Skip to content

Coventry Residence

Dubai Industrial CityGFS

FromAED 504kStudio · 393 sq ft

Coventry Residence is an off-plan project by GFS in Dubai Industrial City, with 163 homes on 5 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q4 2027
Sales in 12 months
7
Homes
163

Progress

0%built
  1. Q3 2025Building started
  2. Oct 2026Last inspection · 0%
  3. Q4 2027Planned handover

Prices

Price per sq ft

1,253 AED/sq ft7 sales in 12 months

Typical price by size

Studio
AED 504k393 sq ft · 1,259 AED/sq ft · 6 sales
1 bed
Not enough sales1 sale

Against 11 Dubai Industrial City off-plan projects with 10 or more sales

  • Lowest1,215AED/sq ft
  • Coventry Residence1,253AED/sq ft
  • Typical1,470AED/sq ft
  • Highest1,598AED/sq ft

Latest sales

Newest first
7 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 2 sales
27 Oct 2026Studio3801,220AED 463k
14 Oct 20261 bed704893AED 629k
Aug 2026 · 1 sale
24 Aug 2026Studio4291,245AED 534k
Jul 2026 · 3 sales
30 Jul 2026Studio3861,373AED 530k
23 Jul 2026Studio3911,253AED 490k
22 Jul 2026Studio3941,265AED 498k
Jun 2026 · 1 sale
15 Jun 2026Studio3961,288AED 510k

Homes

163 homes by size

  • Studio89%145 homes · 380–437 sq ft · 8 layouts
  • 1 bed11%18 homes · 677–1,070 sq ft · 6 layouts

Location

Drive times

  • Downtown Dubai44min
  • Dubai Airport (DXB)52min
  • Dubai Marina33min

By car. Jebel Ali Beach, the nearest beach, is 12.5 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Al Maktoum AirportHigh-speed rail · planned12 kmaway
  • Al Maktoum InternationalDWC12 kmaway
  • Life PharmacyRed Line13 kmaway
  • Al YalayisEtihad Rail20 kmaway
Area guideDubai Industrial CityFinished homesAED 1,060/sq ft1-bed rentAED 50k/yrGross yieldEstimate7.7%

Developer

  • 5 being built, on time
Escrow bank
Abu Dhabi Islamic Bank
Legal name
G F S Real Estate L.L.C

Also being built by GFS

GFS’s other projects
ProjectHandoverBuilt
Coventry GardensDubai Land Residence ComplexQ1 2027Being built1%
Coventry 66Dubai SouthQ2 2027Being built0%
Coventry Residence 3Dubai Industrial CityQ4 2027Being built0%
GFS Coventry Gardens IIDubai Land Residence ComplexQ4 2027Being built1%
All 5 GFS projects
Questions

More questions about Coventry Residence

From AED 504k for a 393 sq ft studio, the lowest typical price paid in the 12 months.

Q4 2027, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.

163 homes on 5 floors: 145 studios of 380–437 sq ft and 18 1-bed flats of 677–1,070 sq ft.

About AED 38k a year for a studio and AED 50k for a 1-bed in Dubai Industrial City, a gross yield of about 7.7% Estimate.

Of GFS’s 5 projects on DLD’s record, 0 are finished. Of the 5 being built, none is past its planned date.

In Dubai Industrial City, 44 minutes by car to Downtown Dubai and 52 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is 13 km away.

More nearby

How the numbers work

FromAED 504kSee it on the map