Samana South Haven
Dubai Industrial CitySamana
Samana South Haven is an off-plan project by Samana in Dubai Industrial City, with 200 homes on 6 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q4 2028
- Sales in 12 months
- 119
- Homes
- 200
About
Samana South Haven is a 6-floor building of 200 homes in Dubai Industrial City, close to Al Maktoum International Airport. Most homes are 1-bed flats, with studios and a few 2-bed flats. Shared spaces include a Pilates studio, a library lounge and an outdoor cinema.
- Mostly 1-bed flats
- Pilates studio
- Outdoor cinema and library
Shared facilities
- Adults’ pool
- Kids’ pool
- Jacuzzi
- Sauna and steam room
- Pilates studio
- Library and lounge
- Outdoor cinema
- BBQ area
Progress
- Q2 2026Building started
- Oct 2026Last inspection · 0%
- Q4 2028Planned handover
- Q2 2029Developer’s date
Prices
Price per sq ft
Typical price by size
- Studio
- AED 621k369 sq ft · 1,686 AED/sq ft · 50 sales
- 1 bed
- AED 944k636 sq ft · 1,479 AED/sq ft · 65 sales
- 2 beds
- AED 1.17M996 sq ft · 1,225 AED/sq ft · 4 sales
Against 11 Dubai Industrial City off-plan projects with 10 or more sales
- Lowest1,215AED/sq ft
- Typical1,470AED/sq ft
- Samana South Haven1,570AED/sq ft
- Highest1,598AED/sq ft
2nd highest of 11 · AED per sq ft in 12 months
Samana’s own price starts at AED 599k. DLD’s AED 621k is the lowest typical price paid in the 12 months.
Latest sales
Plus 16 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 17 Nov 2026 | 1 bed New | 655 | 1,373 | AED 900k |
| 17 Nov 2026 | 1 bed New | 618 | 1,620 | AED 1M |
| 17 Nov 2026 | 1 bed New | 653 | 1,533 | AED 1M |
| 16 Nov 2026 | 1 bed New | 631 | 1,438 | AED 907k |
| 12 Nov 2026 | 1 bed New | 625 | 1,574 | AED 984k |
| 11 Nov 2026 | 1 bed New | 648 | 1,328 | AED 860k |
| 11 Nov 2026 | 1 bed New | 637 | 1,466 | AED 934k |
| 11 Nov 2026 | 1 bed New | 715 | 1,355 | AED 969k |
| 11 Nov 2026 | 1 bed New | 720 | 1,345 | AED 969k |
| 11 Nov 2026 | 2 beds New | 932 | 1,352 | AED 1.26M |
| 9 Nov 2026 | 1 bed New | 648 | 1,245 | AED 806k |
| 9 Nov 2026 | 1 bed New | 625 | 1,304 | AED 815k |
| 9 Nov 2026 | 1 bed New | 629 | 1,296 | AED 815k |
| 3 Nov 2026 | 1 bed New | 619 | 1,477 | AED 914k |
| 3 Nov 2026 | 1 bed New | 650 | 1,443 | AED 938k |
| 3 Nov 2026 | 1 bed New | 750 | 1,282 | AED 962k |
| Oct 2026 · 25 sales | ||||
| 30 Oct 2026 | 1 bed | 631 | 1,575 | AED 994k |
| 30 Oct 2026 | 1 bed | 673 | 1,418 | AED 954k |
| 28 Oct 2026 | 1 bed | 750 | 1,165 | AED 874k |
| 28 Oct 2026 | 1 bed | 554 | 1,668 | AED 924k |
| 26 Oct 2026 | 1 bed | 637 | 1,482 | AED 944k |
| 26 Oct 2026 | 1 bed | 645 | 1,360 | AED 877k |
| 22 Oct 2026 | 1 bed | 651 | 1,481 | AED 964k |
| 20 Oct 2026 | 1 bed | 591 | 1,479 | AED 874k |
| 20 Oct 2026 | 1 bed | 619 | 1,619 | AED 1M |
| 16 Oct 2026 | 1 bed | 652 | 1,525 | AED 994k |
| 15 Oct 2026 | 1 bed | 649 | 1,373 | AED 891k |
| 9 Oct 2026 | 1 bed | 625 | 1,478 | AED 924k |
| 6 Oct 2026 | 1 bed | 622 | 1,550 | AED 964k |
| 6 Oct 2026 | 1 bed | 879 | 1,192 | AED 1.05M |
| 6 Oct 2026 | 1 bed | 629 | 1,450 | AED 912k |
| 5 Oct 2026 | Studio | 356 | 1,386 | AED 493k |
| 5 Oct 2026 | 1 bed | 648 | 1,519 | AED 984k |
| 5 Oct 2026 | 1 bed | 637 | 1,570 | AED 1M |
| 5 Oct 2026 | 1 bed | 622 | 1,608 | AED 1M |
