Vue de Lac
Jumeirah Lake TowersMAG
Vue de Lac is an off-plan project by MAG in Jumeirah Lake Towers, with 453 homes on 40 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q4 2026
- Sales in 12 months
- No sales
- Homes
- 453
Progress
0%built
- Q2 2023Building started
- Oct 2026Last inspection · 0%
- Q4 2026Planned handover
Location
Drive times
- Downtown Dubai25min
- Dubai Airport (DXB)38min
- Dubai Marina13min
By car.
Area guideJLTFinished homesAED 1,451/sq ft1-bed rentAED 82k/yrGross yieldEstimate7.1%Developer
- 5 finished
- 3 being built, on time
- 2 past their planned date
- 1 not started
- Escrow bank
- Abu Dhabi Commercial Bank
- Legal name
- MAG Palace Properties Development L.L.C
More by MAG
| Project | Handover | Built |
|---|---|---|
| MAG 777Dubai Sports City | Q1 2026Past planned date | 67% |
| Keturah ResortSama Al Jadaf | Q1 2026Past planned date | 16% |
| MBL SignatureJLT | Q1 2027Being built | 60% |
| Keturah ReserveDubai Hills Estate | Q2 2027Being built | 10% |
| MAG 11Majan | Q3 2028Not started | 0% |
More questions about Vue de Lac
Q4 2026, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.
About AED 58k a year for a studio, AED 82k for a 1-bed, AED 120k for a 2-bed, AED 168k for a 3-bed and AED 285k for a 4+ bed in JLT, a gross yield of about 7.1% Estimate.
Of MAG’s 11 projects on DLD’s record, 5 are finished. Of the 5 being built, 2 are past their planned date.
In Jumeirah Lake Towers, 25 minutes by car to Downtown Dubai and 38 to Dubai Airport (DXB).
More nearby
Off-plan nearby
- Eltiera ViewsFrom AED 2.06M0% built · Planned Q4 2029
- Eltiera HeightsFrom AED 2.11M3% built · Planned Q4 2028
- Serenia District - EastFrom AED 1.97M1% built · Planned Q2 2030
- Diamondz by DanubeFrom AED 1.14M16% built · Handover not on record
- Seven City JLTFrom AED 515k28% built · Past planned date
- MBL SignatureFrom AED 743k60% built · Planned Q1 2027