Skip to content

Coventry Residence 3

Dubai Industrial CityGFS

FromAED 508kStudio · 394 sq ft

Coventry Residence 3 is an off-plan project by GFS in Dubai Industrial City, with 185 homes on 5 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q4 2027
Sales in 12 months
18
Homes
185

Progress

0%built
  1. Q4 2025Building started
  2. Oct 2026Last inspection · 0%
  3. Q4 2027Planned handover

Prices

Price per sq ft

1,288 AED/sq ft18 sales in 12 months

Typical price by size

Studio
AED 508k394 sq ft · 1,287 AED/sq ft · 16 sales
1 bed
Not enough sales2 sales

Against 11 Dubai Industrial City off-plan projects with 10 or more sales

  • Lowest1,215AED/sq ft
  • Coventry Residence 31,288AED/sq ft
  • Typical1,470AED/sq ft
  • Highest1,598AED/sq ft

3rd lowest of 11 · AED per sq ft in 12 months

Latest sales

Newest first
18 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 3 sales
29 Oct 2026Studio3941,234AED 486k
16 Oct 20261 bed6701,322AED 886k
14 Oct 2026Studio3941,179AED 464k
Sep 2026 · 7 sales
23 Sep 2026Studio3921,331AED 522k
22 Sep 2026Studio3941,317AED 519k
10 Sep 2026Studio3941,269AED 500k
8 Sep 2026Studio3941,307AED 515k
8 Sep 2026Studio3941,345AED 530k
4 Sep 2026Studio3941,289AED 508k
4 Sep 2026Studio3941,289AED 508k
Aug 2026 · 2 sales
26 Aug 2026Studio3941,142AED 450k
24 Aug 2026Studio3931,212AED 476k
Jun 2026 · 6 sales
22 Jun 2026Studio4291,286AED 552k
12 Jun 2026Studio3941,344AED 530k
12 Jun 2026Studio3941,355AED 534k
12 Jun 2026Studio3941,209AED 476k
12 Jun 20261 bed6751,287AED 869k
12 Jun 2026Studio3911,199AED 469k

Homes

185 homes by size

  • Studio89%165 homes · 368–438 sq ft · 8 layouts
  • 1 bed11%20 homes · 670–1,066 sq ft · 4 layouts

Location

Drive times

  • Downtown Dubai43min
  • Dubai Airport (DXB)51min
  • Dubai Marina32min

By car. Jebel Ali Beach, the nearest beach, is 12.3 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Al Maktoum AirportHigh-speed rail · planned12 kmaway
  • Al Maktoum InternationalDWC12 kmaway
  • Life PharmacyRed Line12 kmaway
  • Al YalayisEtihad Rail20 kmaway
Area guideDubai Industrial CityFinished homesAED 1,060/sq ft1-bed rentAED 50k/yrGross yieldEstimate7.7%

Developer

  • 5 being built, on time
Escrow bank
Not on record
Legal name
G F S Real Estate L.L.C

Also being built by GFS

GFS’s other projects
ProjectHandoverBuilt
Coventry GardensDubai Land Residence ComplexQ1 2027Being built1%
Coventry 66Dubai SouthQ2 2027Being built0%
Coventry ResidenceDubai Industrial CityQ4 2027Being built0%
GFS Coventry Gardens IIDubai Land Residence ComplexQ4 2027Being built1%
All 5 GFS projects
Questions

More questions about Coventry Residence 3

From AED 508k for a 394 sq ft studio, the lowest typical price paid in the 12 months.

Q4 2027, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.

185 homes on 5 floors: 165 studios of 368–438 sq ft and 20 1-bed flats of 670–1,066 sq ft.

About AED 38k a year for a studio and AED 50k for a 1-bed in Dubai Industrial City, a gross yield of about 7.7% Estimate.

Of GFS’s 5 projects on DLD’s record, 0 are finished. Of the 5 being built, none is past its planned date.

In Dubai Industrial City, 43 minutes by car to Downtown Dubai and 51 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is 12 km away.

More nearby

How the numbers work

FromAED 508kSee it on the map