Golf Meadow
Dubai SouthEmaar
Golf Meadow is an off-plan project by Emaar in Dubai South, with 188 homes on 11 floors. DLD’s last inspection, on 26 Oct 2026, found it 5% built.
- Built
- 5%
- Handover
- Q3 2029
- Sales in 12 months
- 5
- Homes
- 188
Progress
- Apr–Jun 2025Launch sales · 0
- Q3 2025Building started
- Oct 2026Last inspection · 5%
- Q3 2029Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- Not enough sales1 sale
- 2 beds
- Not enough sales2 sales
- 3 beds
- Not enough sales2 sales
Against 66 Dubai South off-plan projects with 10 or more sales
- Lowest750AED/sq ft
- Typical1,580AED/sq ft
- Golf Meadow1,894AED/sq ft
- Highest2,550AED/sq ft
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| May 2026 · 1 sale | ||||
| 4 May 2026 | 1 bed | 721 | 1,982 | AED 1.43M |
| Apr 2026 · 1 sale | ||||
| 8 Apr 2026 | 2 beds | 1,133 | 1,477 | AED 1.67M |
| Feb 2026 · 2 sales | ||||
| 16 Feb 2026 | 2 beds | 1,083 | 1,966 | AED 2.13M |
| 10 Feb 2026 | 3 beds | 1,571 | 1,743 | AED 2.74M |
| Jan 2026 · 1 sale | ||||
| 20 Jan 2026 | 3 beds | 1,570 | 1,894 | AED 2.97M |
Homes
188 homes by size
- 1 bed37%69 homes · 714–912 sq ft · 4 layouts
- 2 beds49%93 homes · 1,071–1,377 sq ft · 5 layouts
- 3 beds14%26 homes · 1,576–2,912 sq ft · 4 layouts
Location
Drive times
- Downtown Dubai39min
- Dubai Airport (DXB)44min
- Dubai Marina28min
By car.
Area guideDubai SouthFinished homesAED 1,100/sq ft1-bed rentAED 57k/yrGross yieldEstimate7.4%Developer
- 193 finished
- 139 being built, on time
- 3 past their planned date
- Escrow bank
- Mashreq Bank
- Legal name
- Emaar Dubai South Dwc LLC
Also being built by Emaar
| Project | Handover | Built |
|---|---|---|
| MaysanTown Square | Q3 2016Past planned date | 37% |
| Teema 1 & Teema 2Al Yalayis 4 | Q3 2016Past planned date | 9% |
| Ocean StarDubai Maritime City | Q3 2025Past planned date | 30% |
| SeascapeDubai Maritime City | Q4 2026Being built | 79% |
| The St. Regis Residences, Downtown DubaiDowntown Dubai | Q4 2026Being built | 76% |
More questions about Golf Meadow
Q3 2029, the planned date in DLD’s register.
It is not past its planned date. It was 5% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.
188 homes on 11 floors: 69 1-bed flats of 714–912 sq ft, 93 2-bed flats of 1,071–1,377 sq ft and 26 3-bed flats of 1,576–2,912 sq ft.
About AED 57k a year for a 1-bed, AED 85k for a 2-bed and AED 120k for a 3-bed in Dubai South, a gross yield of about 7.4% Estimate.
Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.
In Dubai South, 39 minutes by car to Downtown Dubai and 44 to Dubai Airport (DXB).
More nearby
Off-plan nearby
- Azizi Venice 14From AED 629k30% built · Past planned date
- Azizi Venice 6From AED 730k12% built · Planned Q4 2027
- Azizi Venice 15From AED 692k0% built · Planned Q2 2027
- Azizi Venice 7From AED 640k29% built · Past planned date
- Azizi Venice 13From AED 650k46% built · Planned Q3 2027
- Azizi Venice 12From AED 650k22% built · Planned Q3 2027