Skip to content

Sahara Livings

Dubai Industrial CityKifata

Sahara Livings is an off-plan project by Kifata in Dubai Industrial City, with 84 homes on 2 floors. DLD’s last inspection, on 26 Oct 2026, found it 93% built.

Built
93%
Handover
Q2 2013
Sales in 12 months
No sales
Homes
84

Progress

93%built
  1. Q1 2009Building started
  2. Q2 2013Planned handover · passed
  3. Oct 2026Last inspection · 93%
161 months past the planned date

Location

Drive times

  • Downtown Dubai44min
  • Dubai Airport (DXB)52min
  • Dubai Marina33min

By car. Jebel Ali Beach, the nearest beach, is 11.7 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Al Maktoum AirportHigh-speed rail · planned9.3 kmaway
  • Al Maktoum InternationalDWC9.3 kmaway
  • Life PharmacyRed Line9.9 kmaway
  • Al YalayisEtihad Rail17 kmaway
Area guideDubai Industrial CityFinished homesAED 1,060/sq ft1-bed rentAED 50k/yrGross yieldEstimate7.7%

Developer

Kifata

  • 1 past their planned date
Escrow bank
Mashreq Bank
Legal name
Kifata Properties L.L.C
Questions

More questions about Sahara Livings

Q2 2013, the planned date in DLD’s register.

No. It is 13 years past its planned date, and was 93% built at DLD’s last inspection on 26 Oct 2026.

About AED 38k a year for a studio, AED 50k for a 1-bed and AED 70k for a 2-bed in Dubai Industrial City, a gross yield of about 7.7% Estimate.

Of Kifata’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, 1 is past its planned date.

In Dubai Industrial City, 44 minutes by car to Downtown Dubai and 52 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is 9.9 km away.

More nearby

How the numbers work