International City Phase 2 and 3
Dubaiورسان الرابعةAlso known as Warsan Fourth
International City Phase 2 and 3 has 23 finished buildings and 33 off-plan projects. Flats sold for a typical AED 1,004 per sq ft in 12 months, 26% below Dubai.
- Price per sq ft
- 1,004AED · ▲ 14.9% since Nov 2025
- 1-bed rent
- 56kAED a year
- Gross yieldEstimate
- 7.7%Flats, every size
- Buildings
- 23279 finished-home sales
- New homes due
- 3,06633 off-plan projects
About
DLD’s register lists 1,498 homes here, most of them 1-beds, then studios. Of the 11 buildings with an opening year on record, 5 opened in 2019 or later. 80% of its flat sales in 12 months were off-plan.
- Best for buying below dubai’s price
- Best for rental income
- Best for first homes
- Watch out for no metro station
Prices
Price per sq ft
Typical price by size
- Studio
- AED 480k125 sales
- 1 bed
- AED 725k131 sales
- 2 beds
- AED 1M17 sales
- 3 beds
- AED 1.65M6 sales
- 4+ beds
- Not enough sales0 sales
Against all of Dubai
- Entry level here759AED/sq ft
- International City Phase 2 and 31,004AED/sq ft
- High end here1,300AED/sq ft
- Dubai1,362AED/sq ft
11th cheapest of 60 areas · finished flats, 12 months
Against next door
- Silicon OasisAED 1,189/sq ft18% pricier
- International City Phase 1AED 658/sq ft34% cheaper
- Silicon OasisAED 60k/yr7% pricier
- International City Phase 1AED 43k/yr23% cheaper
- Silicon OasisGross6.5%1.2 points lower
- International City Phase 1Gross9.5%1.8 points higher
Rent
Rent by size
- Studio
- AED 40k/yr1,417 rents · yield 8.3%
- 1 bed
- AED 56k/yr2,313 rents · yield 7.7%
- 2 beds
- AED 72k/yr385 rents · yield 7.2%
- 3 beds
- AED 100k/yr27 rents · yield 6.1%
- 4+ beds
- AED 153k/yr9 rents
The 45th cheapest 1-bed rent of 121 areas. 4,151 new rent contracts were signed here in 12 months. Gross yields are an Estimate. Rent in every Dubai area
Buildings
Every building
16 buildings · lowest price first, those with 10 or more sales first| Building | AED/sq ft | Sales | Gross yield |
|---|---|---|---|
| Berlin Group | 778 | 14 | Not enough rents |
| Al Jawzaa | 785 | 14 | 9.8% |
| Ritz Residence | 786 | 10 | 9.1% |
| HZ Residences 5 | 882 | 16 | 9.1% |
| Modelux Tower 1 | 917 | 10 | 8.6% |
| Equiti Apartments | 920 | 11 | 7.6% |
| Glorious Central Residences | 1,283 | 18 | 8.1% |
| Aamna Residency | 811 | 5 | Not enough rents |
| Al Helal Al Zahaby 2 | 882 | 9 | 9.5% |
| Park ville 07 | 892 | 4 | 7.7% |
| BNH Smart Tower | 894 | 4 | Not enough rents |
| Al Helal Al Zahaby Building | 942 | 4 | 8.9% |
| Hz Residences 4 | 975 | 5 | 7.8% |
| Rokane G23 | 1,005 | 7 | Not enough rents |
| KHK 21 | 1,086 | 4 | Not enough rents |
| Easy 18 | 1,158 | 4 | 8.6% |
1,498 homes by size
14 buildings- Studio40%592 homes
- 1 bed47%704 homes
- 2 beds13%198 homes
- 3 beds1 home
- 4 beds3 homes
Off-plan
- Homes due
- 3,066
- Projects
- 33
- Past planned date
- 9
When the new homes are due
- 2025330homes
- 2026694homes
- 2027844homes
- 2028591homes
- 2029607homes
Past planned date
Every project
33 projects, most sold first| Project | Handover | Built | Homes | From | Sales |
|---|---|---|---|---|---|
| Zenith ResidencesAmber | Q1 2028 | 24% | 264 | AED 497kStudio | 100 |
| Chapter 01 by Newbury DevelopmentsNewbury | Q4 2028 | 2% | 126 | AED 514kStudio | 69 |
| NestANDI | Q2 2027 | 1% | 112 | AED 451kStudio | 69 |
| Equiti TowerBNH | Q3 2025Past planned date | 70% | 88 | AED 496kStudio | 67 |
| Elevia ResidencesValores | Q2 2027 | 9% | 106 | AED 550kStudio | 64 |
| Stellar Axis by Ajmal Estate DevelopersAjmal Estate | Q4 2026 | 39% | 119 | AED 532kStudio | 36 |
| Greenfield 2 by Samana DevelopersSamana | Q3 2029 | 0% | 304 | AED 946k1 bed | 33 |
| Kyomi ResidenceAnax | Q1 2028 | 0% | 120 | AED 582kStudio | 30 |
| 27 East End Garden Residences by Mirha Homes Real Estate DevelopmentMirha Homes | Q1 2027 | 40% | 96 | AED 517kStudio | 29 |
| Sports View Residence 2 by Al Helal Al ZahabyAl Helal Al Zahaby | Q1 2027 | 13% | 128 | AED 564kStudio | 26 |
