Keturah Reserve
Dubai Hills EstateMAG
Keturah Reserve is an off-plan project by MAG in Dubai Hills Estate, with 644 homes on 14 floors. DLD’s last inspection, on 26 Oct 2026, found it 10% built.
- Built
- 10%
- Handover
- Q2 2027
- Since launch
- Down 1%2 beds price per sq ft
- Homes
- 644
About
Keturah Reserve is a community of 533 homes in Dubai Hills Estate, with flats in buildings of up to 14 floors alongside villas and townhouses. Most homes are 2-bed flats, and the rest run from 1-bed to 4-bed, designed to bring planting and natural light indoors. Residents share a park, a pool and a fountain on a landscaped podium.
- Flats, villas and townhouses
- Nature-led biophilic design
- Mostly 2-bed homes
Shared facilities
- Park
- Pool
- Fountain
- Landscaped podium
Progress
- Q4 2022Building started
- Jan–Mar 2025Launch sales · 20
- Oct 2026Last inspection · 10%
- Q2 2027Planned handover
Prices
Price per sq ft
Typical price by size
- 2 beds
- AED 5.9M2,080 sq ft · 6 sales
Against 14 Hills Estate off-plan projects with 10 or more sales
- Lowest2,135AED/sq ft
- Typical2,439AED/sq ft
- Keturah Reserve2,665AED/sq ft
- Highest2,800AED/sq ft
MAG’s own price starts at AED 3.8M. DLD’s AED 5.9M is the lowest typical price paid in the 12 months.
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Jun 2026 · 1 sale | ||||
| 22 Jun 2026 | 2 beds | 2,272 | 2,530 | AED 5.75M |
| Feb 2026 · 1 sale | ||||
| 9 Feb 2026 | 2 beds | 1,646 | 2,665 | AED 4.39M |
| Jan 2026 · 1 sale | ||||
| 5 Jan 2026 | 2 beds | 2,080 | 2,604 | AED 5.42M |
| Dec 2025 · 1 sale | ||||
| 26 Dec 2025 | 2 beds | 2,080 | 2,907 | AED 6.05M |
| Nov 2025 · 1 sale | ||||
| 20 Nov 2025 | 2 beds | 1,806 | 3,682 | AED 6.65M |
Homes
644 homes by size
- 1 bed39%208 homes · 1,141–2,702 sq ft · 7 layouts
- 2 beds54%288 homes · 1,646–3,755 sq ft · 12 layouts
- 3 beds3%16 homes · 2,876–3,037 sq ft · 2 layouts
- 4 beds4%21 homes · 4,173–5,034 sq ft · 3 layouts
Payment plan
MAG’s project page40% during construction · 60% on handover
Payments go to the project’s escrow account at Emirates NBD Bank.
Location
Drive times
- Downtown Dubai20min
- Dubai Airport (DXB)30min
- Dubai Marina22min
By car. Jumeirah Open Beach, the nearest beach, is 7.5 km away.
Rated schools
- Hartland International School - FZUK · Very good4.0 kmaway
Getting around
- District OneGold Line · opens 203229 minwalk
- MeydanEtihad Rail · planned2.2 kmaway
- Business BayRed Line5.6 kmaway
- Al JaddafHigh-speed rail · planned10.0 kmaway
- Dubai InternationalDXB14 kmaway
Developer
- 5 finished
- 3 being built, on time
- 2 past their planned date
- 1 not started
- Escrow bank
- Emirates NBD Bank
- Legal name
- MAG Park Real Estate Development L.L.C-FZ
More by MAG
| Project | Handover | Built |
|---|---|---|
| MAG 777Dubai Sports City | Q1 2026Past planned date | 67% |
| Keturah ResortSama Al Jadaf | Q1 2026Past planned date | 16% |
| Vue de LacJLT | Q4 2026Being built | 0% |
| MBL SignatureJLT | Q1 2027Being built | 60% |
| MAG 11Majan | Q3 2028Not started | 0% |
More questions about Keturah Reserve
From AED 5.9M for a 2,080 sq ft 2-bed, the lowest typical price paid in the 12 months.
Q2 2027, the planned date in DLD’s register.
It is not past its planned date. It was 10% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 7 months.
644 homes on 14 floors: 208 1-bed flats of 1,141–2,702 sq ft, 288 2-bed flats of 1,646–3,755 sq ft, 16 3-bed flats of 2,876–3,037 sq ft and 21 4+ bed flats of 4,173–5,034 sq ft.
Down 1% for 2-bed flats, per sq ft.
About AED 90k a year for a 1-bed, AED 140k for a 2-bed and AED 250k for a 3-bed in Hills Estate, a gross yield of about 6.1% Estimate.
Of MAG’s 11 projects on DLD’s record, 5 are finished. Of the 5 being built, 2 are past their planned date.
In Dubai Hills Estate, 20 minutes by car to Downtown Dubai and 30 to Dubai Airport (DXB). Business Bay Metro station on the Red Line is 5.6 km away.
More nearby
Off-plan nearby
- Eden House Dubai HillsNo sales0% built · Planned Q4 2027
- RosehillFrom AED 1.65M8% built · Planned Q2 2029
- Vida Residences Club PointFrom AED 1.73M44% built · Planned Q1 2029
- Golf HillsideFrom AED 1.54M66% built · Planned Q4 2028
- Club PlaceFrom AED 1.66M69% built · Planned Q4 2028
- Greenside ResidenceFrom AED 1.62M93% built · Handover not on record
