
Creek Bay
Dubai Creek HarbourEmaar
Creek Bay is an off-plan project by Emaar in Dubai Creek Harbour, with 762 homes on 44 floors. DLD’s last inspection, on 26 Oct 2026, found it 1% built.
- Built
- 1%
- Handover
- Q2 2030
- Sales in 12 months
- 700
- Homes
- 762
About
Flats with 1 to 3 bedrooms on the bay at Dubai Creek Harbour, looking across the water to the Downtown skyline. The outer walls are shaped to play with light and shade through the day. Residents share an infinity pool, a gym and a park, with schools and waterfront shops in the wider community.
- On the water at Creek Harbour
- Views to the Downtown skyline
- 1-bed to 3-bed flats
Shared facilities
- Infinity pool
- Kids’ pool
- Barbecue and picnic areas
- Gym and outdoor fitness
- Playground
- Community park
- Sports park
- Waterfront shops
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 1%
- Q2 2030Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 2.03M753 sq ft · 2,668 AED/sq ft · 322 sales
- 2 beds
- AED 3.81M1,434 sq ft · 3,027 AED/sq ft · 294 sales
- 3 beds
- AED 5.95M1,855 sq ft · 3,206 AED/sq ft · 80 sales
Against 16 Creek Harbour off-plan projects with 10 or more sales
- Lowest2,231AED/sq ft
- Typical2,454AED/sq ft
- Creek Bay2,737AED/sq ft
- Highest2,990AED/sq ft
3rd highest of 16 · AED per sq ft in 12 months
Emaar’s own price starts at AED 1.8M. DLD’s AED 2.03M is the lowest typical price paid in the 12 months.
Latest sales
Plus 4 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 18 Nov 2026 | 2 beds New | 1,451 | 2,175 | AED 3.16M |
| 16 Nov 2026 | 3 beds New | 1,855 | 3,050 | AED 5.66M |
| 9 Nov 2026 | 2 beds New | 1,451 | 2,298 | AED 3.33M |
| 9 Nov 2026 | 2 beds New | 1,248 | 2,985 | AED 3.72M |
| Oct 2026 · 11 sales | ||||
| 28 Oct 2026 | 1 bed | 761 | 2,673 | AED 2.03M |
| 23 Oct 2026 | 2 beds | 1,448 | 2,375 | AED 3.44M |
| 20 Oct 2026 | 2 beds | 1,432 | 3,132 | AED 4.48M |
| 14 Oct 2026 | 3 beds | 1,855 | 3,027 | AED 5.61M |
| 14 Oct 2026 | 3 beds | 1,855 | 3,021 | AED 5.6M |
| 14 Oct 2026 | 2 beds | 1,432 | 3,074 | AED 4.4M |
| 13 Oct 2026 | 2 beds | 1,448 | 2,359 | AED 3.42M |
| 7 Oct 2026 | 2 beds | 1,448 | 2,371 | AED 3.43M |
| 2 Oct 2026 | 1 bed | 735 | 2,488 | AED 1.83M |
| 2 Oct 2026 | 2 beds | 1,432 | 2,984 | AED 4.27M |
| 2 Oct 2026 | 2 beds | 1,448 | 2,284 | AED 3.31M |
| Sep 2026 · 15 sales | ||||
| 29 Sep 2026 | 2 beds | 1,432 | 3,080 | AED 4.41M |
| 28 Sep 2026 | 3 beds | 1,855 | 3,010 | AED 5.58M |
| 25 Sep 2026 | 2 beds | 1,451 | 2,319 | AED 3.36M |
| 25 Sep 2026 | 3 beds | 1,855 | 3,004 | AED 5.57M |
| 17 Sep 2026 | 2 beds | 1,448 | 2,371 | AED 3.43M |
| 17 Sep 2026 | 2 beds | 1,451 | 2,285 | AED 3.31M |
| 14 Sep 2026 | 2 beds | 1,432 | 3,001 | AED 4.3M |
| 14 Sep 2026 | 2 beds | 1,448 | 2,292 | AED 3.32M |
| 10 Sep 2026 | 2 beds | 1,448 | 2,363 | AED 3.42M |
| 10 Sep 2026 | 2 beds | 1,448 | 2,356 | AED 3.41M |
| 10 Sep 2026 | 2 beds | 1,451 | 2,250 | AED 3.26M |
| 9 Sep 2026 | 2 beds | 1,448 | 2,371 | AED 3.43M |
| 7 Sep 2026 | 2 beds | 1,432 | 3,120 | AED 4.47M |
| 7 Sep 2026 | 2 beds | 1,434 | 3,225 | AED 4.62M |
| 7 Sep 2026 | 2 beds | 1,248 | 2,888 | AED 3.6M |
| Aug 2026 · 46 sales | ||||
| 27 Aug 2026 | 1 bed | 761 | 2,673 | AED 2.03M |
| 27 Aug 2026 | 3 beds | 1,855 | 3,130 | AED 5.81M |
| 27 Aug 2026 | 2 beds | 1,448 | 2,351 | AED 3.4M |
| 27 Aug 2026 | 2 beds | 1,432 | 3,167 | AED 4.53M |
| 27 Aug 2026 | 2 beds | 1,248 | 3,123 | AED 3.9M |
| 25 Aug 2026 | 3 beds | 1,855 | 3,055 | AED 5.67M |
| 25 Aug 2026 | 3 beds | 1,855 | 2,992 | AED 5.55M |
| 25 Aug 2026 | 2 beds | 1,448 | 2,351 | AED 3.4M |
| 25 Aug 2026 | 2 beds | 1,246 | 3,563 | AED 4.44M |
| 25 Aug 2026 | 2 beds | 1,434 | 3,213 | AED 4.61M |
| 25 Aug 2026 | 2 beds | 1,448 | 2,392 | AED 3.46M |
