Raw District by Imtiaz CR

Downtown Jebel AliImtiaz Ja

Raw District by Imtiaz CR is an off-plan project by Imtiaz Ja in Downtown Jebel Ali, with 614 homes on 15 floors. DLD’s last inspection, on 8 Jun 2026, found it 0% built.

Built
0%
Handover
Q4 2029
Sales in 12 months
No sales
Homes
614

Progress

0%built
  1. Jun 2026Last inspection · 0%
  2. Q4 2026Building started
  3. Q4 2029Planned handover

DLD updates % built after each inspection, so work on site can be further along than this figure.

Prices

Price per sq ft

1,767 AED/sq ft384 sales in 12 months

Typical price by size

Studio
AED 703k390 sq ft · 1,788 AED/sq ft · 238 sales
1 bed
AED 1.16M701 sq ft · 1,692 AED/sq ft · 76 sales
2 beds
AED 1.67M965 sq ft · 1,663 AED/sq ft · 38 sales
3 beds
AED 1.95M1,460 sq ft · 1,333 AED/sq ft · 6 sales

Against 11 Downtown Jebel Ali off-plan projects with 10 or more sales

  • Lowest1,134AED/sq ft
  • Typical1,712AED/sq ft
  • Raw District by Imtiaz CR1,767AED/sq ft
  • Highest1,774AED/sq ft

2nd highest of 11 · AED per sq ft in 12 months

Latest sales

No sales in 12 months, plus 2 newer sales, newest first
0 off-plan sales · Nov 2025 – Oct 2026, plus 2 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
18 Nov 2026Studio New3901,838AED 717k
4 Nov 2026Studio New3901,770AED 690k
Oct 2026 · 14 sales
28 Oct 2026Studio4491,550AED 696k
27 Oct 20262 beds9651,632AED 1.57M
27 Oct 2026Studio3901,803AED 703k
26 Oct 20261 bed6381,760AED 1.12M
26 Oct 2026Studio3881,878AED 729k
14 Oct 20261 bed8841,380AED 1.22M
14 Oct 20261 bed6381,735AED 1.11M
12 Oct 20262 beds9651,673AED 1.61M
6 Oct 2026Studio3901,699AED 663k
2 Oct 2026Studio3981,927AED 767k
2 Oct 20262 beds9651,848AED 1.78M
2 Oct 2026Studio3901,770AED 690k
1 Oct 2026Studio3901,785AED 696k
1 Oct 2026Studio3901,818AED 709k
Sep 2026 · 19 sales
29 Sep 2026Studio3981,789AED 712k
29 Sep 20261 bed8841,379AED 1.22M
25 Sep 20261 bed6601,731AED 1.14M
25 Sep 2026Studio3981,891AED 752k
23 Sep 2026Studio3901,770AED 690k
21 Sep 20262 beds1,1341,564AED 1.77M
14 Sep 20261 bed7611,599AED 1.22M
14 Sep 2026Studio3881,851AED 718k
9 Sep 2026Studio3901,794AED 700k
9 Sep 2026Studio3901,803AED 703k
9 Sep 2026Studio3901,803AED 703k
2 Sep 20261 bed6371,700AED 1.08M
2 Sep 2026Studio3901,779AED 694k
2 Sep 2026Studio4571,551AED 709k
2 Sep 20262 beds9651,761AED 1.7M
2 Sep 20261 bed6381,700AED 1.08M
2 Sep 2026Studio3901,803AED 703k
1 Sep 2026Studio4511,600AED 722k
1 Sep 2026Studio3901,915AED 747k
Aug 2026 · 191 sales
27 Aug 20261 bed6251,709AED 1.07M
25 Aug 2026Studio3981,852AED 737k
25 Aug 2026Studio4591,657AED 760k
25 Aug 2026Studio4541,594AED 724k
25 Aug 20261 bed6511,758AED 1.14M
20 Aug 2026Studio3901,776AED 693k
18 Aug 2026Studio3901,770AED 690k
18 Aug 20261 bed8841,423AED 1.26M
17 Aug 2026Studio3991,769AED 706k
14 Aug 2026Studio4531,578AED 715k
14 Aug 2026Studio3881,769AED 686k
14 Aug 2026Studio3901,785AED 696k
14 Aug 2026Studio3901,794AED 700k
14 Aug 2026Studio4591,608AED 738k
14 Aug 2026Studio4491,561AED 701k

Homes

614 homes by size

  • Studio63%252 homes · 390–516 sq ft · 10 layouts
  • 1 bed25%100 homes · 625–1,318 sq ft · 19 layouts
  • 2 beds10%41 homes · 965–1,184 sq ft · 5 layouts
  • 3 beds2%8 homes · 1,460 sq ft · 1 layout

Location

Drive times

  • Downtown Dubai34min
  • Dubai Airport (DXB)47min
  • Dubai Marina20min

By car. Jebel Ali Beach, the nearest beach, is 7.4 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Life PharmacyRed Line1 minwalk
  • Al YalayisEtihad Rail8.9 kmaway
  • Al Maktoum AirportHigh-speed rail · planned11 kmaway
  • Al Maktoum InternationalDWC11 kmaway
Area guideDowntown Jebel AliFinished homesAED 1,287/sq ft1-bed rentAED 60k/yrGross yieldEstimate7.8%

Developer

  • 4 being built, on time
Escrow bank
Not on record
Legal name
Imtiaz Ja Real Estate Development L.L.C

Also being built by Imtiaz Ja

Imtiaz Ja’s other projects
ProjectHandoverBuilt
RAW DISTRICT 2 BY IMTIAZDowntown Jebel AliQ4 2029Being built0%
RAW DISTRICT 2 TOWER C BY IMTIAZDowntown Jebel AliQ4 2029Being built0%
RAW DISTRICT BY IMTIAZ RDowntown Jebel AliQ4 2029Being built0%
All 4 Imtiaz Ja projects
Questions

More questions about Raw District by Imtiaz CR

Q4 2029, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 8 Jun 2026, with handover planned in 3 years.

614 homes on 15 floors: 252 studios of 390–516 sq ft, 100 1-bed flats of 625–1,318 sq ft, 41 2-bed flats of 965–1,184 sq ft and 8 3-bed flats of 1,460 sq ft.

About AED 45k a year for a studio, AED 60k for a 1-bed, AED 90k for a 2-bed and AED 95k for a 3-bed in Downtown Jebel Ali, a gross yield of about 7.8% Estimate.

Of Imtiaz Ja’s 4 projects on DLD’s record, 0 are finished. Of the 4 being built, none is past its planned date.

In Downtown Jebel Ali, 34 minutes by car to Downtown Dubai and 47 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is a 1-minute walk.

More nearby

How the numbers work