Atelis at d3
Dubai Design DistrictMeraas
Atelis at d3 is an off-plan project by Meraas in Dubai Design District, with 280 homes on 43 floors. DLD’s last inspection, on 26 Oct 2026, found it 1% built.
- Built
- 1%
- Handover
- Q3 2029
- Since launch
- Down 1%1 bed price per sq ft
- Homes
- 280
Progress
- Jul–Sep 2025Launch sales · 252
- Q3 2025Building started
- Oct 2026Last inspection · 1%
- Q3 2029Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 2.47M937 sq ft · 2,465 AED/sq ft · 3 sales
- 2 beds
- Not enough sales2 sales
- 3 beds
- Not enough sales2 sales
- 4 beds
- Not enough sales1 sale
- 5 beds
- Not enough sales2 sales
Against 6 Zaa'Beel Second off-plan projects with 10 or more sales
- Lowest2,552AED/sq ft
- Atelis at d33,118AED/sq ft
- Typical3,163AED/sq ft
- Highest3,750AED/sq ft
2nd lowest of 6 · AED per sq ft in 12 months
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Sep 2026 · 1 sale | ||||
| 25 Sep 2026 | 1 bed | 937 | 2,637 | AED 2.47M |
| Apr 2026 · 2 sales | ||||
| 2 Apr 2026 | 4+ beds | 2,860 | 3,562 | AED 10.19M |
| 2 Apr 2026 | 3 beds | 2,561 | 3,292 | AED 8.43M |
| Mar 2026 · 1 sale | ||||
| 5 Mar 2026 | 4+ beds | 7,278 | 3,427 | AED 24.95M |
| Nov 2025 · 6 sales | ||||
| 27 Nov 2025 | 2 beds | 1,480 | 2,945 | AED 4.36M |
| 27 Nov 2025 | 3 beds | 2,268 | 3,412 | AED 7.74M |
| 4 Nov 2025 | 2 beds | 1,458 | 2,576 | AED 3.76M |
| 4 Nov 2025 | 4+ beds | 6,253 | 3,453 | AED 21.59M |
| 4 Nov 2025 | 1 bed | 1,049 | 2,465 | AED 2.59M |
| 4 Nov 2025 | 1 bed | 921 | 2,402 | AED 2.21M |
Homes
280 homes by size
- 1 bed50%141 homes · 749–1,139 sq ft · 18 layouts
- 2 beds36%102 homes · 1,341–2,033 sq ft · 13 layouts
- 3 beds7%20 homes · 2,125–2,592 sq ft · 7 layouts
- 4 beds5%15 homes · 2,860–6,503 sq ft · 8 layouts
- 5 beds1%2 homes · 6,253–7,278 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai8min
- Dubai Airport (DXB)22min
- Dubai Marina24min
By car. Mercato Beach, the nearest beach, is 5.9 km away.
Rated schools
- Hartland International School - FZUK · Very good1.3 kmaway
- JSS Private SchoolIndian · Very good4.8 kmaway
Getting around
- District One NorthGold Line · opens 20322.3 kmaway
- Burj Khalifa / Dubai MallRed Line3.3 kmaway
- MeydanEtihad Rail · planned3.6 kmaway
- Al JaddafHigh-speed rail · planned5.2 kmaway
- Dubai InternationalDXB9.5 kmaway
Area guideZaa'Beel SecondFinished homesAED 2,685/sq ft1-bed rentAED 110k/yrGross yieldEstimate5.3%Developer
- 29 finished
- 34 being built, on time
- 2 past their planned date
- 1 not started
- Escrow bank
- National Bank of Ras Al Khaimah
- Legal name
- Dhre 2 Bts L.L.C
Also being built by Meraas
| Project | Handover | Built |
|---|---|---|
| Nad Al Sheba Gardens Phase 3Meydan | Q2 2026Past planned date | 97% |
| Central Park PlazaAl Wasl | Q4 2026Past planned date | 44% |
| ElaraUmm Suqeim 3 | Q4 2026Being built | 78% |
| Design QuarterZaa'Beel Second | Q1 2027Being built | 41% |
| Bluewaters BayDubai Marina | Q1 2027Being built | 37% |
More questions about Atelis at d3
From AED 2.47M for a 937 sq ft 1-bed, the lowest typical price paid in the 12 months.
Q3 2029, the planned date in DLD’s register.
It is not past its planned date. It was 1% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.
280 homes on 43 floors: 141 1-bed flats of 749–1,139 sq ft, 102 2-bed flats of 1,341–2,033 sq ft, 20 3-bed flats of 2,125–2,592 sq ft, 15 4+ bed flats of 2,860–6,503 sq ft and 2 4+ bed flats of 6,253–7,278 sq ft.
Down 1% for 1-bed flats, per sq ft.
About AED 110k a year for a 1-bed, AED 165k for a 2-bed, AED 245k for a 3-bed and AED 600k for a 4+ bed in Zaa'Beel Second, a gross yield of about 5.3% Estimate.
Of Meraas’ 66 projects on DLD’s record, 29 are finished. Of the 36 being built, 2 are past their planned date.
In Dubai Design District, Zaa'Beel Second, 8 minutes by car to Downtown Dubai and 22 to Dubai Airport (DXB). Burj Khalifa / Dubai Mall Metro station on the Red Line is 3.3 km away.
More nearby
Off-plan nearby
- The Edit at d3From AED 2.44M0% built · Planned Q1 2030
- Artistry One ResidencesFrom AED 2.36M0% built · Planned Q1 2029
- Artistry Two ResidencesFrom AED 2.45M0% built · Planned Q1 2029
- Design QuarterFrom AED 1.99M41% built · Planned Q1 2027
- Akala Hotels and ResidencesFrom AED 3.88M2% built · Planned Q4 2029
