Azizi Lina
Downtown Jebel AliAzizi
Azizi Lina is an off-plan project by Azizi in Downtown Jebel Ali, with 236 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 2% built.
- Built
- 2%
- Handover
- Q3 2028
- Sales in 12 months
- 174
- Homes
- 236
About
Home types
- Studio
- 1 bed
- 2 beds
- 3 beds
Shared facilities
- Swimming pools
- Retail spaces
- Parking
- Multipurpose hall
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 2%
- Q3 2028Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 587k327 sq ft · 1,784 AED/sq ft · 146 sales
- 1 bed
- AED 941k670 sq ft · 1,387 AED/sq ft · 22 sales
- 2 beds
- AED 1.32M889 sq ft · 1,480 AED/sq ft · 6 sales
Against 11 Downtown Jebel Ali off-plan projects with 10 or more sales
- Lowest1,134AED/sq ft
- Typical1,712AED/sq ft
- Azizi Lina1,755AED/sq ft
- Highest1,774AED/sq ft
4th highest of 11 · AED per sq ft in 12 months
Azizi’s own price starts at AED 572k. DLD’s AED 587k is the lowest typical price paid in the 12 months.
Latest sales
Plus 3 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 5 Nov 2026 | Studio New | 327 | 1,765 | AED 577k |
| 5 Nov 2026 | Studio New | 326 | 1,844 | AED 601k |
| 4 Nov 2026 | 1 bed New | 670 | 1,174 | AED 787k |
| Oct 2026 · 2 sales | ||||
| 27 Oct 2026 | 1 bed | 742 | 1,330 | AED 987k |
| 15 Oct 2026 | 1 bed | 661 | 1,433 | AED 947k |
| Sep 2026 · 20 sales | ||||
| 29 Sep 2026 | Studio | 490 | 1,160 | AED 568k |
| 28 Sep 2026 | Studio | 493 | 1,209 | AED 596k |
| 25 Sep 2026 | 1 bed | 670 | 1,197 | AED 802k |
| 21 Sep 2026 | Studio | 378 | 1,602 | AED 606k |
| 17 Sep 2026 | Studio | 494 | 1,324 | AED 654k |
| 14 Sep 2026 | Studio | 327 | 1,795 | AED 587k |
| 14 Sep 2026 | Studio | 327 | 1,768 | AED 578k |
| 14 Sep 2026 | Studio | 326 | 1,804 | AED 588k |
| 11 Sep 2026 | 1 bed | 656 | 1,458 | AED 957k |
| 11 Sep 2026 | Studio | 329 | 1,669 | AED 549k |
| 11 Sep 2026 | Studio | 329 | 1,684 | AED 554k |
| 11 Sep 2026 | Studio | 327 | 1,743 | AED 570k |
| 11 Sep 2026 | Studio | 327 | 1,771 | AED 579k |
| 11 Sep 2026 | 1 bed | 670 | 1,480 | AED 991k |
| 11 Sep 2026 | Studio | 327 | 1,807 | AED 591k |
| 11 Sep 2026 | 1 bed | 742 | 1,329 | AED 986k |
| 11 Sep 2026 | 1 bed | 670 | 1,375 | AED 921k |
| 11 Sep 2026 | Studio | 328 | 1,683 | AED 552k |
| 10 Sep 2026 | Studio | 326 | 1,779 | AED 580k |
| 10 Sep 2026 | Studio | 327 | 1,786 | AED 584k |
| Aug 2026 · 20 sales | ||||
| 26 Aug 2026 | Studio | 329 | 1,672 | AED 550k |
| 17 Aug 2026 | 1 bed | 670 | 1,594 | AED 1.07M |
| 13 Aug 2026 | Studio | 327 | 1,804 | AED 590k |
| 11 Aug 2026 | Studio | 328 | 1,854 | AED 608k |
| 7 Aug 2026 | Studio | 321 | 1,804 | AED 579k |
| 7 Aug 2026 | 1 bed | 670 | 1,299 | AED 870k |
| 7 Aug 2026 | Studio | 338 | 1,725 | AED 583k |
| 7 Aug 2026 | Studio | 328 | 1,838 | AED 603k |
| 6 Aug 2026 | Studio | 326 | 1,877 | AED 612k |
| 5 Aug 2026 | Studio | 326 | 1,867 | AED 609k |
| 5 Aug 2026 | 1 bed | 670 | 1,416 | AED 949k |
| 5 Aug 2026 | 2 beds | 889 | 1,466 | AED 1.3M |
| 5 Aug 2026 | Studio | 326 | 1,738 | AED 566k |
| 5 Aug 2026 | Studio | 327 | 1,844 | AED 603k |
