
Dubai Creek Harbour
Dubaiالخيران الأولىAlso known as Al Kheeran First
Dubai Creek Harbour has 49 finished buildings and 17 off-plan projects. Flats sold for a typical AED 2,343 per sq ft in 12 months, 72% above Dubai.
- Price per sq ft
- 2,343AED · ▼ 6.0% since Nov 2025
- 1-bed rent
- 100kAED a year
- Gross yieldEstimate
- 5.5%Flats, every size
- Buildings
- 491,075 finished-home sales
- New homes due
- 7,35817 off-plan projects
About
DLD’s register lists 7,822 homes here, most of them 2-beds, then 1-beds. Of the 27 buildings with an opening year on record, 26 opened in 2019 or later. 71% of its flat sales in 12 months were off-plan.
- Nearest Metro Creek · Green Line · 1.6 km
- Best for rental income
- Best for choice of buildings
- Watch out for no metro station
- Watch out for lots of new supply
Prices
Price per sq ft
Typical price by size
- Studio
- Not enough sales0 sales
- 1 bed
- AED 1.73M365 sales
- 2 beds
- AED 2.7M481 sales
- 3 beds
- AED 4.05M219 sales
- 4+ beds
- AED 8.45M10 sales
Against all of Dubai
- Dubai1,362AED/sq ft
- Entry level here1,980AED/sq ft
- Dubai Creek Harbour2,343AED/sq ft
- High end here2,866AED/sq ft
10th priciest of 60 areas · finished flats, 12 months
Against next door
- Al KheeranAED 1,343/sq ft43% cheaper
- Nadd Al HamarAED 1,043/sq ft55% cheaper
- Al KheeranAED 97k/yr3% cheaper
- Ras Al Khor Ind. SecondAED 58k/yr43% cheaper
- Nadd Al HamarAED 60k/yr40% cheaper
- Ras Al Khor Ind. ThirdAED 62k/yr38% cheaper
- Al KheeranGross7.2%1.7 points higher
- Nadd Al HamarGross6.5%1.0 points higher
Rent
Rent by size
- 1 bed
- AED 100k/yr1,588 rents · yield 5.8%
- 2 beds
- AED 150k/yr1,637 rents · yield 5.6%
- 3 beds
- AED 220k/yr612 rents · yield 5.4%
- 4+ beds
- AED 449k/yr18 rents · yield 5.3%
The 13th priciest 1-bed rent of 121 areas. 3,855 new rent contracts were signed here in 12 months. Gross yields are an Estimate. Rent in every Dubai area
Buildings
Every building
49 buildings · lowest price first, those with 10 or more sales first7,822 homes by size
17 buildings- 1 bed33%2,620 homes
- 2 beds44%3,423 homes
- 3 beds21%1,664 homes
- 4 beds1%111 homes
- 6 beds4 homes
Off-plan
- Homes due
- 7,358
- Projects
- 17
When the new homes are due
- 2027905homes
- 20293,460homes
- 20301,846homes
- No planned date1,147homes
Every project
17 projects, most sold first| Project | Handover | Built | Homes | From | Sales |
|---|---|---|---|---|---|
| Creek BayEmaar | Q2 2030 | 1% | 762 | AED 2.03M1 bed | 700 |
| Creek HavenEmaar | Q1 2030 | 1% | 593 | AED 1.92M1 bed | 473 |
| Lyvia by PalaceEmaar | Q3 2029 | 5% | 478 | AED 2.11M1 bed | 462 |
| ValiaEmaar | Q3 2030 | 0% | 491 | AED 2.13M1 bed | 425 |
| MontivaEmaar | Q3 2029 | 6% | 474 | AED 2.04M1 bed | 153 |
| SilvaEmaar | Q3 2029 | 10% | 434 | AED 1.83M1 bed | 133 |
| AltanEmaar | Q3 2029 | 11% | 479 | AED 1.82M1 bed | 69 |
| Creek Waters 2Emaar | Q4 2027 | 82% | 455 | AED 1.81M1 bed | 48 |
| Creek WatersEmaar | Q3 2027 | 81% | 450 | AED 1.76M1 bed | 44 |
| AlberoEmaar | Q3 2029 | 11% | 479 | AED 1.87M1 bed | 37 |
| Address Residences l Dubai Creek HarbourEmaar | Q1 2029 | 26% | 324 | AED 2.13M1 bed | 29 |
| AltusEmaar | Q1 2029 | 64% | 280 | AED 1.8M1 bed | 22 |
| Palace Residences Creek BlueEmaar | Q1 2029 | 21% | 512 | AED 2M1 bed | 13 |
| AeonEmaar | No planned date | 90% | 262 | AED 1.75M1 bed | 10 |
| ArloEmaar | No planned date | 35% | 431 | AED 1.85M1 bed | 10 |
| ValoEmaar | No planned date | 66% | 291 | AED 1.89M1 bed | 10 |
| OriaEmaar | No planned date | 71% | 163 | AED 2.8M2 beds | 5 |
Location
Drive times
- Downtown Dubai20min
- Dubai Airport (DXB)20min
- Dubai Marina34min
By car. La Mer Beach, the nearest beach, is 9.2 km away.
