Skip to content

Hillmont Residences by Ellington

Jumeirah Village CircleEllington

Hillmont Residences by Ellington is an off-plan project by Ellington in Jumeirah Village Circle, with 144 homes on 12 floors. DLD’s last inspection, on 26 Oct 2026, found it 26% built.

Built
26%
Handover
Q4 2026
Sales in 12 months
2
Homes
144

About

Flats from studios to 3 beds in the middle of Jumeirah Village Circle, a planned community with parks and schools, with views of the Dubai skyline. Residents share a pool, a kids’ pool, a fitness studio, a club lounge and gardens. Bike parking and a dog wash are built in.

  • Central JVC, near parks and schools
  • Dog wash and bike parking
  • Studios to 3-bed flats

Shared facilities

  • Pool
  • Kids’ pool
  • Fitness studio
  • Club lounge
  • Lobby lounge
  • Kids’ play areas
  • Landscaped gardens
  • Dog wash

Progress

26%built
  1. Q2 2024Building started
  2. Jul–Sep 2024Launch sales · 103
  3. Oct 2026Last inspection · 26%
  4. Q4 2026Planned handover

Prices

Price per sq ft

Not enough sales

Typical price by size

1 bed
Not enough sales2 sales

Against 99 JVC off-plan projects with 10 or more sales

  • Lowest825AED/sq ft
  • Typical1,497AED/sq ft
  • Hillmont Residences by Ellington1,514AED/sq ft
  • Highest2,276AED/sq ft

Latest sales

Newest first
2 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Jul 2026 · 1 sale
10 Jul 20261 bed8341,439AED 1.2M
Nov 2025 · 1 sale
24 Nov 20251 bed8341,589AED 1.33M

Homes

144 homes by size

  • Studio9%13 homes · 451 sq ft · 1 layout
  • 1 bed60%87 homes · 771–885 sq ft · 9 layouts
  • 2 beds28%40 homes · 1,108–1,296 sq ft · 5 layouts
  • 3 beds3%4 homes · 1,805–1,866 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)35min
  • Dubai Marina22min

By car. JBR Beach, the nearest beach, is 7.5 km away.

Rated schools

  • JSS International SchoolIndian · Very good2.1 kmaway
  • Nord Anglia International SchoolUK · Outstanding2.4 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 203210 minwalk
  • Dubai Internet CityRed Line5.5 kmaway
  • Al YalayisEtihad Rail5.9 kmaway
  • Al Maktoum AirportHigh-speed rail · planned19 kmaway
  • Al Maktoum InternationalDWC19 kmaway
Area guideJVCFinished homesAED 1,298/sq ft1-bed rentAED 71k/yrGross yieldEstimate7.3%

Developer

  • 18 finished
  • 25 being built, on time
  • 7 past their planned date
  • 1 not started
Escrow bank
Abu Dhabi Commercial Bank
Legal name
B L G Development L.L.C

Also being built by Ellington

Ellington’s other projects
ProjectHandoverBuilt
The PortmanJVCQ3 2025Past planned date79%
UH West BY EllingtonJLTQ1 2026Past planned date71%
UH East BY EllingtonJLTQ1 2026Past planned date47%
The QuaysideBusiness BayQ1 2026Past planned date55%
The Waterside Villas BY EllingtonMajanQ2 2026Past planned date32%
All 51 Ellington projects
Questions

More questions about Hillmont Residences by Ellington

Q4 2026, the planned date in DLD’s register.

It is not past its planned date. It was 26% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.

144 homes on 12 floors: 13 studios of 451 sq ft, 87 1-bed flats of 771–885 sq ft, 40 2-bed flats of 1,108–1,296 sq ft and 4 3-bed flats of 1,805–1,866 sq ft.

About AED 48k a year for a studio, AED 71k for a 1-bed, AED 100k for a 2-bed and AED 143k for a 3-bed in JVC, a gross yield of about 7.3% Estimate.

Of Ellington’s 51 projects on DLD’s record, 18 are finished. Of the 32 being built, 7 are past their planned date.

In Jumeirah Village Circle, 27 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Dubai Internet City Metro station on the Red Line is 5.5 km away.

More nearby

How the numbers work