Samana Hills South 3
Dubai Industrial CitySamana
Samana Hills South 3 is an off-plan project by Samana in Dubai Industrial City, with 147 homes on 5 floors. DLD’s last inspection, on 26 Oct 2026, found it 5% built.
- Built
- 5%
- Handover
- Q3 2028
- Sales in 12 months
- 145
- Homes
- 147
Progress
- Q3 2025Building started
- Oct 2026Last inspection · 5%
- Q3 2028Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 655k367 sq ft · 1,785 AED/sq ft · 25 sales
- 1 bed
- AED 918k587 sq ft · 1,472 AED/sq ft · 92 sales
- 2 beds
- AED 1.27M880 sq ft · 1,403 AED/sq ft · 28 sales
Against 11 Dubai Industrial City off-plan projects with 10 or more sales
- Lowest1,215AED/sq ft
- Typical1,470AED/sq ft
- Samana Hills South 31,490AED/sq ft
- Highest1,598AED/sq ft
3rd highest of 11 · AED per sq ft in 12 months
Latest sales
Plus 1 newer sale, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 19 Nov 2026 | 1 bed New | 628 | 1,463 | AED 919k |
| Oct 2026 · 3 sales | ||||
| 16 Oct 2026 | 1 bed | 787 | 1,231 | AED 969k |
| 8 Oct 2026 | 2 beds | 1,023 | 1,221 | AED 1.25M |
| 1 Oct 2026 | 2 beds | 866 | 1,385 | AED 1.2M |
| Sep 2026 · 4 sales | ||||
| 23 Sep 2026 | 1 bed | 747 | 1,383 | AED 1.03M |
| 15 Sep 2026 | 2 beds | 1,023 | 1,341 | AED 1.37M |
| 1 Sep 2026 | 2 beds | 863 | 1,389 | AED 1.2M |
| 1 Sep 2026 | 1 bed | 835 | 1,467 | AED 1.22M |
| Aug 2026 · 9 sales | ||||
| 26 Aug 2026 | 1 bed | 665 | 1,427 | AED 949k |
| 26 Aug 2026 | 1 bed | 786 | 1,233 | AED 969k |
| 25 Aug 2026 | 2 beds | 904 | 1,397 | AED 1.26M |
| 19 Aug 2026 | Studio | 367 | 1,765 | AED 648k |
| 12 Aug 2026 | 1 bed | 665 | 1,427 | AED 949k |
| 12 Aug 2026 | 2 beds | 896 | 1,322 | AED 1.18M |
| 12 Aug 2026 | 2 beds | 863 | 1,428 | AED 1.23M |
| 11 Aug 2026 | 1 bed | 628 | 981 | AED 616k |
| 4 Aug 2026 | 1 bed | 786 | 1,233 | AED 969k |
| Jul 2026 · 9 sales | ||||
| 24 Jul 2026 | 1 bed | 786 | 1,233 | AED 969k |
| 21 Jul 2026 | 1 bed | 663 | 1,431 | AED 949k |
| 21 Jul 2026 | 2 beds | 880 | 1,363 | AED 1.2M |
| 16 Jul 2026 | 1 bed | 786 | 1,233 | AED 969k |
| 16 Jul 2026 | 1 bed | 729 | 1,359 | AED 991k |
| 16 Jul 2026 | 1 bed | 786 | 1,427 | AED 1.12M |
| 3 Jul 2026 | 1 bed | 729 | 1,302 | AED 949k |
| 3 Jul 2026 | 2 beds | 1,023 | 1,400 | AED 1.43M |
| 1 Jul 2026 | 1 bed | 786 | 1,160 | AED 912k |
| Jun 2026 · 8 sales | ||||
| 25 Jun 2026 | 1 bed | 729 | 1,271 | AED 927k |
| 25 Jun 2026 | 1 bed | 747 | 1,383 | AED 1.03M |
| 24 Jun 2026 | 1 bed | 729 | 1,302 | AED 949k |
| 22 Jun 2026 | 1 bed | 729 | 1,256 | AED 916k |
| 18 Jun 2026 | 1 bed | 786 | 1,233 | AED 969k |
| 18 Jun 2026 | 1 bed | 729 | 1,302 | AED 949k |
| 17 Jun 2026 | 1 bed | 786 | 1,189 | AED 935k |
| 1 Jun 2026 | 2 beds | 880 | 1,440 | AED 1.27M |
| May 2026 · 3 sales | ||||
| 26 May 2026 | Studio | 367 | 1,322 | AED 485k |
| 20 May 2026 | 2 beds | 1,023 | 1,240 | AED 1.27M |
| 14 May 2026 | 1 bed | 628 | 1,446 | AED 908k |
| Apr 2026 · 13 sales | ||||
| 30 Apr 2026 | 1 bed | 586 | 1,534 | AED 899k |
| 28 Apr 2026 | 1 bed | 729 | 1,520 | AED 1.11M |
