Raw District by Imtiaz R

Downtown Jebel AliImtiaz Ja

Raw District by Imtiaz R is an off-plan project by Imtiaz Ja in Downtown Jebel Ali, with 674 homes on 15 floors. DLD’s last inspection, on 8 Jun 2026, found it 0% built.

Built
0%
Handover
Q4 2029
Sales in 12 months
No sales
Homes
674

Progress

0%built
  1. Jun 2026Last inspection · 0%
  2. Q4 2026Building started
  3. Q4 2029Planned handover

DLD updates % built after each inspection, so work on site can be further along than this figure.

Prices

Price per sq ft

1,758 AED/sq ft617 sales in 12 months

Typical price by size

Studio
AED 713k390 sq ft · 1,797 AED/sq ft · 359 sales
1 bed
AED 1.19M715 sq ft · 1,667 AED/sq ft · 160 sales
2 beds
AED 1.66M1,133 sq ft · 1,468 AED/sq ft · 30 sales
3 beds
AED 1.95M1,525 sq ft · 1,253 AED/sq ft · 9 sales

Against 11 Downtown Jebel Ali off-plan projects with 10 or more sales

  • Lowest1,134AED/sq ft
  • Typical1,712AED/sq ft
  • Raw District by Imtiaz R1,758AED/sq ft
  • Highest1,774AED/sq ft

3rd highest of 11 · AED per sq ft in 12 months

Latest sales

No sales in 12 months, plus 5 newer sales, newest first
0 off-plan sales · Nov 2025 – Oct 2026, plus 5 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
13 Nov 2026Studio New3881,730AED 671k
9 Nov 2026Studio New3901,741AED 679k
9 Nov 2026Studio New3901,780AED 694k
4 Nov 2026Studio New3901,815AED 708k
4 Nov 2026Studio New3881,931AED 749k
Oct 2026 · 26 sales
30 Oct 2026Studio3881,702AED 660k
29 Oct 2026Studio3991,858AED 741k
28 Oct 2026Studio3901,816AED 708k
28 Oct 20261 bed8361,399AED 1.17M
28 Oct 2026Studio3991,805AED 720k
28 Oct 2026Studio3901,946AED 759k
27 Oct 20261 bed6371,570AED 1M
26 Oct 20261 bed6251,977AED 1.24M
23 Oct 20261 bed7691,657AED 1.27M
23 Oct 20261 bed9771,327AED 1.3M
19 Oct 20261 bed7061,395AED 985k
19 Oct 20261 bed7151,799AED 1.29M
15 Oct 2026Studio5561,258AED 700k
14 Oct 2026Studio3851,771AED 682k
14 Oct 20261 bed6051,213AED 734k
13 Oct 2026Studio4481,612AED 722k
12 Oct 20261 bed7691,699AED 1.31M
12 Oct 20261 bed7181,622AED 1.16M
8 Oct 2026Studio3901,881AED 733k
7 Oct 2026Studio3901,947AED 759k
5 Oct 20261 bed6371,836AED 1.17M
2 Oct 2026Studio3901,802AED 703k
1 Oct 2026Studio4451,519AED 676k
1 Oct 2026Studio3941,727AED 680k
1 Oct 20261 bed6391,571AED 1M
1 Oct 20261 bed6321,854AED 1.17M
Sep 2026 · 43 sales
29 Sep 20261 bed7151,636AED 1.17M
29 Sep 2026Studio3901,779AED 694k
29 Sep 2026Studio3901,742AED 679k
29 Sep 20262 beds1,1331,538AED 1.74M
25 Sep 2026Studio3941,826AED 719k
25 Sep 20261 bed6442,010AED 1.29M
25 Sep 20261 bed6251,908AED 1.19M
25 Sep 2026Studio3901,815AED 708k
25 Sep 2026Studio3911,810AED 708k
23 Sep 2026Studio4061,852AED 752k
22 Sep 2026Studio3881,762AED 684k
22 Sep 2026Studio3881,738AED 674k
22 Sep 2026Studio3901,826AED 712k
22 Sep 2026Studio3881,756AED 681k
21 Sep 20261 bed7171,761AED 1.26M
21 Sep 2026Studio3901,879AED 733k
21 Sep 20261 bed7181,840AED 1.32M
21 Sep 2026Studio3901,832AED 715k
21 Sep 20261 bed7181,657AED 1.19M

Homes

674 homes by size

  • Studio61%398 homes · 388–1,127 sq ft · 16 layouts
  • 1 bed30%198 homes · 569–1,294 sq ft · 16 layouts
  • 2 beds7%45 homes · 1,108–1,478 sq ft · 5 layouts
  • 3 beds2%13 homes · 1,507–1,960 sq ft · 4 layouts

Location

Drive times

  • Downtown Dubai34min
  • Dubai Airport (DXB)47min
  • Dubai Marina20min

By car. Jebel Ali Beach, the nearest beach, is 7.5 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Life PharmacyRed Line2 minwalk
  • Al YalayisEtihad Rail8.8 kmaway
  • Al Maktoum AirportHigh-speed rail · planned11 kmaway
  • Al Maktoum InternationalDWC11 kmaway
Area guideDowntown Jebel AliFinished homesAED 1,287/sq ft1-bed rentAED 60k/yrGross yieldEstimate7.8%

Developer

  • 4 being built, on time
Escrow bank
Not on record
Legal name
Imtiaz Ja Real Estate Development L.L.C

Also being built by Imtiaz Ja

Imtiaz Ja’s other projects
ProjectHandoverBuilt
RAW DISTRICT 2 BY IMTIAZDowntown Jebel AliQ4 2029Being built0%
RAW DISTRICT 2 TOWER C BY IMTIAZDowntown Jebel AliQ4 2029Being built0%
RAW DISTRICT BY IMTIAZ CRDowntown Jebel AliQ4 2029Being built0%
All 4 Imtiaz Ja projects
Questions

More questions about Raw District by Imtiaz R

Q4 2029, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 8 Jun 2026, with handover planned in 3 years.

674 homes on 15 floors: 398 studios of 388–1,127 sq ft, 198 1-bed flats of 569–1,294 sq ft, 45 2-bed flats of 1,108–1,478 sq ft and 13 3-bed flats of 1,507–1,960 sq ft.

About AED 45k a year for a studio, AED 60k for a 1-bed, AED 90k for a 2-bed and AED 95k for a 3-bed in Downtown Jebel Ali, a gross yield of about 7.8% Estimate.

Of Imtiaz Ja’s 4 projects on DLD’s record, 0 are finished. Of the 4 being built, none is past its planned date.

In Downtown Jebel Ali, 34 minutes by car to Downtown Dubai and 47 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is a 2-minute walk.

More nearby

How the numbers work