Sobha Reserve
LiwanSobha
FromAED 7.7MDeveloper’s price
Sobha Reserve is an off-plan project by Sobha in Liwan. DLD’s last inspection, on 26 Oct 2026, found it 75% built.
- Built
- 75%
- Handover
- Not on record
- Sales in 12 months
- No sales
- Homes
- Not on record
About
Home types
- 4-bed villa
- 5-bed villa
- 6-bed villa
Shared facilities
- Botanical garden
- Clubhouse
- Zen garden and tea house
- Outdoor cinema
- Adventure play
- Beach volleyball
- Paddle tennis
- Outdoor gym
Progress
75%built
- Q4 2023Building started
- Oct 2026Last inspection · 75%
Location
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)26min
- Dubai Marina35min
By car. Kite Beach, the nearest beach, is 15.8 km away.
Rated schools
No rated schools within 5 km
Getting around
- Global VillageGold Line · opens 20323.8 kmaway
- MeydanEtihad Rail · planned8.6 kmaway
- ONPASSIVERed Line13 kmaway
- Al JaddafHigh-speed rail · planned15 kmaway
- Dubai InternationalDXB19 kmaway
Area guideLiwanFinished homesAED 851/sq ft1-bed rentAED 55k/yrGross yieldEstimate8.8%Developer
- 20 finished
- 24 being built, on time
- 1 not started
- Escrow bank
- Dubai Islamic Bank
- Legal name
- Sobha L.L.C
Also being built by Sobha
| Project | Handover | Built |
|---|---|---|
| Verde by SobhaJLT | Q2 2027Being built | 85% |
| Sobha EstatesBu Kadra | Q4 2027Being built | 68% |
| Sobha Seahaven Tower ADubai Marina | Q2 2028Being built | 37% |
| Elwood EstatesThe Valley | Q2 2028Being built | 14% |
| Sobha Seahaven Tower B & CDubai Marina | Q4 2028Being built | 40% |
More questions about Sobha Reserve
About AED 42k a year for a studio, AED 55k for a 1-bed, AED 78k for a 2-bed and AED 93k for a 3-bed in Liwan, a gross yield of about 8.8% Estimate.
Of Sobha’s 45 projects on DLD’s record, 20 are finished. Of the 24 being built, none is past its planned date.
In Liwan, 27 minutes by car to Downtown Dubai and 26 to Dubai Airport (DXB). ONPASSIVE Metro station on the Red Line is 13 km away.
More nearby
Off-plan nearby
- Belgravia GardensFrom AED 820k3% built · Planned Q3 2028
- Sakura Gardens by HreFrom AED 874k4% built · Planned Q2 2029
- Amana JewelsNo sales22% built · Past planned date
- Parkgreen Residences by AlishaanFrom AED 830k4% built · Planned Q2 2028
- Symbolic AltusFrom AED 1.03M1% built · Planned Q2 2027
- Confident PrestonNo sales0% built · Planned Q2 2028
