Elara is an off-plan project by Meraas in Umm Suqeim 3, with 237 homes on 10 floors. DLD’s last inspection, on 29 Oct 2026, found it 78% built.
- Built
- 78%
- Handover
- Q4 2026
- Since launch
- Up 5%1 bed price per sq ft
- Homes
- 237
Progress
- Q4 2023Building started
- Dec 2023 – Feb 2024Launch sales · 220
- Oct 2026Last inspection · 78%
- Q4 2026Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 2.53M721 sq ft · 3 sales
- 2 beds
- AED 3.73M1,497 sq ft · 4 sales
Latest sales
Plus 1 newer sale, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 2 Nov 2026 | 2 beds New | 1,582 | 2,212 | AED 3.5M |
| Oct 2026 · 1 sale | ||||
| 27 Oct 2026 | 2 beds | 1,574 | 2,414 | AED 3.8M |
| May 2026 · 1 sale | ||||
| 11 May 2026 | 2 beds | 1,248 | 2,874 | AED 3.59M |
| Jan 2026 · 2 sales | ||||
| 22 Jan 2026 | 1 bed | 721 | 3,513 | AED 2.53M |
| 9 Jan 2026 | 2 beds | 1,780 | 2,051 | AED 3.65M |
| Dec 2025 · 1 sale | ||||
| 25 Dec 2025 | 2 beds | 1,420 | 2,852 | AED 4.05M |
| Nov 2025 · 2 sales | ||||
| 21 Nov 2025 | 1 bed | 963 | 2,570 | AED 2.48M |
| 10 Nov 2025 | 1 bed | 721 | 3,718 | AED 2.68M |
Homes
237 homes by size
- 1 bed45%106 homes · 721–1,350 sq ft · 9 layouts
- 2 beds44%105 homes · 1,248–1,779 sq ft · 6 layouts
- 3 beds10%23 homes · 1,927–2,348 sq ft · 2 layouts
- 4 beds1%3 homes · 3,692–4,533 sq ft · 3 layouts
Location
Drive times
- Downtown Dubai21min
- Dubai Airport (DXB)34min
- Dubai Marina20min
By car. Jumeirah Public Beach, the nearest beach, is 1.9 km away.
Rated schools
- Kings School DubaiUK · Outstanding0.5 kmaway
- Raffles World AcademyInternational Baccalaureate · Very good1.0 kmaway
Getting around
- Mall of the EmiratesRed Line20 minwalk
- MeydanEtihad Rail · planned11 kmaway
- Al JaddafHigh-speed rail · planned17 kmaway
- Dubai InternationalDXB22 kmaway
Developer
- 29 finished
- 34 being built, on time
- 2 past their planned date
- 1 not started
- Escrow bank
- First Abu Dhabi Bank
- Legal name
- Jumeirah Hills Development L.L.C
Also being built by Meraas
| Project | Handover | Built |
|---|---|---|
| Nad Al Sheba Gardens Phase 3Meydan | Q2 2026Past planned date | 97% |
| Central Park PlazaAl Wasl | Q4 2026Past planned date | 44% |
| Design QuarterZaa'Beel Second | Q1 2027Being built | 41% |
| Bluewaters BayDubai Marina | Q1 2027Being built | 37% |
| Bulgari Lighthouse DubaiJumeirah Bay Island | Q1 2027Being built | 80% |
More questions about Elara
From AED 2.53M for a 721 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 3.73M.
Q4 2026, the planned date in DLD’s register.
It is not past its planned date. It was 78% built at DLD’s last inspection on 29 Oct 2026, with handover planned in 1 month.
237 homes on 10 floors: 106 1-bed flats of 721–1,350 sq ft, 105 2-bed flats of 1,248–1,779 sq ft, 23 3-bed flats of 1,927–2,348 sq ft and 3 4+ bed flats of 3,692–4,533 sq ft.
Up 5% for 1-bed flats, per sq ft. Against the launch sales of Dec 2023 – Feb 2024: 2-bed flats up 10%.
About AED 115k a year for a 1-bed, AED 190k for a 2-bed, AED 275k for a 3-bed and AED 400k for a 4+ bed in Umm Suqeim 3, a gross yield of about 5.2% Estimate.
Of Meraas’ 66 projects on DLD’s record, 29 are finished. Of the 36 being built, 2 are past their planned date.
In Umm Suqeim 3, 21 minutes by car to Downtown Dubai and 34 to Dubai Airport (DXB). Mall of the Emirates Metro station on the Red Line is a 20-minute walk.
More nearby
Off-plan nearby
Finished buildings nearby
Typical next door AED 2,871/sq ft · 2 buildings within a 10-minute walk