Raw District 2 Tower C by Imtiaz
Downtown Jebel AliImtiaz Ja
Raw District 2 Tower C by Imtiaz is an off-plan project by Imtiaz Ja in Downtown Jebel Ali, with 149 homes on 10 floors. DLD’s last inspection, on 31 Aug 2026, found it 0% built.
- Built
- 0%
- Handover
- Q4 2029
- Sales in 12 months
- No sales
- Homes
- 149
Progress
- Aug 2026Last inspection · 0%
- Q4 2026Building started
- Q4 2029Planned handover
Prices
Latest sales
No sales in 12 months, plus 6 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 18 Nov 2026 | 3 beds New | 1,915 | 1,201 | AED 2.3M |
| 13 Nov 2026 | 1 bed New | 732 | 1,680 | AED 1.23M |
| 13 Nov 2026 | 1 bed New | 975 | 1,270 | AED 1.24M |
| 13 Nov 2026 | 1 bed New | 738 | 1,711 | AED 1.26M |
| 9 Nov 2026 | Studio New | 435 | 1,778 | AED 773k |
| 3 Nov 2026 | 1 bed New | 942 | 1,300 | AED 1.22M |
Homes
149 homes by size
- Studio52%75 homes · 428–555 sq ft · 4 layouts
- 1 bed46%66 homes · 732–1,206 sq ft · 10 layouts
- 2 beds1%2 homes · 1,206 sq ft · 1 layout
- 3 beds1%2 homes · 1,915 sq ft · 1 layout
Location
Drive times
- Downtown Dubai35min
- Dubai Airport (DXB)48min
- Dubai Marina21min
By car. Jebel Ali Beach, the nearest beach, is 7.4 km away.
Rated schools
No rated schools within 5 km
Getting around
- Life PharmacyRed Line7 minwalk
- Al YalayisEtihad Rail9.1 kmaway
- Al Maktoum AirportHigh-speed rail · planned11 kmaway
- Al Maktoum InternationalDWC11 kmaway
Developer
- 4 being built, on time
- Escrow bank
- Not on record
- Legal name
- Imtiaz Ja Real Estate Development L.L.C
Also being built by Imtiaz Ja
| Project | Handover | Built |
|---|---|---|
| RAW DISTRICT 2 BY IMTIAZDowntown Jebel Ali | Q4 2029Being built | 0% |
| RAW DISTRICT BY IMTIAZ CRDowntown Jebel Ali | Q4 2029Being built | 0% |
| RAW DISTRICT BY IMTIAZ RDowntown Jebel Ali | Q4 2029Being built | 0% |
More questions about Raw District 2 Tower C by Imtiaz
Q4 2029, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 31 Aug 2026, with handover planned in 3 years.
149 homes on 10 floors: 75 studios of 428–555 sq ft, 66 1-bed flats of 732–1,206 sq ft, 2 2-bed flats of 1,206 sq ft and 2 3-bed flats of 1,915 sq ft.
About AED 45k a year for a studio, AED 60k for a 1-bed, AED 90k for a 2-bed and AED 95k for a 3-bed in Downtown Jebel Ali, a gross yield of about 7.8% Estimate.
Of Imtiaz Ja’s 4 projects on DLD’s record, 0 are finished. Of the 4 being built, none is past its planned date.
In Downtown Jebel Ali, 35 minutes by car to Downtown Dubai and 48 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is a 7-minute walk.
More nearby
Off-plan nearby
- Azizi RoseFrom AED 616k0% built · Planned Q3 2028
- Samana Business HubNo sales1% built · Planned Q3 2029
- Azizi NouraFrom AED 588k2% built · Planned Q3 2028
- Portside by Samana DevelopersFrom AED 1.15M0% built · Planned Q2 2029
- Azizi LinaFrom AED 587k2% built · Planned Q3 2028
- Peace Avenue by Peace HomesFrom AED 500k4% built · Planned Q1 2029
Finished buildings nearby
Typical next door AED 1,098/sq ft · 2 buildings within a 10-minute walk