| 5 Oct 2026 | 2 beds | 952 | 1,125 | AED 1.07M |
| 5 Oct 2026 | 2 beds | 1,083 | 1,011 | AED 1.1M |
| 5 Oct 2026 | 1 bed | 663 | 1,424 | AED 944k |
| 5 Oct 2026 | 2 beds | 932 | 1,328 | AED 1.24M |
| 1 Oct 2026 | 1 bed | 637 | 1,478 | AED 941k |
| 1 Oct 2026 | Studio | 369 | 1,579 | AED 583k |
| Sep 2026 · 60 sales | ||||
| 29 Sep 2026 | 1 bed | 653 | 1,367 | AED 892k |
| 29 Sep 2026 | 1 bed | 559 | 1,653 | AED 924k |
| 28 Sep 2026 | 1 bed | 625 | 1,510 | AED 944k |
| 28 Sep 2026 | 1 bed | 680 | 1,418 | AED 964k |
| 25 Sep 2026 | 1 bed | 638 | 1,448 | AED 924k |
| 25 Sep 2026 | 1 bed | 651 | 1,414 | AED 920k |
| 25 Sep 2026 | 1 bed | 648 | 1,534 | AED 994k |
| 25 Sep 2026 | 1 bed | 618 | 1,505 | AED 930k |
| 24 Sep 2026 | 1 bed | 637 | 1,451 | AED 924k |
Homes
200 homes by size
- Studio27%54 homes · 356–373 sq ft · 3 layouts
- 1 bed70%140 homes · 556–879 sq ft · 17 layouts
- 2 beds3%6 homes · 932–1,083 sq ft · 4 layouts
Payment plan
Samana’s project pagePDC: 10% down · 5% month 4 · 10% month 12 · 1% x75 months. Non-PDC: 15% down · 5% month 4 · 10% month 12 · 1% x70 months
Location
Drive times
- Downtown Dubai44min
- Dubai Airport (DXB)52min
- Dubai Marina33min
By car. Jebel Ali Beach, the nearest beach, is 13.0 km away.
Rated schools
No rated schools within 5 km
Getting around
- Al Maktoum AirportHigh-speed rail · planned13 kmaway
- Al Maktoum InternationalDWC13 kmaway
- Life PharmacyRed Line13 kmaway
- Al YalayisEtihad Rail21 kmaway
Area guideDubai Industrial CityFinished homesAED 1,060/sq ft1-bed rentAED 50k/yrGross yieldEstimate7.7%Developer
- 6 finished
- 41 being built, on time
- 8 past their planned date
- 2 not started
- Escrow bank
- Not on record
- Legal name
- Samana Premium Real Estate Development L.L.C
Also being built by Samana
| Project | Handover | Built |
|---|---|---|
| Samana MykonosDubai Studio City | Q2 2025Past planned date | 91% |
| Samana WavesJVC | Q4 2025Past planned date | 91% |
| Miami BY SDJumeirah Village Triangle | Q4 2025Past planned date | 71% |
| Samana Waves 2JVC | Q1 2026Past planned date | 52% |
| Samana Mykonos SignatureArjan | Q2 2026Past planned date | 86% |
More questions about Samana South Haven
From AED 621k for a 369 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 944k and 2-bed flats sell for about AED 1.17M.
Q4 2028, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.
200 homes on 6 floors: 54 studios of 356–373 sq ft, 140 1-bed flats of 556–879 sq ft and 6 2-bed flats of 932–1,083 sq ft.
About AED 38k a year for a studio, AED 50k for a 1-bed and AED 70k for a 2-bed in Dubai Industrial City, a gross yield of about 7.7% Estimate.
Of Samana’s 57 projects on DLD’s record, 6 are finished. Of the 49 being built, 8 are past their planned date.
In Dubai Industrial City, 44 minutes by car to Downtown Dubai and 52 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is 13 km away.
More nearby
Off-plan nearby
- South Lofts by Premier ChoiceFrom AED 459k0% built · Planned Q1 2029
- Al Haseen Residence 3From AED 574k10% built · Planned Q2 2027
- Al Haseen Residence 4From AED 572k12% built · Planned Q4 2026
- Samana Hills South 2From AED 653k5% built · Planned Q3 2028
- Samana Hills South 3From AED 655k5% built · Planned Q3 2028
- Coventry ResidenceFrom AED 504k0% built · Planned Q4 2027
