International City Lake District is an off-plan project by Nakheel in International City Phase 1, with 2,314 homes. DLD’s last inspection found it 0% built.

Built
0%
Handover
Q4 2012
Sales in 12 months
No sales
Homes
2,314

Progress

0%built
  1. Q3 2010Building started
  2. Q4 2012Planned handover · passed
  3. Jun 2026Last inspection · 0%

DLD updates % built after each inspection, so work on site can be further along than this figure.

167 months past the planned date

Location

Drive times

  • Downtown Dubai25min
  • Dubai Airport (DXB)24min
  • Dubai Marina37min

By car. La Mer Beach, the nearest beach, is 16.3 km away.

Rated schools

  • Sharjah American International Private School - DubaiAmerican · Good2.3 kmaway
  • Primus Private SchoolIndian · Good2.4 kmaway

Getting around

  • International City 1Blue Line · opens 202915 minwalk
  • CentrepointRed Line7.3 kmaway
  • Al JaddafHigh-speed rail · planned9.6 kmaway
  • MeydanEtihad Rail · planned10 kmaway
  • Dubai InternationalDXB10 kmaway
Area guideInternational City Phase 1Finished homesAED 658/sq ft1-bed rentAED 43k/yrGross yieldEstimate9.5%

Developer

  • 12 finished
  • 34 being built, on time
  • 3 past their planned date
Escrow bank
Mashreq Bank
Legal name
International City ( L.L.C )

Also being built by Nakheel

Nakheel’s other projects
ProjectHandoverBuilt
Jumeirah Heights FrondsJLTQ1 2013Past planned date32%
Bay Residences Dubai IslandsDubai IslandsQ4 2026Past planned date48%
Palm Beach Towers - 2Palm JumeirahQ4 2026Being built82%
Palm Beach Towers 1Palm JumeirahQ4 2026Being built83%
Palm Beach Towers 3Palm JumeirahQ4 2026Being built74%
All 49 Nakheel projects
Questions

More questions about International City Lake District

Q4 2012, the planned date in DLD’s register.

No. It is 14 years past its planned date, and was 0% built at DLD’s last inspection.

About AED 32k a year for a studio, AED 43k for a 1-bed, AED 60k for a 2-bed and AED 105k for a 3-bed in International City Phase 1, a gross yield of about 9.5% Estimate.

Of Nakheel’s 49 projects on DLD’s record, 12 are finished. Of the 37 being built, 3 are past their planned date.

In International City Phase 1, 25 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Centrepoint Metro station on the Red Line is 7.3 km away.