Skip to content

The Bristol Emaar Beachfront

Dubai HarbourEmaar

FromAED 3.66MDeveloper’s price

The Bristol Emaar Beachfront is an off-plan project by Emaar in Dubai Harbour, with 227 homes on 31 floors. DLD’s last inspection, on 26 Oct 2026, found it 6% built.

Built
6%
Handover
Q3 2029
Sales in 12 months
1
Homes
227

About

The Bristol is a 31-floor building of 227 homes in Dubai Marina, on Emaar Beachfront, beside a Bristol hotel. Homes run from 1-bed flats to 5-bed penthouses, with 2-bed flats the most common, all with floor-to-ceiling windows. Residents get private beach access, infinity pools with cabanas and a yoga deck.

  • Private beach access
  • Bristol hotel-branded homes
  • Floor-to-ceiling windows

Shared facilities

  • Private beach access
  • Infinity pools
  • Sunbeds and cabanas
  • Yoga deck

Progress

6%built
  1. Feb–Apr 2025Launch sales · 205
  2. Q2 2025Building started
  3. Oct 2026Last inspection · 6%
  4. Q3 2029Planned handover

Prices

Price per sq ft

Not enough sales

Typical price by size

2 beds
Not enough sales1 sale

Against 22 Dubai Marina off-plan projects with 10 or more sales

  • Lowest2,217AED/sq ft
  • Typical3,822AED/sq ft
  • The Bristol Emaar Beachfront4,916AED/sq ft
  • Highest5,087AED/sq ft

Latest sales

Newest first
1 off-plan sale · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2025 · 1 sale
20 Nov 20252 beds1,5414,916AED 7.58M

Homes

227 homes by size

  • 1 bed26%58 homes · 829–835 sq ft · 2 layouts
  • 2 beds44%100 homes · 1,470–1,546 sq ft · 3 layouts
  • 3 beds22%51 homes · 1,912–2,074 sq ft · 4 layouts
  • 4 beds6%14 homes · 2,501–2,611 sq ft · 2 layouts
  • 5 beds2%4 homes · 5,828–6,056 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai25min
  • Dubai Airport (DXB)38min

By car. JBR Beach, the nearest beach, is 2.7 km away.

Rated schools

  • Dubai CollegeUK · Outstanding2.7 kmaway
  • Regent International Private SchoolUK · Very good3.4 kmaway

Getting around

  • Media CityDubai Tram20 minwalk
  • Al Fardan ExchangeRed Line2.1 kmaway
  • Al YalayisEtihad Rail9.7 kmaway
  • Al Maktoum AirportHigh-speed rail · planned23 kmaway
  • Al Maktoum InternationalDWC23 kmaway
Area guideDubai MarinaFinished homesAED 1,989/sq ft1-bed rentAED 95k/yrGross yieldEstimate5.6%

Developer

  • 193 finished
  • 139 being built, on time
  • 3 past their planned date
Escrow bank
Abu Dhabi Commercial Bank
Legal name
Emaar Development P.J.S.C.

Also being built by Emaar

Emaar’s other projects
ProjectHandoverBuilt
MaysanTown SquareQ3 2016Past planned date37%
Teema 1 & Teema 2Al Yalayis 4Q3 2016Past planned date9%
Ocean StarDubai Maritime CityQ3 2025Past planned date30%
SeascapeDubai Maritime CityQ4 2026Being built79%
The St. Regis Residences, Downtown DubaiDowntown DubaiQ4 2026Being built76%
All 335 Emaar projects
Questions

More questions about The Bristol Emaar Beachfront

Q3 2029, the planned date in DLD’s register.

It is not past its planned date. It was 6% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.

227 homes on 31 floors: 58 1-bed flats of 829–835 sq ft, 100 2-bed flats of 1,470–1,546 sq ft, 51 3-bed flats of 1,912–2,074 sq ft, 14 4+ bed flats of 2,501–2,611 sq ft and 4 4+ bed flats of 5,828–6,056 sq ft.

About AED 95k a year for a 1-bed, AED 145k for a 2-bed, AED 215k for a 3-bed and AED 300k for a 4+ bed in Dubai Marina, a gross yield of about 5.6% Estimate.

Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.

In Dubai Harbour, Dubai Marina, 25 minutes by car to Downtown Dubai and 38 to Dubai Airport (DXB). Al Fardan Exchange Metro station on the Red Line is 2.1 km away.

More nearby

How the numbers work

FromAED 3.66MSee it on the map