| 5 Aug 2026 | Studio | 503 | 1,298 | AED 653k |
| 5 Aug 2026 | Studio | 326 | 1,819 | AED 593k |
| 4 Aug 2026 | Studio | 496 | 1,328 | AED 659k |
| 4 Aug 2026 | Studio | 340 | 1,755 | AED 597k |
| 3 Aug 2026 | Studio | 328 | 1,848 | AED 606k |
| 3 Aug 2026 | 1 bed | 670 | 1,410 | AED 945k |
| Jul 2026 · 47 sales | ||||
| 27 Jul 2026 | Studio | 322 | 1,783 | AED 574k |
| 22 Jul 2026 | Studio | 328 | 1,732 | AED 568k |
| 21 Jul 2026 | Studio | 378 | 1,632 | AED 617k |
| 17 Jul 2026 | Studio | 327 | 1,694 | AED 554k |
| 16 Jul 2026 | Studio | 329 | 1,649 | AED 543k |
Homes
236 homes by size
- Studio80%188 homes · 320–512 sq ft · 14 layouts
- 1 bed14%34 homes · 661–866 sq ft · 5 layouts
- 2 beds5%11 homes · 889–1,391 sq ft · 3 layouts
- 3 beds1%3 homes · 1,759 sq ft · 1 layout
Location
Drive times
- Downtown Dubai36min
- Dubai Airport (DXB)49min
- Dubai Marina22min
By car. Jebel Ali Beach, the nearest beach, is 7.3 km away.
Rated schools
No rated schools within 5 km
Getting around
- Life PharmacyRed Line12 minwalk
- Al YalayisEtihad Rail9.4 kmaway
- Al Maktoum AirportHigh-speed rail · planned11 kmaway
- Al Maktoum InternationalDWC11 kmaway
Developer
- 91 finished
- 47 being built, on time
- 10 past their planned date
- 2 not started
- Escrow bank
- Not on record
- Legal name
- Azizi Developments L.L.C
Also being built by Azizi
| Project | Handover | Built |
|---|---|---|
| Azizi GrandDubai Sports City | Q1 2025Past planned date | 82% |
| Azizi Riviera ReveAl Merkadh | Q1 2025Past planned date | 77% |
| Azizi Venice 5Dubai South | Q4 2025Past planned date | 63% |
| Azizi Venice 1Dubai South | Q4 2025Past planned date | 67% |
| Azizi Venice 2Dubai South | Q4 2025Past planned date | 57% |
More questions about Azizi Lina
From AED 587k for a 327 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 941k and 2-bed flats sell for about AED 1.32M.
Q3 2028, the planned date in DLD’s register.
It is not past its planned date. It was 2% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 22 months.
236 homes on 8 floors: 188 studios of 320–512 sq ft, 34 1-bed flats of 661–866 sq ft, 11 2-bed flats of 889–1,391 sq ft and 3 3-bed flats of 1,759 sq ft.
About AED 45k a year for a studio, AED 60k for a 1-bed, AED 90k for a 2-bed and AED 95k for a 3-bed in Downtown Jebel Ali, a gross yield of about 7.8% Estimate.
Of Azizi’s 150 projects on DLD’s record, 91 are finished. Of the 57 being built, 10 are past their planned date.
In Downtown Jebel Ali, 36 minutes by car to Downtown Dubai and 49 to Dubai Airport (DXB). Life Pharmacy Metro station on the Red Line is a 12-minute walk.
More nearby
Off-plan nearby
- Samana Downtown OneNo sales0% built · Planned Q4 2029
- Peace Avenue by Peace HomesFrom AED 500k4% built · Planned Q1 2029
- Azizi NouraFrom AED 588k2% built · Planned Q3 2028
- Azizi RoseFrom AED 616k0% built · Planned Q3 2028
- Azizi AbrahamNo sales2% built · Planned Q3 2027
- Raw District 2 Tower C by ImtiazNo sales0% built · Planned Q4 2029
Finished buildings nearby
Typical next door AED 761/sq ft · 1 building within a 10-minute walk