Rated schools
- Universal American SchoolUS/IB · Very good2.7 kmaway
- New Indian Model SchoolIndian · Good3.6 kmaway
Getting around
- Dubai Festival CityBlue Line · opens 202914 minwalk
- CreekGreen Line27 minwalk
- Al JaddafHigh-speed rail · planned2.5 kmaway
- Dubai InternationalDXB5.6 kmaway
- MeydanEtihad Rail · planned6.8 kmaway
- Bus C04To the Green Line
Getting to work
| To | Car | Metro and bus | Nol |
|---|---|---|---|
| DIFC | 20 min | 1 hr 21 min | AED 132/mo |
| Dubai Media City | 31 min | 1 hr 24 min | AED 220/mo |
| Downtown Dubai | 20 min | 1 hr 26 min | AED 132/mo |
| Dubai International Airport (DXB) | 20 min | 1 hr 29 min | AED 220/mo |
| Jebel Ali Free Zone | 40 min | 1 hr 43 min | AED 330/mo |
| Dubai Internet City | 30 min | 1 hr 26 min | AED 220/mo |
| Dubai Knowledge Park | 32 min | 1 hr 28 min | AED 220/mo |
| Dubai Airport Free Zone | 20 min | 1 hr 39 min | AED 220/mo |
| Dubai Healthcare City | 19 min | 53 min | AED 132/mo |
Travel times © openrouteservice.org by HeiGIT, map data © OpenStreetMap contributors · Public transport timetables © RTA, Dubai open data
More questions about Dubai Creek Harbour
About AED 100k a year for a 1-bed, AED 150k for a 2-bed and AED 220k for a 3-bed. The 13th priciest 1-bed rent of 121 areas. 3,855 new rent contracts were signed here in 12 months.
A 1-bed sells for about AED 1.73M, a 2-bed sells for about AED 2.7M and a 3-bed sells for about AED 4.05M, the typical price paid in 12 months.
Down 6% per sq ft since Nov 2025, for finished flats.
About 5.5% gross Estimate. 1-beds earn the most, 5.8% gross. 71% of flat sales here are off-plan.
No. Dubai Festival City station on the Blue Line is planned to open in Sep 2029. Buses C04 run to the Green Line.
Creek station, on the Green Line, 1.6 km from the middle of Dubai Creek Harbour in a straight line.
20 min by car and 1 hr 21 min by Metro and bus at 8am on a weekday.
2 rated schools within 5 km of its middle. The nearest, Universal American School, is rated Very good.
7,358 homes in 17 off-plan projects.
DLD and Dubai Municipality call it Al Kheeran First (الخيران الأولى). Title deeds and rent contracts use that name.
More nearby
Next-door areas
Most searched projects
Developer's pictureCreek WatersFrom AED 1.76M81% built · Planned Q3 2027
Developer's pictureCreek BayFrom AED 2.03M1% built · Planned Q2 2030
Developer's pictureCreek Waters 2From AED 1.81M82% built · Planned Q4 2027
Developer's pictureCreek HavenFrom AED 1.92M1% built · Planned Q1 2030- Palace Residences Creek BlueFrom AED 2M21% built · Planned Q1 2029
Developer's pictureLyvia by PalaceFrom AED 2.11M5% built · Planned Q3 2029