| 27 Apr 2026 | 1 bed | 628 | 1,510 | AED 948k |
| 24 Apr 2026 | 2 beds | 880 | 1,531 | AED 1.35M |
| 22 Apr 2026 | 2 beds | 880 | 1,432 | AED 1.26M |
| 20 Apr 2026 | 1 bed | 665 | 1,421 | AED 945k |
| 16 Apr 2026 | 1 bed | 628 | 1,481 | AED 930k |
| 16 Apr 2026 | 1 bed | 570 | 1,473 | AED 840k |
| 13 Apr 2026 | 1 bed | 665 | 1,384 | AED 920k |
| 9 Apr 2026 | Studio | 367 | 1,683 | AED 618k |
| 8 Apr 2026 | 1 bed | 663 | 1,439 | AED 954k |
| 1 Apr 2026 | 1 bed | 628 | 1,448 | AED 910k |
| 1 Apr 2026 | 2 beds | 1,023 | 1,360 | AED 1.39M |
Homes
147 homes by size
- Studio17%25 homes · 367–374 sq ft · 2 layouts
- 1 bed63%93 homes · 522–835 sq ft · 9 layouts
- 2 beds20%29 homes · 866–1,023 sq ft · 4 layouts
Location
Drive times
- Downtown Dubai44min
- Dubai Airport (DXB)52min
- Dubai Marina33min
By car. Jebel Ali Beach, the nearest beach, is 12.6 km away.
Rated schools
No rated schools within 5 km
Getting around
- Life PharmacyRed Line13 kmaway
- Al Maktoum AirportHigh-speed rail · planned13 kmaway
- Al Maktoum InternationalDWC13 kmaway
- Al YalayisEtihad Rail21 kmaway
Area guideDubai Industrial CityFinished homesAED 1,060/sq ft1-bed rentAED 50k/yrGross yieldEstimate7.7%Developer
- 6 finished
- 41 being built, on time
- 8 past their planned date
- 2 not started
- Escrow bank
- Emirates NBD Bank
- Legal name
- Samana Signature Real Estate Developments L.L.C
Also being built by Samana
| Project | Handover | Built |
|---|---|---|
| Samana MykonosDubai Studio City | Q2 2025Past planned date | 91% |
| Samana WavesJVC | Q4 2025Past planned date | 91% |
| Miami BY SDJumeirah Village Triangle | Q4 2025Past planned date | 71% |
| Samana Waves 2JVC | Q1 2026Past planned date | 52% |
| Samana Mykonos SignatureArjan | Q2 2026Past planned date | 86% |
More questions about Samana Hills South 3
From AED 655k for a 367 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 918k and 2-bed flats sell for about AED 1.27M.
Q3 2028, the planned date in DLD’s register.
It is not past its planned date. It was 5% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 22 months.
147 homes on 5 floors: 25 studios of 367–374 sq ft, 93 1-bed flats of 522–835 sq ft and 29 2-bed flats of 866–1,023 sq ft.
About AED 38k a year for a studio, AED 50k for a 1-bed and AED 70k for a 2-bed in Dubai Industrial City, a gross yield of about 7.7% Estimate.
Of Samana’s 57 projects on DLD’s record, 6 are finished. Of the 49 being built, 8 are past their planned date.
In Dubai Industrial City, 44 minutes by car to Downtown Dubai and 52 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is 13 km away.
More nearby
Off-plan nearby
- Al Haseen Residence 4From AED 572k12% built · Planned Q4 2026
- Samana Hills South 2From AED 653k5% built · Planned Q3 2028
- South Lofts by Premier ChoiceFrom AED 459k0% built · Planned Q1 2029
- Al Haseen Residence 3From AED 574k10% built · Planned Q2 2027
- Samana South HavenFrom AED 621k0% built · Planned Q4 2028
- Coventry ResidenceFrom AED 504k0% built · Planned Q4 2027
