Portside 2 by Samana Developers
Downtown Jebel AliSamana
Portside 2 by Samana Developers is an off-plan project by Samana in Downtown Jebel Ali, with 263 homes on 19 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q4 2029
- Sales in 12 months
- No sales
- Homes
- 263
Progress
- Q3 2026Building started
- Oct 2026Last inspection · 0%
- Q4 2029Planned handover
Homes
263 homes by size
- Studio43%113 homes · 369–482 sq ft · 11 layouts
- 1 bed44%117 homes · 592–903 sq ft · 9 layouts
- 2 beds13%33 homes · 929–1,398 sq ft · 5 layouts
Location
Drive times
- Downtown Dubai38min
- Dubai Marina26min
By car. Jebel Ali Beach, the nearest beach, is 7.0 km away.
Rated schools
No rated schools within 5 km
Getting around
- Life PharmacyRed Line2.7 kmaway
- Al Maktoum AirportHigh-speed rail · planned11 kmaway
- Al Maktoum InternationalDWC11 kmaway
- Al YalayisEtihad Rail11 kmaway
Developer
- 6 finished
- 41 being built, on time
- 8 past their planned date
- 2 not started
- Escrow bank
- Not on record
- Legal name
- Samana Platinum Real Estate Development L.L.C
Also being built by Samana
| Project | Handover | Built |
|---|---|---|
| Samana MykonosDubai Studio City | Q2 2025Past planned date | 91% |
| Samana WavesJVC | Q4 2025Past planned date | 91% |
| Miami BY SDJumeirah Village Triangle | Q4 2025Past planned date | 71% |
| Samana Waves 2JVC | Q1 2026Past planned date | 52% |
| Samana Mykonos SignatureArjan | Q2 2026Past planned date | 86% |
More questions about Portside 2 by Samana Developers
Q4 2029, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.
263 homes on 19 floors: 113 studios of 369–482 sq ft, 117 1-bed flats of 592–903 sq ft and 33 2-bed flats of 929–1,398 sq ft.
About AED 45k a year for a studio, AED 60k for a 1-bed and AED 90k for a 2-bed in Downtown Jebel Ali, a gross yield of about 7.8% Estimate.
Of Samana’s 57 projects on DLD’s record, 6 are finished. Of the 49 being built, 8 are past their planned date.
In Downtown Jebel Ali, 38 minutes by car to Downtown Dubai and 26 to Dubai Marina. Life Pharmacy Metro station on the Red Line is 2.7 km away.
More nearby
Off-plan nearby
- Azizi GabrielFrom AED 590k1% built · Planned Q3 2028
- Azizi WaresFrom AED 580k2% built · Planned Q1 2028
- Azizi AbrahamNo sales2% built · Planned Q3 2027
- Samana Downtown OneNo sales0% built · Planned Q4 2029
- Peace Avenue by Peace HomesFrom AED 500k4% built · Planned Q1 2029
- Azizi LinaFrom AED 587k2% built · Planned Q3 2028
