The Langston
Business BayEllington
The Langston is an off-plan project by Ellington in Business Bay. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q4 2031
- Sales in 12 months
- No sales
- Homes
- Not on record
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 0%
- Q4 2031Planned handover
Location
Drive times
- Downtown Dubai10min
- Dubai Airport (DXB)26min
- Dubai Marina22min
By car. Mercato Beach, the nearest beach, is 3.2 km away.
Rated schools
- JSS Private SchoolIndian · Very good0.9 kmaway
- Jumeirah English Speaking SchoolUK · Outstanding2.2 kmaway
Getting around
- Business BayRed Line2 minwalk
- Burj Khalifa RoadGold Line · opens 203220 minwalk
- MeydanEtihad Rail · planned5.6 kmaway
- Al JaddafHigh-speed rail · planned8.2 kmaway
- Dubai InternationalDXB12 kmaway
Area guideBusiness BayFinished homesAED 1,866/sq ft1-bed rentAED 90k/yrGross yieldEstimate6.5%Developer
- 18 finished
- 25 being built, on time
- 7 past their planned date
- 1 not started
- Escrow bank
- Not on record
- Legal name
- E L P G Real Estate Development L.L.C
Also being built by Ellington
| Project | Handover | Built |
|---|---|---|
| The PortmanJVC | Q3 2025Past planned date | 79% |
| UH West BY EllingtonJLT | Q1 2026Past planned date | 71% |
| UH East BY EllingtonJLT | Q1 2026Past planned date | 47% |
| The QuaysideBusiness Bay | Q1 2026Past planned date | 55% |
| The Waterside Villas BY EllingtonMajan | Q2 2026Past planned date | 32% |
More questions about The Langston
Q4 2031, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 5 years.
About AED 65k a year for a studio, AED 90k for a 1-bed, AED 135k for a 2-bed, AED 185k for a 3-bed and AED 328k for a 4+ bed in Business Bay, a gross yield of about 6.5% Estimate.
Of Ellington’s 51 projects on DLD’s record, 18 are finished. Of the 32 being built, 7 are past their planned date.
In Business Bay, 10 minutes by car to Downtown Dubai and 26 to Dubai Airport (DXB). Business Bay Metro station on the Red Line is a 2-minute walk.
More nearby
Off-plan nearby
- Avarra by PalaceFrom AED 2.81M0% built · Planned Q2 2031
- Lumena by OmniyatNo sales0% built · Planned Q4 2029
- Lumena Alta by OmniyatNo sales0% built · Planned Q2 2031
- Bayz 101 by DanubeFrom AED 1.28M10% built · Handover not on record
- Downtown ResidencesFrom AED 2.39M1% built · Planned Q4 2030
- Bayz 102 by DanubeFrom AED 1.65M7% built · Planned Q4 2029
Finished buildings nearby
Typical next door AED 1,833/sq ft · 8 buildings within a 10-minute walk
- West Heights 31,612AED/sq ftNot enough rents · 10-minute walk
- Ontario Tower1,281AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- Paramount Tower Hotel & Residences2,053AED/sq ft1-bed rent AED 110k/yr · 10-minute walk
- Executive Bay B1,419AED/sq ft1-bed rent AED 73k/yr · 10-minute walk
- The Opus by Omniyat4,229AED/sq ft1-bed rent AED 168k/yr · 10-minute walk
- Merano Tower1,557AED/sq ft1-bed rent AED 74k/yr · 10-minute walk
- Ahad Residences2,289AED/sq ft1-bed rent AED 120k/yr · 10-minute walk
- Zada Tower2,102AED/sq ft1-bed rent AED 70k/yr · 10-minute walk
- Peninsula Three2,672AED/sq ft1-bed rent AED 100k/yr
- DAMAC Towers by Paramount1,412AED/sq ft1-bed rent AED 95k/yr
- Prive by DAMAC2,218AED/sq ft1-bed rent AED 100k/yr
- Al Habtoor City1,838AED/sq ft1-bed rent AED 102k/yr
