Orbit Residences by Jewel
International City Phase 1Jewel Development
Orbit Residences by Jewel is an off-plan project by Jewel Development in International City Phase 1, with 91 homes on 4 floors. Building has not started.
- Built
- 0%
- Handover
- Not on record
- Sales in 12 months
- No sales
- Homes
- 91
Progress
- Q3 2024Building started
- Jun 2026Last inspection · 0%
- Planned handover
DLD updates % built after each inspection, so work on site can be further along than this figure.
Homes
91 homes by size
- Studio68%62 homes · 360–765 sq ft · 11 layouts
- 1 bed20%18 homes · 468–1,053 sq ft · 7 layouts
- 2 beds12%11 homes · 841–1,477 sq ft · 8 layouts
Location
Drive times
- Downtown Dubai25min
- Dubai Airport (DXB)24min
- Dubai Marina37min
By car. La Mer Beach, the nearest beach, is 16.4 km away.
Rated schools
- Repton SchoolUK/IB (Y 13) · Outstanding2.7 kmaway
- Sharjah American International Private School - DubaiAmerican · Good2.9 kmaway
Getting around
- International City 1Blue Line · opens 202916 minwalk
- CentrepointRed Line7.9 kmaway
- MeydanEtihad Rail · planned9.9 kmaway
- Al JaddafHigh-speed rail · planned10.0 kmaway
- Dubai InternationalDXB11 kmaway
Developer
- 2 not started
- Escrow bank
- Emirates NBD Bank
- Legal name
- Jewel Development&Real Estate Investment L.L.C
More by Jewel Development
| Project | Handover | Built |
|---|---|---|
| Orbit Residences by Jewel 2International City Phase 2 and 3 | Q4 2025Not started | 80% |
More questions about Orbit Residences by Jewel
91 homes on 4 floors: 62 studios of 360–765 sq ft, 18 1-bed flats of 468–1,053 sq ft and 11 2-bed flats of 841–1,477 sq ft.
About AED 32k a year for a studio, AED 43k for a 1-bed and AED 60k for a 2-bed in International City Phase 1, a gross yield of about 9.5% Estimate.
Of Jewel Development’s 2 projects on DLD’s record, 0 are finished.
In International City Phase 1, 25 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Centrepoint Metro station on the Red Line is 7.9 km away.
More nearby
Off-plan nearby
- Longford Residences by Devan Real Estate DevelopmentFrom AED 569k33% built · Planned Q2 2028
- Tomorrow Commercial TowerNo sales70% built · Past planned date
- International City Lake DistrictNo sales0% built · Past planned date
- Lusin Residences by Ermax DevelopmentFrom AED 430k35% built · Past planned date
- 06 Life ResidencesNo sales0% built · Planned Q4 2028
- Ryze by AumFrom AED 571k0% built · Planned Q2 2028
Finished buildings nearby
Typical next door AED 622/sq ft · 1 building within a 10-minute walk