
Design Quarter
Dubai Design DistrictMeraas
Design Quarter is an off-plan project by Meraas in Dubai Design District, with 558 homes on 40 floors. DLD’s last inspection, on 26 Oct 2026, found it 41% built.
- Built
- 41%
- Handover
- Q1 2027
- Since launch
- No change1 bed price per sq ft
- Homes
- 558
Progress
- May–Jul 2023Launch sales · 209
- Q2 2023Building started
- Oct 2026Last inspection · 41%
- Q1 2027Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 1.99M823 sq ft · 8 sales
- 2 beds
- AED 3.18M1,185 sq ft · 7 sales
- 3 beds
- AED 7.6M3,042 sq ft · 4 sales
Against 6 Zaa'Beel Second off-plan projects with 10 or more sales
- Design Quarter2,552AED/sq ft
- Typical3,163AED/sq ft
- Highest3,750AED/sq ft
Lowest of 6 · AED per sq ft in 12 months
Latest sales
Plus 2 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 6 Nov 2026 | 2 beds New | 1,265 | 2,126 | AED 2.69M |
| 5 Nov 2026 | 2 beds New | 1,258 | 2,552 | AED 3.21M |
| Oct 2026 · 2 sales | ||||
| 15 Oct 2026 | 1 bed | 823 | 2,430 | AED 2M |
| 13 Oct 2026 | 2 beds | 1,168 | 2,816 | AED 3.29M |
| Sep 2026 · 2 sales | ||||
| 24 Sep 2026 | 2 beds | 1,258 | 2,146 | AED 2.7M |
| 23 Sep 2026 | 3 beds | 2,951 | 1,813 | AED 5.35M |
| Aug 2026 · 2 sales | ||||
| 4 Aug 2026 | 1 bed | 843 | 2,355 | AED 1.99M |
| 4 Aug 2026 | 3 beds | 3,132 | 2,785 | AED 8.72M |
| Jul 2026 · 2 sales | ||||
| 29 Jul 2026 | 2 beds | 1,185 | 2,684 | AED 3.18M |
| 1 Jul 2026 | 1 bed | 859 | 2,355 | AED 2.02M |
| May 2026 · 1 sale | ||||
| 14 May 2026 | 3 beds | 2,019 | 3,305 | AED 6.67M |
| Mar 2026 · 2 sales | ||||
| 31 Mar 2026 | 3 beds | 3,305 | 2,583 | AED 8.54M |
| 16 Mar 2026 | 1 bed | 823 | 2,236 | AED 1.84M |
| Feb 2026 · 2 sales | ||||
| 12 Feb 2026 | 2 beds | 1,168 | 2,652 | AED 3.1M |
| 2 Feb 2026 | 1 bed | 843 | 2,544 | AED 2.15M |
| Jan 2026 · 1 sale | ||||
| 27 Jan 2026 | 2 beds | 1,185 | 2,608 | AED 3.09M |
| Dec 2025 · 3 sales | ||||
| 29 Dec 2025 | 1 bed | 797 | 2,415 | AED 1.93M |
| 29 Dec 2025 | 1 bed | 799 | 2,407 | AED 1.92M |
| 11 Dec 2025 | 2 beds | 1,258 | 2,631 | AED 3.31M |
| Nov 2025 · 2 sales | ||||
| 24 Nov 2025 | 2 beds | 1,185 | 2,870 | AED 3.4M |
| 11 Nov 2025 | 1 bed | 823 | 2,552 | AED 2.1M |
Homes
558 homes by size
- 1 bed47%262 homes · 796–1,498 sq ft · 12 layouts
- 2 beds37%208 homes · 1,167–2,508 sq ft · 5 layouts
- 3 beds16%88 homes · 1,547–3,305 sq ft · 8 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 2MLocation
Drive times
- Downtown Dubai12min
- Dubai Airport (DXB)24min
- Dubai Marina26min
By car. Mercato Beach, the nearest beach, is 5.8 km away.
Rated schools
- Hartland International School - FZUK · Very good1.1 kmaway
- JSS Private SchoolIndian · Very good4.5 kmaway
Getting around
- District One NorthGold Line · opens 203228 minwalk
- Burj Khalifa / Dubai MallRed Line3.2 kmaway
- MeydanEtihad Rail · planned3.2 kmaway
- Al JaddafHigh-speed rail · planned5.8 kmaway
- Dubai InternationalDXB10 kmaway
Area guideZaa'Beel SecondFinished homesAED 2,685/sq ft1-bed rentAED 110k/yrGross yieldEstimate5.3%Developer
- 29 finished
- 34 being built, on time
- 2 past their planned date
- 1 not started
- Escrow bank
- Emirates NBD Bank
- Legal name
- Dhre 2 Bts L.L.C
Also being built by Meraas
| Project | Handover | Built |
|---|---|---|
| Nad Al Sheba Gardens Phase 3Meydan | Q2 2026Past planned date | 97% |
| Central Park PlazaAl Wasl | Q4 2026Past planned date | 44% |
| ElaraUmm Suqeim 3 | Q4 2026Being built | 78% |
| Bluewaters BayDubai Marina | Q1 2027Being built | 37% |
| Bulgari Lighthouse DubaiJumeirah Bay Island | Q1 2027Being built | 80% |
More questions about Design Quarter
From AED 1.99M for a 823 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 3.18M and 3-bed flats sell for about AED 7.6M.
Q1 2027, the planned date in DLD’s register.
It is not past its planned date. It was 41% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 months.
558 homes on 40 floors: 262 1-bed flats of 796–1,498 sq ft, 208 2-bed flats of 1,167–2,508 sq ft and 88 3-bed flats of 1,547–3,305 sq ft.
0% for 1-bed flats, per sq ft. Against the launch sales of May 2023 – Jul 2023: 2-bed flats up 4%, 3-bed flats up 1%.
About AED 110k a year for a 1-bed, AED 165k for a 2-bed and AED 245k for a 3-bed in Zaa'Beel Second, a gross yield of about 5.3% Estimate.
Of Meraas’ 66 projects on DLD’s record, 29 are finished. Of the 36 being built, 2 are past their planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2M.
In Dubai Design District, Zaa'Beel Second, 12 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Burj Khalifa / Dubai Mall Metro station on the Red Line is 3.2 km away.
More nearby
Off-plan nearby
Finished buildings nearby
Typical next door AED 1,766/sq ft · 5 buildings within a 10-minute walk
- Century1,829AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- Regalia1,766AED/sq ft1-bed rent AED 86k/yr · 10-minute walk
- SLS Dubai1,997AED/sq ft1-bed rent AED 150k/yr · 10-minute walk
- DAMAC Towers by Paramount1,412AED/sq ft1-bed rent AED 95k/yr · 10-minute walk
- Nobles1,681AED/sq ft1-bed rent AED 103k/yr · 10-minute walk
- Downtown Views II2,715AED/sq ft1-bed rent AED 110k/yr
- Downtown Views2,668AED/sq ft1-bed rent AED 115k/yr