Zyra Hills
International City Phase 2 and 3Laraix
Zyra Hills is an off-plan project by Laraix in International City Phase 2 and 3, with 81 homes on 7 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q1 2028
- Sales in 12 months
- 18
- Homes
- 81
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 0%
- Q1 2028Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 577k407 sq ft · 1,410 AED/sq ft · 12 sales
- 1 bed
- AED 877k737 sq ft · 1,216 AED/sq ft · 5 sales
- 2 beds
- Not enough sales1 sale
Against 20 International City Phase 2 and 3 off-plan projects with 10 or more sales
- Lowest1,017AED/sq ft
- Typical1,169AED/sq ft
- Zyra Hills1,374AED/sq ft
- Highest1,501AED/sq ft
4th highest of 20 · AED per sq ft in 12 months
Latest sales
Plus 1 newer sale, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 5 Nov 2026 | Studio New | 404 | 1,462 | AED 591k |
| Sep 2026 · 4 sales | ||||
| 29 Sep 2026 | 1 bed | 643 | 1,277 | AED 821k |
| 28 Sep 2026 | Studio | 403 | 1,382 | AED 557k |
| 23 Sep 2026 | Studio | 401 | 1,450 | AED 582k |
| 14 Sep 2026 | 1 bed | 824 | 1,126 | AED 928k |
| Jul 2026 · 1 sale | ||||
| 20 Jul 2026 | Studio | 401 | 1,455 | AED 584k |
| May 2026 · 4 sales | ||||
| 18 May 2026 | Studio | 410 | 1,529 | AED 627k |
| 18 May 2026 | Studio | 376 | 1,424 | AED 536k |
| 18 May 2026 | 2 beds | 920 | 1,493 | AED 1.37M |
| 18 May 2026 | Studio | 432 | 1,345 | AED 581k |
| Mar 2026 · 5 sales | ||||
| 27 Mar 2026 | Studio | 441 | 1,701 | AED 750k |
| 27 Mar 2026 | 1 bed | 737 | 1,189 | AED 877k |
| 27 Mar 2026 | Studio | 404 | 1,345 | AED 543k |
| 16 Mar 2026 | 1 bed | 737 | 1,234 | AED 910k |
| 6 Mar 2026 | Studio | 403 | 1,421 | AED 573k |
| Feb 2026 · 4 sales | ||||
| 18 Feb 2026 | Studio | 409 | 1,400 | AED 573k |
| 18 Feb 2026 | Studio | 432 | 1,348 | AED 583k |
| 18 Feb 2026 | Studio | 409 | 1,366 | AED 559k |
| 18 Feb 2026 | 1 bed | 643 | 1,216 | AED 782k |
Homes
81 homes by size
- Studio48%39 homes · 376–441 sq ft · 5 layouts
- 1 bed17%14 homes · 613–894 sq ft · 6 layouts
- 2 beds31%25 homes · 920–1,515 sq ft · 9 layouts
- 3 beds4%3 homes · 1,758–2,125 sq ft · 3 layouts
Location
Drive times
- Downtown Dubai29min
- Dubai Airport (DXB)25min
- Dubai Marina39min
By car. Mercato Beach, the nearest beach, is 16.3 km away.
Rated schools
- Repton SchoolUK/IB (Y 13) · Outstanding1.4 kmaway
- GEMS Wellington Academy -FzeUK · Very good3.5 kmaway
Getting around
- International City 2Blue Line · opens 202923 minwalk
- CentrepointRed Line9.0 kmaway
- MeydanEtihad Rail · planned9.0 kmaway
- Al JaddafHigh-speed rail · planned10 kmaway
- Dubai InternationalDXB12 kmaway
Developer
- 2 being built, on time
- Escrow bank
- Not on record
- Legal name
- Laraix Developers L.L.C
Also being built by Laraix
| Project | Handover | Built |
|---|---|---|
| Zyra Vista ResidencesInternational City Phase 2 and 3 | Q1 2027Being built | 2% |
More questions about Zyra Hills
From AED 577k for a 407 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 877k.
Q1 2028, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 16 months.
81 homes on 7 floors: 39 studios of 376–441 sq ft, 14 1-bed flats of 613–894 sq ft, 25 2-bed flats of 920–1,515 sq ft and 3 3-bed flats of 1,758–2,125 sq ft.
About AED 40k a year for a studio, AED 56k for a 1-bed, AED 72k for a 2-bed and AED 100k for a 3-bed in International City Phase 2 and 3, a gross yield of about 7.7% Estimate.
Of Laraix’s 2 projects on DLD’s record, 0 are finished. Of the 2 being built, none is past its planned date.
In International City Phase 2 and 3, 29 minutes by car to Downtown Dubai and 25 to Dubai Airport (DXB). Centrepoint Metro station on the Red Line is 9.0 km away.
More nearby
Off-plan nearby
- Vio ResidencesFrom AED 525k6% built · Planned Q4 2026
- Elevia Residences IIINo sales0% built · Planned Q3 2027
- Tavora Grand by JHKNo sales0% built · Planned Q1 2029
- Lenjawi DiamondNo sales0% built · Planned Q3 2029
- Ventana ResidencesFrom AED 540k7% built · Planned Q4 2027
- Zyra Vista ResidencesFrom AED 515k2% built · Planned Q1 2027
Finished buildings nearby
Typical next door AED 930/sq ft · 8 buildings within a 10-minute walk
- Modelux Tower 1917AED/sq ftNot enough rents · 10-minute walk
- Easy 181,158AED/sq ft1-bed rent AED 51k/yr · 10-minute walk
- Al Helal Al Zahaby 2882AED/sq ft1-bed rent AED 52k/yr · 10-minute walk
- HZ Residences 5882AED/sq ft1-bed rent AED 61k/yr · 10-minute walk
- BNH Smart Tower894AED/sq ftNot enough rents · 10-minute walk
- Al Helal Al Zahaby Building942AED/sq ftNot enough rents · 10-minute walk
- KHK 211,086AED/sq ftNot enough rents · 10-minute walk
- Glorious Central Residences1,283AED/sq ft1-bed rent AED 65k/yr · 10-minute walk
- Al Jawzaa785AED/sq ft1-bed rent AED 55k/yr
- Berlin Group778AED/sq ftNot enough rents
- Equiti Apartments920AED/sq ft1-bed rent AED 53k/yr
- Ritz Residence786AED/sq ft1-bed rent AED 52k/yr