Skip to content

Longford Residences by Devan Real Estate Development

International City Phase 1Devan

FromAED 569kStudio · 466 sq ft

Longford Residences by Devan Real Estate Development is an off-plan project by Devan in International City Phase 1, with 264 homes on 4 floors. DLD’s last inspection, on 26 Oct 2026, found it 33% built.

Built
33%
Handover
Q2 2028
Sales in 12 months
174
Homes
264

Progress

33%built
  1. Q2 2025Building started
  2. Oct 2026Last inspection · 33%
  3. Q2 2028Planned handover

Prices

Price per sq ft

1,072 AED/sq ft174 sales in 12 months

Typical price by size

Studio
AED 569k466 sq ft · 1,184 AED/sq ft · 81 sales
1 bed
AED 854k810 sq ft · 1,047 AED/sq ft · 65 sales
2 beds
AED 1.28M1,387 sq ft · 943 AED/sq ft · 28 sales

Against 5 International City Phase 1 off-plan projects with 10 or more sales

  • Longford Residences by Devan Real Estate Development1,072AED/sq ft
  • Typical1,234AED/sq ft
  • Highest1,367AED/sq ft

Lowest of 5 · AED per sq ft in 12 months

Latest sales

Newest first
174 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 2 sales
20 Oct 20261 bed8101,066AED 864k
12 Oct 2026Studio4331,344AED 582k
Sep 2026 · 1 sale
11 Sep 20262 beds1,428917AED 1.31M
Jul 2026 · 6 sales
20 Jul 2026Studio4661,053AED 491k
20 Jul 2026Studio4661,053AED 491k
20 Jul 20262 beds3,871323AED 1.25M
10 Jul 20261 bed8101,072AED 868k
10 Jul 20262 beds1,387917AED 1.27M
9 Jul 2026Studio4661,344AED 626k
Jun 2026 · 2 sales
24 Jun 2026Studio4331,153AED 499k
18 Jun 2026Studio4661,288AED 600k
May 2026 · 20 sales
18 May 2026Studio4331,124AED 487k
11 May 20261 bed8111,127AED 914k
11 May 2026Studio4661,300AED 606k
7 May 20261 bed811996AED 808k
5 May 20262 beds1,269978AED 1.24M
4 May 20261 bed810986AED 799k
4 May 20262 beds1,269985AED 1.25M
4 May 20262 beds1,428826AED 1.18M
4 May 20261 bed8151,161AED 946k
4 May 2026Studio4661,124AED 524k
4 May 20261 bed8151,032AED 841k
4 May 2026Studio4331,290AED 558k
4 May 20261 bed8151,075AED 876k
4 May 20262 beds1,2691,079AED 1.37M
4 May 20262 beds1,2691,008AED 1.28M
1 May 2026Studio909701AED 637k
1 May 20261 bed8101,070AED 867k
1 May 20261 bed8101,072AED 868k
1 May 20261 bed8101,055AED 855k
1 May 20261 bed8111,054AED 855k
Apr 2026 · 63 sales
30 Apr 2026Studio4661,369AED 638k
30 Apr 2026Studio4331,343AED 582k
30 Apr 20261 bed8111,137AED 922k
29 Apr 2026Studio4661,369AED 638k
28 Apr 20261 bed8151,075AED 877k
28 Apr 2026Studio4661,145AED 533k
28 Apr 20261 bed810998AED 808k
28 Apr 20261 bed8101,072AED 868k
28 Apr 2026Studio1,433416AED 596k
28 Apr 20261 bed8101,022AED 828k
27 Apr 20261 bed8111,053AED 854k
27 Apr 2026Studio4661,161AED 541k
27 Apr 2026Studio4331,276AED 552k
27 Apr 2026Studio944622AED 587k
27 Apr 2026Studio1,436415AED 596k
27 Apr 20261 bed8101,084AED 878k
27 Apr 20262 beds1,387851AED 1.18M
27 Apr 20261 bed8101,072AED 868k
27 Apr 2026Studio4331,211AED 524k

Homes

264 homes by size

  • Studio45%120 homes · 433–1,475 sq ft · 7 layouts
  • 1 bed36%96 homes · 810–1,882 sq ft · 3 layouts
  • 2 beds18%48 homes · 1,269–3,849 sq ft · 8 layouts

Location

Drive times

  • Downtown Dubai25min
  • Dubai Airport (DXB)24min
  • Dubai Marina38min

By car. La Mer Beach, the nearest beach, is 16.0 km away.

Rated schools

  • Repton SchoolUK/IB (Y 13) · Outstanding2.5 kmaway
  • Sharjah American International Private School - DubaiAmerican · Good2.8 kmaway

Getting around

  • International City 1Blue Line · opens 202922 minwalk
  • CentrepointRed Line7.7 kmaway
  • MeydanEtihad Rail · planned9.5 kmaway
  • Al JaddafHigh-speed rail · planned9.5 kmaway
  • Dubai InternationalDXB11 kmaway
Area guideInternational City Phase 1Finished homesAED 658/sq ft1-bed rentAED 43k/yrGross yieldEstimate9.5%

Developer

Devan

  • 1 being built, on time
Escrow bank
Abu Dhabi Islamic Bank
Legal name
Devan Real Estate Development L.L.C
Questions

More questions about Longford Residences by Devan Real Estate Development

From AED 569k for a 466 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 854k and 2-bed flats sell for about AED 1.28M.

Q2 2028, the planned date in DLD’s register.

It is not past its planned date. It was 33% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 19 months.

264 homes on 4 floors: 120 studios of 433–1,475 sq ft, 96 1-bed flats of 810–1,882 sq ft and 48 2-bed flats of 1,269–3,849 sq ft.

About AED 32k a year for a studio, AED 43k for a 1-bed and AED 60k for a 2-bed in International City Phase 1, a gross yield of about 9.5% Estimate.

Of Devan’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.

In International City Phase 1, 25 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Centrepoint Metro station on the Red Line is 7.7 km away.

More nearby

How the numbers work

FromAED 569kSee it on the map