Skip to content

Dubai Creek Harbour

Dubaiالخيران الأولىAlso known as Al Kheeran First

FromAED 1.73M1 bed flat

Dubai Creek Harbour has 49 finished buildings and 17 off-plan projects. Flats sold for a typical AED 2,343 per sq ft in 12 months, 72% above Dubai.

Price per sq ft
2,343AED · ▼ 6.0% since Nov 2025
1-bed rent
100kAED a year
Gross yieldEstimate
5.5%Flats, every size
Buildings
491,075 finished-home sales
New homes due
7,35817 off-plan projects

About

DLD’s register lists 7,822 homes here, most of them 2-beds, then 1-beds. Of the 27 buildings with an opening year on record, 26 opened in 2019 or later. 71% of its flat sales in 12 months were off-plan.

  • Nearest Metro Creek · Green Line · 1.6 km
  • Best for rental income
  • Best for choice of buildings
  • Watch out for no metro station
  • Watch out for lots of new supply

Prices

Price per sq ft

Typical price by size

Studio
Not enough sales0 sales
1 bed
AED 1.73M365 sales
2 beds
AED 2.7M481 sales
3 beds
AED 4.05M219 sales
4+ beds
AED 8.45M10 sales

Against all of Dubai

  • Dubai1,362AED/sq ft
  • Entry level here1,980AED/sq ft
  • Dubai Creek Harbour2,343AED/sq ft
  • High end here2,866AED/sq ft

10th priciest of 60 areas · finished flats, 12 months

Against next door

Rent

Rent by size

1 bed
AED 100k/yr1,588 rents · yield 5.8%
2 beds
AED 150k/yr1,637 rents · yield 5.6%
3 beds
AED 220k/yr612 rents · yield 5.4%
4+ beds
AED 449k/yr18 rents · yield 5.3%

The 13th priciest 1-bed rent of 121 areas. 3,855 new rent contracts were signed here in 12 months. Gross yields are an Estimate. Rent in every Dubai area

Buildings

Every building

49 buildings · lowest price first, those with 10 or more sales first
Every building in Dubai Creek Harbour with sales, Nov 2025 – Oct 2026
BuildingAED/sq ftSalesGross yield
Creek Beach - Orchid 2,123 21 6.2%
Creek Beach - Grove 2,136 29 5.8%
17 Icon Bay 2,156 29 5.5%
The Cove II Building 5 2,175 14 5.5%
Creek Rise 2,179 47 5.6%
Creek Beach - Bayshore 2,181 27 5.6%
Harbour Gate 2,219 41 5.6%
Creek Horizon 2,224 41 5.6%
The Dubai Creek Residences 2,227 72 5.3%
Creek Beach - Rosewater 2,231 38 6.0%
Cedar at Creek Beach Building 2 2,235 12 5.3%
Savanna at Creek Beach Building 3 2,239 19 5.3%
Creek Beach - Sunset 2,244 11 5.3%
Creekside 18 2,266 34 5.4%
The Cove II Building 4 2,270 23 5.2%
The Cove 2,278 31 5.6%
Creek Beach - Lotus 2,290 25 5.7%
Creek Gate 2,314 32 5.4%
Harbour Views 2,342 42 5.4%
Creek Beach - Breeze 2,347 11 5.9%
Island Park II 2,426 28 6.2%
Island Park I 2,453 29 6.1%
Creek Edge 2,485 33 5.4%
The Cove II Building 10 2,498 10 4.8%
Creek Crescent 2,530 27 5.6%
The Cove II Building 9 2,551 13 4.7%
Creek Beach - Vida Residences 2,606 22 5.8%
Palace Residences - North 2,661 76 5.3%
The Grand 2,731 86 5.2%
Creek Palace 2,764 47 5.3%
Palace Residences - Dubai Creek Harbour 2,899 32 5.2%
Creek Beach - Summer 2,004 9 6.5%
Creek Beach - Moor Building 1 2,093 9 5.5%
The Cove II Building 6 2,094 9 5.7%
Cedar at Creek Beach Building 3 2,147 7 5.5%
Cedar at Creek Beach Building 1 2,178 9 5.4%
Creek Beach - Moor Building 4 2,210 2 Not enough sales
Cedar at Creek Beach Building 4 2,244 7 5.3%
Savanna at Creek Beach Building 2 2,282 7 5.2%
Savanna at Creek Beach Building 1 2,299 6 5.1%
Creek Beach - Canopy Building 1 2,305 1 Not enough sales
Creek Beach - Surf 2,395 9 5.3%
The Cove II Building 8 2,449 9 4.8%
Mangrove at Creek Beach Building 2 2,467 8 4.8%
Creek Beach - Moor Building 3 2,546 3 4.6%
The Cove II Building 11 2,554 6 4.6%
Mangrove at Creek Beach Building 1 2,610 2 Not enough sales
The Cove II Building 7 2,682 7 4.4%
The Cove II Townhouses 3,230 1 Not enough sales

