Skip to content

Raw District 2 Tower C by Imtiaz

Downtown Jebel AliImtiaz Ja

Raw District 2 Tower C by Imtiaz is an off-plan project by Imtiaz Ja in Downtown Jebel Ali, with 149 homes on 10 floors. DLD’s last inspection, on 31 Aug 2026, found it 0% built.

Built
0%
Handover
Q4 2029
Sales in 12 months
No sales
Homes
149

Progress

0%built
  1. Aug 2026Last inspection · 0%
  2. Q4 2026Building started
  3. Q4 2029Planned handover

Prices

Latest sales

No sales in 12 months, plus 6 newer sales, newest first
0 off-plan sales · Nov 2025 – Oct 2026, plus 6 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
18 Nov 20263 beds New1,9151,201AED 2.3M
13 Nov 20261 bed New7321,680AED 1.23M
13 Nov 20261 bed New9751,270AED 1.24M
13 Nov 20261 bed New7381,711AED 1.26M
9 Nov 2026Studio New4351,778AED 773k
3 Nov 20261 bed New9421,300AED 1.22M

Homes

149 homes by size

  • Studio52%75 homes · 428–555 sq ft · 4 layouts
  • 1 bed46%66 homes · 732–1,206 sq ft · 10 layouts
  • 2 beds1%2 homes · 1,206 sq ft · 1 layout
  • 3 beds1%2 homes · 1,915 sq ft · 1 layout

Location

Drive times

  • Downtown Dubai35min
  • Dubai Airport (DXB)48min
  • Dubai Marina21min

By car. Jebel Ali Beach, the nearest beach, is 7.4 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Life PharmacyRed Line7 minwalk
  • Al YalayisEtihad Rail9.1 kmaway
  • Al Maktoum AirportHigh-speed rail · planned11 kmaway
  • Al Maktoum InternationalDWC11 kmaway
Area guideDowntown Jebel AliFinished homesAED 1,287/sq ft1-bed rentAED 60k/yrGross yieldEstimate7.8%

Developer

  • 4 being built, on time
Escrow bank
Not on record
Legal name
Imtiaz Ja Real Estate Development L.L.C

Also being built by Imtiaz Ja

Imtiaz Ja’s other projects
ProjectHandoverBuilt
RAW DISTRICT 2 BY IMTIAZDowntown Jebel AliQ4 2029Being built0%
RAW DISTRICT BY IMTIAZ CRDowntown Jebel AliQ4 2029Being built0%
RAW DISTRICT BY IMTIAZ RDowntown Jebel AliQ4 2029Being built0%
All 4 Imtiaz Ja projects
Questions

More questions about Raw District 2 Tower C by Imtiaz

Q4 2029, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 31 Aug 2026, with handover planned in 3 years.

149 homes on 10 floors: 75 studios of 428–555 sq ft, 66 1-bed flats of 732–1,206 sq ft, 2 2-bed flats of 1,206 sq ft and 2 3-bed flats of 1,915 sq ft.

About AED 45k a year for a studio, AED 60k for a 1-bed, AED 90k for a 2-bed and AED 95k for a 3-bed in Downtown Jebel Ali, a gross yield of about 7.8% Estimate.

Of Imtiaz Ja’s 4 projects on DLD’s record, 0 are finished. Of the 4 being built, none is past its planned date.

In Downtown Jebel Ali, 35 minutes by car to Downtown Dubai and 48 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is a 7-minute walk.

More nearby

How the numbers work