Azizi Abraham
Downtown Jebel AliAzizi
Azizi Abraham is an off-plan project by Azizi in Downtown Jebel Ali, with 420 homes on 2 floors. DLD’s last inspection, on 26 Oct 2026, found it 2% built.
- Built
- 2%
- Handover
- Q3 2027
- Sales in 12 months
- No sales
- Homes
- 420
Progress
- Q3 2026Building started
- Oct 2026Last inspection · 2%
- Q3 2027Planned handover
Location
Drive times
- Downtown Dubai36min
- Dubai Airport (DXB)49min
- Dubai Marina22min
By car. Jebel Ali Beach, the nearest beach, is 7.2 km away.
Rated schools
No rated schools within 5 km
Getting around
- Life PharmacyRed Line17 minwalk
- Al YalayisEtihad Rail9.7 kmaway
- Al Maktoum AirportHigh-speed rail · planned11 kmaway
- Al Maktoum InternationalDWC11 kmaway
Developer
- 91 finished
- 47 being built, on time
- 10 past their planned date
- 2 not started
- Escrow bank
- Abu Dhabi Commercial Bank
- Legal name
- Azizi Developments L.L.C
Also being built by Azizi
| Project | Handover | Built |
|---|---|---|
| Azizi GrandDubai Sports City | Q1 2025Past planned date | 82% |
| Azizi Riviera ReveAl Merkadh | Q1 2025Past planned date | 77% |
| Azizi Venice 5Dubai South | Q4 2025Past planned date | 63% |
| Azizi Venice 1Dubai South | Q4 2025Past planned date | 67% |
| Azizi Venice 2Dubai South | Q4 2025Past planned date | 57% |
More questions about Azizi Abraham
Q3 2027, the planned date in DLD’s register.
It is not past its planned date. It was 2% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 10 months.
About AED 45k a year for a studio, AED 60k for a 1-bed, AED 90k for a 2-bed and AED 95k for a 3-bed in Downtown Jebel Ali, a gross yield of about 7.8% Estimate.
Of Azizi’s 150 projects on DLD’s record, 91 are finished. Of the 57 being built, 10 are past their planned date.
In Downtown Jebel Ali, 36 minutes by car to Downtown Dubai and 49 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is a 17-minute walk.
More nearby
Off-plan nearby
- Samana Downtown OneNo sales0% built · Planned Q4 2029
- Peace Avenue by Peace HomesFrom AED 500k4% built · Planned Q1 2029
- Azizi LinaFrom AED 587k2% built · Planned Q3 2028
- Azizi NouraFrom AED 588k2% built · Planned Q3 2028
- Azizi RoseFrom AED 616k0% built · Planned Q3 2028
- Raw District 2 Tower C by ImtiazNo sales0% built · Planned Q4 2029
Finished buildings nearby
Typical next door AED 761/sq ft · 1 building within a 10-minute walk
