Skip to content

Tavora Grand by JHK

International City Phase 2 and 3JHK Heights

Tavora Grand by JHK is an off-plan project by JHK Heights in International City Phase 2 and 3, with 113 homes on 6 floors. DLD’s last inspection, on 9 Nov 2026, found it 0% built.

Built
0%
Handover
Q1 2029
Sales in 12 months
No sales
Homes
113

Progress

0%built
  1. Nov 2026Last inspection · 0%
  2. Q4 2026Building started
  3. Q1 2029Planned handover

Homes

113 homes by size

  • Studio58%66 homes · 356–505 sq ft · 10 layouts
  • 1 bed42%47 homes · 635–835 sq ft · 9 layouts

Location

Drive times

  • Downtown Dubai30min
  • Dubai Airport (DXB)25min
  • Dubai Marina39min

By car. Mercato Beach, the nearest beach, is 16.6 km away.

Rated schools

  • Repton SchoolUK/IB (Y 13) · Outstanding1.6 kmaway
  • GEMS Wellington Academy -FzeUK · Very good3.3 kmaway

Getting around

  • International City 2Blue Line · opens 202918 minwalk
  • CentrepointRed Line9.2 kmaway
  • MeydanEtihad Rail · planned9.3 kmaway
  • Al JaddafHigh-speed rail · planned11 kmaway
  • Dubai InternationalDXB12 kmaway
Area guideInternational City Phase 2 and 3Finished homesAED 1,004/sq ft1-bed rentAED 56k/yrGross yieldEstimate7.7%

Developer

  • 1 being built, on time
  • 1 not started
Escrow bank
Not on record
Legal name
Jhk Heights Real Estate Development L.L.C

Also being built by JHK Heights

JHK Heights’ other projects
ProjectHandoverBuilt
Tavora Residences BY Jhk Heights Real Estate DevelopmentInternational City Phase 2 and 3Q4 2026Being built86%
All 2 JHK Heights projects
Questions

More questions about Tavora Grand by JHK

Q1 2029, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 9 Nov 2026, with handover planned in 2 years.

113 homes on 6 floors: 66 studios of 356–505 sq ft and 47 1-bed flats of 635–835 sq ft.

About AED 40k a year for a studio and AED 56k for a 1-bed in International City Phase 2 and 3, a gross yield of about 7.7% Estimate.

Of JHK Heights’ 2 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.

In International City Phase 2 and 3, 30 minutes by car to Downtown Dubai and 25 to Dubai Airport (DXB). Centrepoint Metro station on the Red Line is 9.2 km away.

More nearby

How the numbers work