
Dubai Industrial City
Dubaiسيح شعيب 2Also known as Saih Shuaib 2
Dubai Industrial City has 2 finished buildings, 3 villa communities and 16 off-plan projects. Flats sold for a typical AED 1,060 per sq ft in 12 months, 22% below Dubai.
- Price per sq ft
- 1,060AED
- 1-bed rent
- 50kAED a year
- Gross yieldEstimate
- 7.7%Flats, every size
- Buildings
- 222 finished-home sales
- New homes due
- 2,29816 off-plan projects
About
DLD’s register lists 170 homes here, most of them 1-beds, then 2-beds. Of the 2 buildings with an opening year on record, 1 opened in 2019 or later. 97% of its flat sales in 12 months were off-plan.
- Best for buying below dubai’s price
- Best for rental income
- Best for first homes
- Watch out for no metro station
Prices
Price per sq ft
Typical price by size
- Studio
- AED 441k8 sales
- 1 bed
- AED 1M8 sales
- 2 beds
- AED 856k6 sales
- 3 beds
- Not enough sales0 sales
- 4+ beds
- Not enough sales0 sales
Against all of Dubai
- Entry level here962AED/sq ft
- Dubai Industrial City1,060AED/sq ft
- High end here1,323AED/sq ft
- Dubai1,362AED/sq ft
15th cheapest of 60 areas · finished flats, 12 months
Against next door
- Not enough sales
- Saih Shuaib 1AED 55k/yr10% pricier
- Not enough rents
Rent
Rent by size
- Studio
- AED 38k/yr261 rents · yield 8.6%
- 1 bed
- AED 50k/yr181 rents · yield 5.0%
- 2 beds
- AED 70k/yr151 rents · yield 8.2%
The 32nd cheapest 1-bed rent of 121 areas. 593 new rent contracts were signed here in 12 months. Gross yields are an Estimate. Rent in every Dubai area
Villas
Villa communities in Dubai Industrial City
17 villa sales in 12 months| Community | Sales | Typical home |
|---|---|---|
| Sahara Meadows 1 | 10 | AED 1.18M |
| Sahara Meadows 2 | 4 | AED 620k |
| Dubai Spanish Twin Villa | 3 | AED 2M |
Buildings
Every building
1 building · lowest price first, those with 10 or more sales first| Building | AED/sq ft | Sales | Gross yield |
|---|---|---|---|
| Al Haseen Residence | 1,050 | 3 | 6.5% |
170 homes by size
2 buildings- Studio25%42 homes
- 1 bed49%84 homes
- 2 beds26%44 homes
Off-plan
- Homes due
- 2,298
- Projects
- 16
- Past planned date
- 1
When the new homes are due
- 201384homes
- 2026248homes
- 2027551homes
- 20281,129homes
- 2029286homes
Past planned date
Every project
16 projects, most sold first| Project | Handover | Built | Homes | From | Sales |
|---|---|---|---|---|---|
| Samana Hills South 3Samana | Q3 2028 | 5% | 147 | AED 655kStudio | 145 |
| Samana South HavenSamana | Q4 2028 | 0% | 200 | AED 621kStudio | 119 |
| South Lofts by Premier ChoicePremier Choice | Q1 2029 | 0% | 149 | AED 459kStudio | 103 |
| Al Haseen Residence 4Dugasta | Q4 2026 | 12% | 248 | AED 572kStudio | 101 |
| Al Haseen Residence 3Dugasta | Q2 2027 | 10% | 180 | AED 574kStudio | 73 |
| Elanora by zoyaZoya | Q1 2028 | 0% | 117 | AED 586kStudio | 54 |
| Samana Hills South 2Samana | Q3 2028 | 5% | 140 | AED 653kStudio | 44 |
| Samana Hills SouthSamana | Q2 2028 | 12% | 510 | AED 570kStudio | 35 |
| Coventry Residence 3GFS | Q4 2027 | 0% | 185 | AED 508kStudio | 18 |
| Samana South Haven 2Samana | Q2 2029 | 0% | 137 | AED 674kStudio | 9 |
| South Park Residences 2 by WellingtonWellington | Q2 2028 | 99% | 15 | AED 2.55M4+ beds | 9 |
| Coventry ResidenceGFS | Q4 2027 | 0% | 163 | AED 504kStudio | 7 |
| South Park Residences by WellingtonWellington | Q4 2027 | 97% | 23 | AED 2.6M4+ beds | 7 |
| Sahara LivingsKifata | Q2 2013Past planned date | 93% | 84 | No sales | No sales |
| South Lofts 2 by Premier ChoicePremier Choice | Q4 2029 | 0% | – | No sales | No sales |
| Vivo Residences South by Main RealtyMain Realty | Q1 2029 | – | – | No sales | No sales |
Location
Drive times
- Downtown Dubai44min
- Dubai Airport (DXB)52min
- Dubai Marina33min
By car. Jebel Ali Beach, the nearest beach, is 11.7 km away.
Rated schools
No rated schools within 5 km
Getting around
- Al Maktoum AirportHigh-speed rail · planned8.9 kmaway
- Al Maktoum InternationalDWC8.9 kmaway
- Life PharmacyRed Line9.6 kmaway
- Al YalayisEtihad Rail17 kmaway
- Bus F53, F55 and F49
Getting to work
| To | Car | Metro and bus | Nol |
|---|---|---|---|
| DIFC | 44 min | – | – |
| Dubai Media City | 34 min | 1 hr 51 min | AED 330/mo |
| Downtown Dubai | 44 min | – | – |
| Dubai International Airport (DXB) | 52 min | – | – |
| Jebel Ali Free Zone | 27 min | 1 hr 41 min | AED 132/mo |
| Dubai Internet City | 34 min | 1 hr 54 min | AED 330/mo |
| Dubai Knowledge Park | 35 min | – | – |
| Dubai Airport Free Zone | 52 min | – | – |
| Dubai Healthcare City | 46 min | – | – |
Travel times © openrouteservice.org by HeiGIT, map data © OpenStreetMap contributors · Public transport timetables © RTA, Dubai open data
More questions about Dubai Industrial City
About AED 38k a year for a studio, AED 50k for a 1-bed and AED 70k for a 2-bed. The 32nd cheapest 1-bed rent of 121 areas. 593 new rent contracts were signed here in 12 months.
A studio sells for about AED 441k, a 1-bed sells for about AED 1M and a 2-bed sells for about AED 856k, the typical price paid in 12 months.
About 7.7% gross Estimate. Studios earn the most, 8.6% gross. 97% of flat sales here are off-plan.
No.
44 min by car at 8am on a weekday.
2,298 homes in 16 off-plan projects, 1 project past its planned date.
DLD and Dubai Municipality call it Saih Shuaib 2 (سيح شعيب 2). Title deeds and rent contracts use that name.
More nearby
Most searched projects
Developer's pictureSamana Hills SouthFrom AED 570k12% built · Planned Q2 2028
Developer's pictureSamana South HavenFrom AED 621k0% built · Planned Q4 2028
Developer's pictureSouth Park Residences by WellingtonFrom AED 2.6M97% built · Planned Q4 2027
Developer's pictureCoventry Residence 3From AED 508k0% built · Planned Q4 2027
Developer's pictureSamana Hills South 2From AED 653k5% built · Planned Q3 2028
Developer's pictureAl Haseen Residence 3From AED 574k10% built · Planned Q2 2027
Developer's pictureSamana Hills South 3From AED 655k5% built · Planned Q3 2028
Developer's pictureAl Haseen Residence 4From AED 572k12% built · Planned Q4 2026