| 08 Life ResidencesDeniz | Q2 2026Past planned date | 78% | 99 | AED 957k1 bed | 23 |
| Zyra Vista ResidencesLaraix | Q1 2027 | 2% | 49 | AED 515kStudio | 20 |
| Moonsa Residences 2Dugasta | Q4 2026 | 1% | 125 | AED 587kStudio | 18 |
| Zyra HillsLaraix | Q1 2028 | 0% | 81 | AED 577kStudio | 18 |
| Moonsa ResidencesDugasta | Q3 2025Past planned date | 95% | 93 | Not enough sales | 15 |
| Ventana ResidencesZedor | Q4 2027 | 7% | 124 | AED 540kStudio | 15 |
| Linden ResidencesBlackSoil | Q1 2026Past planned date | 27% | 72 | AED 490kStudio | 14 |
| Sunlight HomesSun and Sand | Q3 2027 | 22% | 30 | AED 1.3M3 beds | 13 |
| Vio ResidencesModelux | Q4 2026 | 6% | 87 | AED 525kStudio | 13 |
| Park ResidencyPark Group | Q3 2029 | 0% | 98 | AED 562kStudio | 8 |
| Tavora Residences by Jhk Heights Real Estate DevelopmentJHK Heights | Q4 2026 | 86% | 95 | AED 561kStudio | 8 |
| The Maiden ResidenceTulip Althahabi | Q4 2025Past planned date | 73% | 71 | AED 456kStudio | 7 |
| Mayflower ResidencesAJ Gargash | Q1 2026Past planned date | 96% | 97 | AED 720k1 bed | 5 |
| Al Aiham HomesDar Al Aiham | Q2 2028 | 0% | – | No sales | No sales |
| D2Injaz Almadina | Q2 2025Past planned date | 75% | – | No sales | No sales |
| Easel TowerNewbury | Q3 2027 | 0% | 94 | No sales | No sales |
| Elevia Residences IIValores | Q1 2028 | 0% | – | No sales | No sales |
| Elevia Residences IIIValores | Q3 2027 | 0% | 105 | No sales | No sales |
| Kiwi Yard ResidencesInjaz Almadina | Q1 2025Past planned date | 55% | 78 | No sales | No sales |
| Lenjawi DiamondLenjawi | Q3 2029 | 0% | 92 | No sales | No sales |
| Lucent Rise ResidencesNova Square Real Estate L.l.CS.o.c | Q4 2026 | – | – | No sales | No sales |
| Orbit Residences by Jewel 2Jewel Development | Q4 2025Past planned date | 80% | – | No sales | No sales |
| Tavora Grand by JHKJHK Heights | Q1 2029 | 0% | 113 | No sales | No sales |
Location
Drive times
- Downtown Dubai30min
- Dubai Airport (DXB)25min
- Dubai Marina39min
By car. Mercato Beach, the nearest beach, is 16.9 km away.
Rated schools
- Repton SchoolUK/IB (Y 13) · Outstanding2.0 kmaway
- GEMS Wellington Academy -FzeUK · Very good3.4 kmaway
Getting around
- International City 2Blue Line · opens 202916 minwalk
- CentrepointRed Line9.2 kmaway
- MeydanEtihad Rail · planned9.7 kmaway
- Al JaddafHigh-speed rail · planned11 kmaway
- Dubai InternationalDXB12 kmaway
More questions about International City Phase 2 and 3
About AED 40k a year for a studio, AED 56k for a 1-bed and AED 72k for a 2-bed. The 45th cheapest 1-bed rent of 121 areas. 4,151 new rent contracts were signed here in 12 months.
A studio sells for about AED 480k, a 1-bed sells for about AED 725k and a 2-bed sells for about AED 1M, the typical price paid in 12 months.
Up 14.9% per sq ft since Nov 2025, for finished flats.
About 7.7% gross Estimate. Studios earn the most, 8.3% gross. 80% of flat sales here are off-plan.
No. International City 2 station on the Blue Line is planned to open in Sep 2029.
2 rated schools within 5 km of its middle. The nearest, Repton School, is rated Outstanding.
3,066 homes in 33 off-plan projects, 9 projects past their planned date.
DLD and Dubai Municipality call it Warsan Fourth (ورسان الرابعة). Title deeds and rent contracts use that name.
More nearby
Next-door areas
Most searched projects
Developer's pictureMoonsa Residences95% built · Past planned date
Developer's pictureMayflower ResidencesFrom AED 720k96% built · Past planned date- 08 Life ResidencesFrom AED 957k78% built · Past planned date
Developer's pictureChapter 01 by Newbury DevelopmentsFrom AED 514k2% built · Planned Q4 2028
Developer's pictureLinden ResidencesFrom AED 490k27% built · Past planned date- Equiti TowerFrom AED 496k70% built · Past planned date
Developer's pictureSunlight HomesFrom AED 1.3M22% built · Planned Q3 2027
Developer's pictureVio ResidencesFrom AED 525k6% built · Planned Q4 2026