Palace by the Beach
Dubai HarbourEmaar
Palace by the Beach is an off-plan project by Emaar in Dubai Harbour, with 858 homes on 57 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q4 2031
- Sales in 12 months
- No sales
- Homes
- 858
Progress
- Q2 2026Building started
- Oct 2026Last inspection · 0%
- Q4 2031Planned handover
Homes
858 homes by size
- 1 bed40%342 homes · 636–800 sq ft · 5 layouts
- 2 beds42%362 homes · 1,035–1,445 sq ft · 8 layouts
- 3 beds17%142 homes · 1,867 sq ft · 1 layout
- 4 beds1%12 homes · 3,016–3,047 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai26min
- Dubai Airport (DXB)39min
By car. JBR Beach, the nearest beach, is 1.7 km away.
Rated schools
- Dubai CollegeUK · Outstanding3.7 kmaway
- Regent International Private SchoolUK · Very good3.8 kmaway
Getting around
- Mina SeyahiDubai Tram21 minwalk
- SOBHA REALTYRed Line2.0 kmaway
- Al YalayisEtihad Rail9.2 kmaway
- Al Maktoum AirportHigh-speed rail · planned22 kmaway
- Al Maktoum InternationalDWC22 kmaway
Area guideDubai MarinaFinished homesAED 1,989/sq ft1-bed rentAED 95k/yrGross yieldEstimate5.6%Developer
- 193 finished
- 139 being built, on time
- 3 past their planned date
- Escrow bank
- Not on record
- Legal name
- Emaar Development P.J.S.C.
Also being built by Emaar
| Project | Handover | Built |
|---|---|---|
| MaysanTown Square | Q3 2016Past planned date | 37% |
| Teema 1 & Teema 2Al Yalayis 4 | Q3 2016Past planned date | 9% |
| Ocean StarDubai Maritime City | Q3 2025Past planned date | 30% |
| SeascapeDubai Maritime City | Q4 2026Being built | 79% |
| The St. Regis Residences, Downtown DubaiDowntown Dubai | Q4 2026Being built | 76% |
More questions about Palace by the Beach
Q4 2031, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 5 years.
858 homes on 57 floors: 342 1-bed flats of 636–800 sq ft, 362 2-bed flats of 1,035–1,445 sq ft, 142 3-bed flats of 1,867 sq ft and 12 4+ bed flats of 3,016–3,047 sq ft.
About AED 95k a year for a 1-bed, AED 145k for a 2-bed, AED 215k for a 3-bed and AED 300k for a 4+ bed in Dubai Marina, a gross yield of about 5.6% Estimate.
Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.
In Dubai Harbour, Dubai Marina, 26 minutes by car to Downtown Dubai and 39 to Dubai Airport (DXB). SOBHA REALTY Metro station on the Red Line is 2.0 km away.
More nearby
Off-plan nearby
- BayviewFrom AED 3.74M63% built · Planned Q3 2028
- SeapointFrom AED 3.07M37% built · Planned Q1 2028
- Dubai Harbour Residences (Area 3)From AED 4.16M35% built · Planned Q1 2028
- The Residences at the Dubai Beach EditionFrom AED 10.02M0% built · Planned Q4 2029
- DAMAC BayFrom AED 3.92M34% built · Planned Q1 2027
- W Residences at Dubai HarbourFrom AED 5M4% built · Planned Q4 2027
Finished buildings nearby
Typical next door AED 3,281/sq ft · 4 buildings within a 10-minute walk
- Sunrise Bay2,774AED/sq ft1-bed rent AED 120k/yr · 10-minute walk
- Beach Vista3,400AED/sq ft1-bed rent AED 116k/yr · 10-minute walk
- Marina Vista3,162AED/sq ft1-bed rent AED 125k/yr · 10-minute walk
- Beach Isle3,454AED/sq ft1-bed rent AED 125k/yr · 10-minute walk
- Bluewaters Residences5,629AED/sq ft1-bed rent AED 279k/yr
- Palace Beach Residence3,592AED/sq ft1-bed rent AED 125k/yr
- Park Islands2,010AED/sq ft1-bed rent AED 100k/yr
- Grand Bleu Tower Interiors by Elie Saab3,761AED/sq ft1-bed rent AED 150k/yr
