Skip to content

Oria

Dubai Creek HarbourEmaar

FromAED 2.8M2 beds · 1,224 sq ft

Oria is an off-plan project by Emaar in Dubai Creek Harbour, with 163 homes on 20 floors. DLD’s last inspection, on 26 Oct 2026, found it 71% built.

Built
71%
Handover
Not on record
Since launch
No change2 beds price per sq ft
Homes
163

About

Oria is a 20-floor building of 163 homes in the Creek Beach district of Dubai Creek Harbour, close to Central Park and the Harbour Promenade. Homes run from 1-bed to 3-bed flats, with 2-bed flats the most common, behind shaded balconies and tinted windows. Residents share a podium with a yoga area, a BBQ and picnic area and pools for adults and children.

  • Near Central Park
  • Shaded balconies
  • Podium with yoga area

Shared facilities

  • Pool
  • Kids’ pool
  • Indoor and outdoor gym
  • Multipurpose room
  • Yoga area
  • BBQ and picnic area
  • Kids’ play area
  • Common garden

Progress

71%built
  1. Mar–May 2024Launch sales · 152
  2. Q2 2024Building started
  3. Oct 2026Last inspection · 71%

Prices

Price per sq ft

Not enough sales

Typical price by size

1 bed
Not enough sales2 sales
2 beds
AED 2.8M1,224 sq ft · 2,203 AED/sq ft · 3 sales

Against 16 Creek Harbour off-plan projects with 10 or more sales

  • Lowest2,231AED/sq ft
  • Oria2,291AED/sq ft
  • Typical2,454AED/sq ft
  • Highest2,990AED/sq ft

Emaar’s own price starts at AED 1.7M. DLD’s AED 2.8M is the lowest typical price paid in the 12 months.

Latest sales

Newest first
5 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 1 sale
2 Oct 20261 bed7492,376AED 1.78M
Jun 2026 · 1 sale
8 Jun 20262 beds1,2231,962AED 2.4M
Apr 2026 · 1 sale
27 Apr 20262 beds1,2732,203AED 2.8M
Mar 2026 · 1 sale
5 Mar 20261 bed7502,420AED 1.81M
Nov 2025 · 1 sale
3 Nov 20252 beds1,2242,291AED 2.8M

Homes

163 homes by size

  • 1 bed30%49 homes · 749 sq ft · 1 layout
  • 2 beds45%74 homes · 1,223–1,300 sq ft · 3 layouts
  • 3 beds25%40 homes · 1,659–1,717 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai20min
  • Dubai Airport (DXB)20min
  • Dubai Marina34min

By car. La Mer Beach, the nearest beach, is 9.9 km away.

Rated schools

  • Universal American SchoolUS/IB · Very good2.1 kmaway
  • New Indian Model SchoolIndian · Good3.5 kmaway

Getting around

  • Dubai Festival CityBlue Line · opens 20295 minwalk
  • CreekGreen Line2.0 kmaway
  • Al JaddafHigh-speed rail · planned2.9 kmaway
  • Dubai InternationalDXB5.3 kmaway
  • MeydanEtihad Rail · planned7.3 kmaway
Area guideCreek HarbourFinished homesAED 2,343/sq ft1-bed rentAED 100k/yrGross yieldEstimate5.5%

Developer

  • 193 finished
  • 139 being built, on time
  • 3 past their planned date
Escrow bank
Emirates NBD Bank
Legal name
Dubai Creek Harbour L.L.C

Also being built by Emaar

Emaar’s other projects
ProjectHandoverBuilt
MaysanTown SquareQ3 2016Past planned date37%
Teema 1 & Teema 2Al Yalayis 4Q3 2016Past planned date9%
Ocean StarDubai Maritime CityQ3 2025Past planned date30%
SeascapeDubai Maritime CityQ4 2026Being built79%
The St. Regis Residences, Downtown DubaiDowntown DubaiQ4 2026Being built76%
All 335 Emaar projects
Questions

More questions about Oria

From AED 2.8M for a 1,224 sq ft 2-bed, the lowest typical price paid in the 12 months.

163 homes on 20 floors: 49 1-bed flats of 749 sq ft, 74 2-bed flats of 1,223–1,300 sq ft and 40 3-bed flats of 1,659–1,717 sq ft.

0% for 2-bed flats, per sq ft.

About AED 100k a year for a 1-bed, AED 150k for a 2-bed and AED 220k for a 3-bed in Creek Harbour, a gross yield of about 5.5% Estimate.

Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.

In Dubai Creek Harbour, 20 minutes by car to Downtown Dubai and 20 to Dubai Airport (DXB). Creek Metro station on the Green Line is 2.0 km away.

More nearby

How the numbers work

FromAED 2.8MSee it on the map