| 25 Aug 2026 | 2 beds | 1,448 | 2,368 | AED 3.43M |
| 25 Aug 2026 | 1 bed | 737 | 2,445 | AED 1.8M |
| 21 Aug 2026 | 2 beds | 1,432 | 3,075 | AED 4.4M |
| 21 Aug 2026 | 2 beds | 1,432 | 3,420 | AED 4.9M |
| 21 Aug 2026 | 2 beds | 1,246 | 3,584 | AED 4.47M |
| 21 Aug 2026 | 2 beds | 1,432 | 3,155 | AED 4.52M |
| 21 Aug 2026 | 2 beds | 1,248 | 3,048 | AED 3.8M |
| 17 Aug 2026 | 2 beds | 1,448 | 2,355 | AED 3.41M |
| 14 Aug 2026 | 2 beds | 1,434 | 3,236 | AED 4.64M |
Homes
762 homes by size
- 1 bed43%327 homes · 737–1,087 sq ft · 4 layouts
- 2 beds45%344 homes · 1,089–1,884 sq ft · 10 layouts
- 3 beds12%91 homes · 1,730–2,437 sq ft · 5 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 2.03MLocation
Drive times
- Downtown Dubai20min
- Dubai Airport (DXB)20min
- Dubai Marina33min
By car. La Mer Beach, the nearest beach, is 9.5 km away.
Rated schools
- Universal American SchoolUS/IB · Very good3.1 kmaway
- New Indian Model SchoolIndian · Good4.2 kmaway
Getting around
- Dubai Festival CityBlue Line · opens 202920 minwalk
- CreekGreen Line2.3 kmaway
- Al JaddafHigh-speed rail · planned3.1 kmaway
- Dubai InternationalDXB6.1 kmaway
- MeydanEtihad Rail · planned6.4 kmaway
Developer
- 193 finished
- 139 being built, on time
- 3 past their planned date
- Escrow bank
- Not on record
- Legal name
- Dubai Creek Harbour L.L.C
Also being built by Emaar
| Project | Handover | Built |
|---|---|---|
| MaysanTown Square | Q3 2016Past planned date | 37% |
| Teema 1 & Teema 2Al Yalayis 4 | Q3 2016Past planned date | 9% |
| Ocean StarDubai Maritime City | Q3 2025Past planned date | 30% |
| SeascapeDubai Maritime City | Q4 2026Being built | 79% |
| The St. Regis Residences, Downtown DubaiDowntown Dubai | Q4 2026Being built | 76% |
More questions about Creek Bay
From AED 2.03M for a 753 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 3.81M and 3-bed flats sell for about AED 5.95M.
Q2 2030, the planned date in DLD’s register.
It is not past its planned date. It was 1% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 years.
762 homes on 44 floors: 327 1-bed flats of 737–1,087 sq ft, 344 2-bed flats of 1,089–1,884 sq ft and 91 3-bed flats of 1,730–2,437 sq ft.
About AED 100k a year for a 1-bed, AED 150k for a 2-bed and AED 220k for a 3-bed in Creek Harbour, a gross yield of about 5.5% Estimate.
Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.03M.
In Dubai Creek Harbour, 20 minutes by car to Downtown Dubai and 20 to Dubai Airport (DXB). Creek Metro station on the Green Line is 2.3 km away.
More nearby
Off-plan nearby
- Creek HavenFrom AED 1.92M1% built · Planned Q1 2030
- ValiaFrom AED 2.13M0% built · Planned Q3 2030
- ArloFrom AED 1.85M35% built · Handover not on record
- Creek Waters 2From AED 1.81M82% built · Planned Q4 2027
- AeonFrom AED 1.75M90% built · Handover not on record
- OriaFrom AED 2.8M71% built · Handover not on record
Finished buildings nearby
Typical next door AED 2,606/sq ft · 7 buildings within a 10-minute walk
- The Cove2,278AED/sq ft1-bed rent AED 98k/yr · 10-minute walk
- Creek Beach - Vida Residences2,606AED/sq ft1-bed rent AED 110k/yr · 10-minute walk
- 17 Icon Bay2,156AED/sq ft1-bed rent AED 90k/yr · 10-minute walk
- Creek Palace2,764AED/sq ft1-bed rent AED 100k/yr · 10-minute walk
- Palace Residences - North2,661AED/sq ft1-bed rent AED 95k/yr · 10-minute walk
- Creekside 182,266AED/sq ft1-bed rent AED 88k/yr · 10-minute walk
- Palace Residences - Dubai Creek Harbour2,899AED/sq ft1-bed rent AED 110k/yr · 10-minute walk
- The Grand2,731AED/sq ft1-bed rent AED 115k/yr
- The Dubai Creek Residences2,227AED/sq ft1-bed rent AED 115k/yr
- Creek Rise2,179AED/sq ft1-bed rent AED 104k/yr
- Harbour Views2,342AED/sq ft1-bed rent AED 95k/yr