7,822 homes by size

17 buildings
  • 1 bed33%2,620 homes
  • 2 beds44%3,423 homes
  • 3 beds21%1,664 homes
  • 4 beds1%111 homes
  • 6 beds4 homes

Off-plan

Homes due
7,358
Projects
17

When the new homes are due

  • 2027905homes
  • 20293,460homes
  • 20301,846homes
  • No planned date1,147homes

Every project

17 projects, most sold first
Off-plan projects in Dubai Creek Harbour
ProjectHandoverBuiltHomesFromSales
Creek BayEmaar Q2 2030 1% 762 AED 2.03M1 bed 700
Creek HavenEmaar Q1 2030 1% 593 AED 1.92M1 bed 473
Lyvia by PalaceEmaar Q3 2029 5% 478 AED 2.11M1 bed 462
ValiaEmaar Q3 2030 0% 491 AED 2.13M1 bed 425
MontivaEmaar Q3 2029 6% 474 AED 2.04M1 bed 153
SilvaEmaar Q3 2029 10% 434 AED 1.83M1 bed 133
AltanEmaar Q3 2029 11% 479 AED 1.82M1 bed 69
Creek Waters 2Emaar Q4 2027 82% 455 AED 1.81M1 bed 48
Creek WatersEmaar Q3 2027 81% 450 AED 1.76M1 bed 44
AlberoEmaar Q3 2029 11% 479 AED 1.87M1 bed 37
Address Residences l Dubai Creek HarbourEmaar Q1 2029 26% 324 AED 2.13M1 bed 29
AltusEmaar Q1 2029 64% 280 AED 1.8M1 bed 22
Palace Residences Creek BlueEmaar Q1 2029 21% 512 AED 2M1 bed 13
AeonEmaar No planned date 90% 262 AED 1.75M1 bed 10
ArloEmaar No planned date 35% 431 AED 1.85M1 bed 10
ValoEmaar No planned date 66% 291 AED 1.89M1 bed 10
OriaEmaar No planned date 71% 163 AED 2.8M2 beds 5

Location

Drive times

  • Downtown Dubai20min
  • Dubai Airport (DXB)20min
  • Dubai Marina34min

By car. La Mer Beach, the nearest beach, is 9.2 km away.

Rated schools

  • Universal American SchoolUS/IB · Very good2.7 kmaway
  • New Indian Model SchoolIndian · Good3.6 kmaway

Getting around

  • Dubai Festival CityBlue Line · opens 202914 minwalk
  • CreekGreen Line27 minwalk
  • Al JaddafHigh-speed rail · planned2.5 kmaway
  • Dubai InternationalDXB5.6 kmaway
  • MeydanEtihad Rail · planned6.8 kmaway
  • Bus C04To the Green Line

Getting to work

Travel times from Dubai Creek Harbour at 8am on a weekday, with Nol each month
ToCarMetro and busNol
DIFC20 min1 hr 21 minAED 132/mo
Dubai Media City31 min1 hr 24 minAED 220/mo
Downtown Dubai20 min1 hr 26 minAED 132/mo
Dubai International Airport (DXB)20 min1 hr 29 minAED 220/mo
Jebel Ali Free Zone40 min1 hr 43 minAED 330/mo
Dubai Internet City30 min1 hr 26 minAED 220/mo
Dubai Knowledge Park32 min1 hr 28 minAED 220/mo
Dubai Airport Free Zone20 min1 hr 39 minAED 220/mo
Dubai Healthcare City19 min53 minAED 132/mo

See every trip in the app

Travel times © openrouteservice.org by HeiGIT, map data © OpenStreetMap contributors · Public transport timetables © RTA, Dubai open data

Questions

More questions about Dubai Creek Harbour

About AED 100k a year for a 1-bed, AED 150k for a 2-bed and AED 220k for a 3-bed. The 13th priciest 1-bed rent of 121 areas. 3,855 new rent contracts were signed here in 12 months.

A 1-bed sells for about AED 1.73M, a 2-bed sells for about AED 2.7M and a 3-bed sells for about AED 4.05M, the typical price paid in 12 months.

Down 6% per sq ft since Nov 2025, for finished flats.

About 5.5% gross Estimate. 1-beds earn the most, 5.8% gross. 71% of flat sales here are off-plan.

No. Dubai Festival City station on the Blue Line is planned to open in Sep 2029. Buses C04 run to the Green Line.

Creek station, on the Green Line, 1.6 km from the middle of Dubai Creek Harbour in a straight line.

20 min by car and 1 hr 21 min by Metro and bus at 8am on a weekday.

2 rated schools within 5 km of its middle. The nearest, Universal American School, is rated Very good.

7,358 homes in 17 off-plan projects.

DLD and Dubai Municipality call it Al Kheeran First (الخيران الأولى). Title deeds and rent contracts use that name.

More nearby

How the numbers work

FromAED 1.73MSee it on the map