The Palm Crown
Palm JumeirahNakheel
The Palm Crown is an off-plan project by Nakheel in Palm Jumeirah. DLD’s last inspection, on 26 Oct 2026, found it 11% built.
- Built
- 11%
- Handover
- Q3 2027
- Sales in 12 months
- No sales
- Homes
- Not on record
Progress
- Q3 2024Building started
- Oct 2026Last inspection · 11%
- Q3 2027Planned handover
Location
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)40min
- Dubai Marina16min
By car. JBR Beach, the nearest beach, is 5.0 km away.
Rated schools
- Dubai CollegeUK · Outstanding4.9 kmaway
Getting around
- Al Fardan ExchangeRed Line5.3 kmaway
- Al YalayisEtihad Rail13 kmaway
- Al JaddafHigh-speed rail · planned24 kmaway
- Al Maktoum InternationalDWC26 kmaway
Area guidePalm JumeirahFinished homesAED 2,737/sq ft1-bed rentAED 150k/yrGross yieldEstimate4.8%Developer
- 12 finished
- 34 being built, on time
- 3 past their planned date
- Escrow bank
- Dubai Islamic Bank
- Legal name
- The Pointe L.L.C
Also being built by Nakheel
| Project | Handover | Built |
|---|---|---|
| International City Lake DistrictInternational City Phase 1 | Q4 2012Past planned date | 0% |
| Jumeirah Heights FrondsJLT | Q1 2013Past planned date | 32% |
| Bay Residences Dubai IslandsDubai Islands | Q4 2026Past planned date | 48% |
| Palm Beach Towers - 2Palm Jumeirah | Q4 2026Being built | 82% |
| Palm Beach Towers 1Palm Jumeirah | Q4 2026Being built | 83% |
More questions about The Palm Crown
Q3 2027, the planned date in DLD’s register.
It is not past its planned date. It was 11% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 10 months.
About AED 90k a year for a studio, AED 150k for a 1-bed, AED 210k for a 2-bed, AED 300k for a 3-bed and AED 675k for a 4+ bed in Palm Jumeirah, a gross yield of about 4.8% Estimate.
Of Nakheel’s 49 projects on DLD’s record, 12 are finished. Of the 37 being built, 3 are past their planned date.
In Palm Jumeirah, 27 minutes by car to Downtown Dubai and 40 to Dubai Airport (DXB). Al Fardan Exchange Metro station on the Red Line is 5.3 km away.
More nearby
Off-plan nearby
- Orla by OmniyatFrom AED 38M70% built · Planned Q4 2026
- Orla Infinity by OmniyatFrom AED 70.59M61% built · Handover not on record
- Passo by BeyondFrom AED 4.95M0% built · Planned Q4 2029
- The Alba Residences by OmniyatFrom AED 18.14M8% built · Planned Q1 2028
- Vitalia by PinnacleFrom AED 9.05M21% built · Past planned date
- SLS Residences at Palm JumeirahNo sales72% built · Past planned date