
  • Life PharmacyRed Line13 kmaway
  • Al YalayisEtihad Rail21 kmaway
Area guideDubai Industrial CityFinished homesAED 1,060/sq ft1-bed rentAED 50k/yrGross yieldEstimate7.7%

Developer

  • 1 finished
  • 5 being built, on time
  • 1 past their planned date
Escrow bank
Emirates NBD Bank
Legal name
Dugasta Properties Development L.L.C

Also being built by Dugasta

Dugasta’s other projects
ProjectHandoverBuilt
MOONSA ResidencesInternational City Phase 2 and 3Q3 2025Past planned date95%
Moonsa Residences 2International City Phase 2 and 3Q4 2026Being built1%
Terra TowerDubai Land Residence ComplexQ2 2027Being built7%
Al Haseen Residence 3Dubai Industrial CityQ2 2027Being built10%
Astra ResidencesDubai SouthQ3 2027Being built15%
All 7 Dugasta projects
Questions

More questions about Al Haseen Residence 4

From AED 572k for a 385 sq ft studio, the lowest typical price paid in the 12 months.

Q4 2026, the planned date in DLD’s register.

It is not past its planned date. It was 12% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.

248 homes on 5 floors: 238 studios of 292–541 sq ft, 5 1-bed flats of 1,058 sq ft and 5 2-bed flats of 1,153 sq ft.

Up 2% for studios, per sq ft.

About AED 38k a year for a studio, AED 50k for a 1-bed and AED 70k for a 2-bed in Dubai Industrial City, a gross yield of about 7.7% Estimate.

Of Dugasta’s 7 projects on DLD’s record, 1 are finished. Of the 6 being built, 1 is past its planned date.

In Dubai Industrial City, 44 minutes by car to Downtown Dubai and 52 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is 13 km away.

More nearby

How the numbers work

FromAED 572kSee it on the map