Skip to content

Zyra Vista Residences

International City Phase 2 and 3Laraix

FromAED 515kStudio · 368 sq ft

Zyra Vista Residences is an off-plan project by Laraix in International City Phase 2 and 3, with 49 homes on 6 floors. DLD’s last inspection, on 26 Oct 2026, found it 2% built.

Built
2%
Handover
Q1 2027
Sales in 12 months
20
Homes
49

Progress

2%built
  1. Q2 2025Building started
  2. Aug–Oct 2025Launch sales · 3
  3. Oct 2026Last inspection · 2%
  4. Q1 2027Planned handover

Prices

Price per sq ft

1,180 AED/sq ft20 sales in 12 months

Typical price by size

Studio
AED 515k368 sq ft · 1,400 AED/sq ft · 3 sales
1 bed
AED 898k751 sq ft · 1,183 AED/sq ft · 12 sales
2 beds
AED 1.2M1,282 sq ft · 927 AED/sq ft · 5 sales

Against 20 International City Phase 2 and 3 off-plan projects with 10 or more sales

  • Lowest1,017AED/sq ft
  • Typical1,169AED/sq ft
  • Zyra Vista Residences1,180AED/sq ft
  • Highest1,501AED/sq ft

10th highest of 20 · AED per sq ft in 12 months

Latest sales

Plus 2 newer sales, newest first
20 off-plan sales · Nov 2025 – Oct 2026, plus 2 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
18 Nov 20261 bed New7321,175AED 860k
13 Nov 20261 bed New7331,191AED 873k
Oct 2026 · 1 sale
14 Oct 20261 bed7511,195AED 898k
Jul 2026 · 1 sale
20 Jul 20261 bed7611,178AED 897k
Feb 2026 · 3 sales
9 Feb 20262 beds1,282927AED 1.19M
9 Feb 20262 beds1,442885AED 1.28M
6 Feb 2026Studio3681,248AED 459k
Jan 2026 · 2 sales
26 Jan 2026Studio3681,400AED 515k
22 Jan 20261 bed7511,180AED 886k
Dec 2025 · 1 sale
22 Dec 20252 beds1,442890AED 1.28M
Nov 2025 · 12 sales
20 Nov 2025Studio3681,450AED 533k
14 Nov 20251 bed8711,116AED 972k
14 Nov 20251 bed7511,210AED 909k
14 Nov 20251 bed7331,226AED 898k
14 Nov 20251 bed7331,159AED 849k
10 Nov 20251 bed7611,180AED 898k
10 Nov 20251 bed7331,226AED 898k
10 Nov 20251 bed7511,161AED 872k
10 Nov 20252 beds1,282935AED 1.2M
10 Nov 20251 bed8121,185AED 962k
10 Nov 20251 bed7321,225AED 897k
7 Nov 20252 beds1,282935AED 1.2M

Homes

49 homes by size

  • Studio10%5 homes · 368 sq ft · 1 layout
  • 1 bed71%35 homes · 732–1,127 sq ft · 9 layouts
  • 2 beds18%9 homes · 1,282–1,440 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai30min
  • Dubai Airport (DXB)26min
  • Dubai Marina39min

By car. Mercato Beach, the nearest beach, is 16.0 km away.

Rated schools

  • Repton SchoolUK/IB (Y 13) · Outstanding1.0 kmaway
  • GEMS Wellington Academy -FzeUK · Very good3.2 kmaway

Getting around

  • International City 2Blue Line · opens 202924 minwalk
  • MeydanEtihad Rail · planned8.7 kmaway
  • CentrepointRed Line9.3 kmaway
  • Al JaddafHigh-speed rail · planned10 kmaway
  • Dubai InternationalDXB12 kmaway
Area guideInternational City Phase 2 and 3Finished homesAED 1,004/sq ft1-bed rentAED 56k/yrGross yieldEstimate7.7%

Developer

  • 2 being built, on time
Escrow bank
United Bank Limited
Legal name
Laraix Developers L.L.C

Also being built by Laraix

Laraix’s other projects
ProjectHandoverBuilt
ZYRA HILLSInternational City Phase 2 and 3Q1 2028Being built0%
All 2 Laraix projects
Questions

More questions about Zyra Vista Residences

From AED 515k for a 368 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 898k and 2-bed flats sell for about AED 1.2M.

Q1 2027, the planned date in DLD’s register.

It is not past its planned date. It was 2% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 months.

49 homes on 6 floors: 5 studios of 368 sq ft, 35 1-bed flats of 732–1,127 sq ft and 9 2-bed flats of 1,282–1,440 sq ft.

About AED 40k a year for a studio, AED 56k for a 1-bed and AED 72k for a 2-bed in International City Phase 2 and 3, a gross yield of about 7.7% Estimate.

Of Laraix’s 2 projects on DLD’s record, 0 are finished. Of the 2 being built, none is past its planned date.

In International City Phase 2 and 3, 30 minutes by car to Downtown Dubai and 26 to Dubai Airport (DXB). Centrepoint Metro station on the Red Line is 9.3 km away.

More nearby

How the numbers work

FromAED 515kSee it on the map