Skip to content

Bluewaters Bay

Dubai MarinaMeraas

FromAED 3.18M1 bed · 800 sq ft

Bluewaters Bay is an off-plan project by Meraas in Dubai Marina, with 678 homes on 50 floors. DLD’s last inspection, on 26 Oct 2026, found it 37% built.

Built
37%
Handover
Q1 2027
Since launch
Up 4%1 bed price per sq ft
Homes
678

About

Home types

  • 1 bed
  • 2 beds
  • 3 beds

Progress

37%built
  1. Jan–Mar 2023Launch sales · 39
  2. Q1 2023Building started
  3. Oct 2026Last inspection · 37%
  4. Q1 2027Planned handover
  5. Jul 2027Developer’s date

Prices

Price per sq ft

3,738 AED/sq ft32 sales in 12 months

Typical price by size

1 bed
AED 3.18M800 sq ft · 3,734 AED/sq ft · 14 sales
2 beds
AED 5.51M1,257 sq ft · 3,656 AED/sq ft · 11 sales
3 beds
AED 7.8M2,055 sq ft · 3,785 AED/sq ft · 5 sales
4 beds
Not enough sales2 sales

Against 22 Dubai Marina off-plan projects with 10 or more sales

  • Lowest2,217AED/sq ft
  • Bluewaters Bay3,738AED/sq ft
  • Typical3,822AED/sq ft
  • Highest5,087AED/sq ft

11th lowest of 22 · AED per sq ft in 12 months

Latest sales

Plus 1 newer sale, newest first
32 off-plan sales · Nov 2025 – Oct 2026, plus 1 newer sale · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
2 Nov 20262 beds New9853,553AED 3.5M
Oct 2026 · 3 sales
29 Oct 20263 beds2,0573,836AED 7.89M
29 Oct 20261 bed7994,056AED 3.24M
21 Oct 20262 beds1,6823,637AED 6.12M
Aug 2026 · 3 sales
31 Aug 20262 beds9874,002AED 3.95M
17 Aug 20262 beds1,6813,277AED 5.51M
10 Aug 20262 beds1,6813,394AED 5.71M
Jul 2026 · 2 sales
30 Jul 20262 beds1,2544,146AED 5.2M
9 Jul 20261 bed8063,433AED 2.77M
Jun 2026 · 2 sales
23 Jun 20261 bed7993,553AED 2.84M
3 Jun 20261 bed7974,159AED 3.32M
May 2026 · 1 sale
14 May 20262 beds9853,655AED 3.6M
Mar 2026 · 2 sales
31 Mar 20262 beds1,2574,455AED 5.6M
2 Mar 20263 beds2,0414,189AED 8.55M
Feb 2026 · 6 sales
17 Feb 20263 beds2,0613,785AED 7.8M
17 Feb 20261 bed8023,990AED 3.2M
13 Feb 20262 beds9853,722AED 3.67M
9 Feb 20261 bed8013,462AED 2.77M
9 Feb 20264+ beds3,0505,156AED 15.73M
3 Feb 20262 beds1,2574,415AED 5.55M
Jan 2026 · 4 sales
27 Jan 20264+ beds3,0505,410AED 16.5M
19 Jan 20263 beds2,0453,267AED 6.68M
14 Jan 20261 bed7993,957AED 3.16M
5 Jan 20261 bed9223,755AED 3.46M
Dec 2025 · 4 sales
17 Dec 20251 bed7993,528AED 2.82M
9 Dec 20251 bed7993,521AED 2.81M
8 Dec 20253 beds2,0553,377AED 6.94M
3 Dec 20251 bed9223,711AED 3.42M
Nov 2025 · 5 sales
27 Nov 20251 bed9253,971AED 3.67M
27 Nov 20251 bed7993,620AED 2.89M
26 Nov 20252 beds1,6813,450AED 5.8M
19 Nov 20252 beds9873,528AED 3.48M
19 Nov 20251 bed8044,042AED 3.25M

Homes

678 homes by size

  • 1 bed39%264 homes · 799–1,261 sq ft · 8 layouts
  • 2 beds35%239 homes · 987–1,955 sq ft · 9 layouts
  • 3 beds22%152 homes · 2,043–2,340 sq ft · 3 layouts
  • 4 beds3%20 homes · 2,899–3,050 sq ft · 2 layouts
  • 5 beds3 homes · 6,930 sq ft · 1 layout

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 3.18M

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)39min

By car. JBR Beach, the nearest beach, is 1.2 km away.

Rated schools

  • EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good3.4 kmaway
  • The Winchester School - DUBAIUK · Very good3.6 kmaway

Getting around

  • Jumeirah Beach Residence 2Dubai Tram14 minwalk
  • DMCCRed Line24 minwalk
  • Al YalayisEtihad Rail7.6 kmaway
  • Al Maktoum AirportHigh-speed rail · planned20 kmaway
  • Al Maktoum InternationalDWC20 kmaway
Area guideDubai MarinaFinished homesAED 1,989/sq ft1-bed rentAED 95k/yrGross yieldEstimate5.6%

Developer

  • 29 finished
  • 34 being built, on time
  • 2 past their planned date
  • 1 not started
Escrow bank
Abu Dhabi Commercial Bank
Legal name
Dhre 2 Bts L.L.C

Also being built by Meraas

Meraas’ other projects
ProjectHandoverBuilt
Nad Al Sheba Gardens Phase 3MeydanQ2 2026Past planned date97%
Central Park PlazaAl WaslQ4 2026Past planned date44%
ElaraUmm Suqeim 3Q4 2026Being built78%
Design QuarterZaa'Beel SecondQ1 2027Being built41%
Bulgari Lighthouse DubaiJumeirah Bay IslandQ1 2027Being built80%
All 66 Meraas projects
Questions

More questions about Bluewaters Bay

From AED 3.18M for a 800 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 5.51M and 3-bed flats sell for about AED 7.8M.

Q1 2027, the planned date in DLD’s register.

It is not past its planned date. It was 37% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 months.

678 homes on 50 floors: 264 1-bed flats of 799–1,261 sq ft, 239 2-bed flats of 987–1,955 sq ft, 152 3-bed flats of 2,043–2,340 sq ft, 20 4+ bed flats of 2,899–3,050 sq ft and 3 4+ bed flats of 6,930 sq ft.

Up 4% for 1-bed flats, per sq ft.

About AED 95k a year for a 1-bed, AED 145k for a 2-bed, AED 215k for a 3-bed and AED 300k for a 4+ bed in Dubai Marina, a gross yield of about 5.6% Estimate.

Of Meraas’ 66 projects on DLD’s record, 29 are finished. Of the 36 being built, 2 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 3.18M.

In Dubai Marina, 26 minutes by car to Downtown Dubai and 39 to Dubai Airport (DXB). DMCC Metro station on the Red Line is a 24-minute walk.

More nearby

How the numbers work

FromAED 3.18MSee it on the map