
Passo by Beyond
Palm JumeirahBeyond
Passo by Beyond is an off-plan project by Beyond in Palm Jumeirah, with 552 homes on 14 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q4 2029
- Since launch
- Up 2%1 bed price per sq ft
- Homes
- 552
About
Passo is two buildings of up to 14 floors with 552 homes on Palm Jumeirah, named Avita and Bella, beside the beach. Three in four homes are 2-bed and 3-bed flats, and some 1-bed and 2-bed homes have a private garden with a plunge pool. A sky terrace with plunge pools sits above landscaped gardens that lead to the beach.
- Two buildings, Avita and Bella
- Homes with garden plunge pools
- Sky terrace with plunge pools
Shared facilities
- Sky terrace
- Plunge pools
- Landscaped gardens
- Beach access
Progress
- Aug–Oct 2025Launch sales · 80
- Q4 2025Building started
- Oct 2026Last inspection · 0%
- Q4 2029Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 4.95M923 sq ft · 5,245 AED/sq ft · 45 sales
- 2 beds
- AED 8.26M1,374 sq ft · 5,433 AED/sq ft · 85 sales
- 3 beds
- AED 13.44M1,918 sq ft · 6,897 AED/sq ft · 61 sales
- 4 beds
- AED 21.92M2,894 sq ft · 7,765 AED/sq ft · 5 sales
- 5 beds
- Not enough sales2 sales
- 6 beds
- AED 90M12,388 sq ft · 7,265 AED/sq ft · 3 sales
Against 8 Palm Jumeirah off-plan projects with 10 or more sales
- Lowest3,289AED/sq ft
- Typical4,356AED/sq ft
- Passo by Beyond6,114AED/sq ft
- Highest9,123AED/sq ft
2nd highest of 8 · AED per sq ft in 12 months
Latest sales
Plus 3 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 6 Nov 2026 | 2 beds New | 1,333 | 5,080 | AED 6.77M |
| 6 Nov 2026 | 2 beds New | 1,662 | 5,433 | AED 9.03M |
| 6 Nov 2026 | 3 beds New | 1,826 | 7,075 | AED 12.92M |
| Oct 2026 · 4 sales | ||||
| 29 Oct 2026 | 1 bed | 877 | 4,633 | AED 4.06M |
| 23 Oct 2026 | 2 beds | 1,320 | 5,921 | AED 7.82M |
| 23 Oct 2026 | 2 beds | 1,372 | 6,021 | AED 8.26M |
| 12 Oct 2026 | 2 beds | 1,311 | 4,978 | AED 6.53M |
| Sep 2026 · 7 sales | ||||
| 29 Sep 2026 | 3 beds | 3,156 | 5,232 | AED 16.51M |
| 29 Sep 2026 | 2 beds | 1,464 | 7,007 | AED 10.26M |
| 25 Sep 2026 | 3 beds | 2,597 | 5,357 | AED 13.91M |
| 10 Sep 2026 | 2 beds | 1,283 | 5,083 | AED 6.52M |
| 7 Sep 2026 | 4+ beds | 2,816 | 7,783 | AED 21.92M |
| 4 Sep 2026 | 2 beds | 2,076 | 5,149 | AED 10.69M |
| 4 Sep 2026 | 3 beds | 1,881 | 6,851 | AED 12.89M |
| Aug 2026 · 4 sales | ||||
| 14 Aug 2026 | 2 beds | 1,354 | 7,013 | AED 9.5M |
| 14 Aug 2026 | 2 beds | 1,312 | 5,076 | AED 6.66M |
| 13 Aug 2026 | 2 beds | 1,329 | 5,081 | AED 6.75M |
| 10 Aug 2026 | 2 beds | 1,309 | 5,408 | AED 7.08M |
| Jul 2026 · 13 sales | ||||
| 28 Jul 2026 | 2 beds | 1,517 | 5,719 | AED 8.68M |
| 28 Jul 2026 | 2 beds | 1,358 | 7,222 | AED 9.81M |
| 28 Jul 2026 | 2 beds | 1,333 | 4,979 | AED 6.64M |
| 21 Jul 2026 | 3 beds | 1,929 | 7,092 | AED 13.68M |
| 14 Jul 2026 | 3 beds | 1,826 | 7,197 | AED 13.14M |
| 13 Jul 2026 | 2 beds | 1,442 | 4,676 | AED 6.74M |
| 13 Jul 2026 | 3 beds | 2,188 | 5,871 | AED 12.85M |
| 13 Jul 2026 | 2 beds | 1,367 | 5,831 | AED 7.97M |
| 13 Jul 2026 | 3 beds | 2,231 | 5,746 | AED 12.82M |
| 9 Jul 2026 | 2 beds | 1,444 | 5,089 | AED 7.35M |
| 3 Jul 2026 | 4+ beds | 12,388 | 7,265 | AED 90M |
| 2 Jul 2026 | 2 beds | 1,225 | 6,023 | AED 7.38M |
| 2 Jul 2026 | 2 beds | 1,292 | 4,739 | AED 6.12M |
| Jun 2026 · 14 sales | ||||
| 23 Jun 2026 | 2 beds | 1,267 | 5,000 | AED 6.34M |
| 22 Jun 2026 | 2 beds | 1,289 | 5,083 | AED 6.55M |
| 19 Jun 2026 | 3 beds | 2,461 | 6,870 | AED 16.91M |
| 19 Jun 2026 | 2 beds | 1,289 | 4,979 | AED 6.42M |
| 19 Jun 2026 | 1 bed | 890 | 6,528 | AED 5.81M |
| 11 Jun 2026 | 2 beds | 1,571 | 5,603 | AED 8.8M |
| 11 Jun 2026 | 2 beds | 1,748 | 4,659 | AED 8.14M |
| 11 Jun 2026 | 3 beds | 1,818 | 6,931 | AED 12.6M |
| 9 Jun 2026 | 1 bed | 840 | 5,734 | AED 4.82M |
| 9 Jun 2026 | 2 beds | 1,585 | 5,211 | AED 8.26M |
| 9 Jun 2026 | 3 beds | 1,820 | 6,555 | AED 11.93M |
| 9 Jun 2026 | 3 beds | 2,171 | 5,815 | AED 12.63M |
| 4 Jun 2026 | 2 beds | 1,412 | 6,562 | AED 9.27M |
| 4 Jun 2026 | 2 beds | 1,296 | 4,833 | AED 6.26M |
| May 2026 · 11 sales | ||||
| 25 May 2026 | 1 bed | 864 | 4,539 | AED 3.92M |
| 25 May 2026 | 2 beds | 1,311 | 4,953 | AED 6.49M |
| 21 May 2026 | 2 beds | 1,352 | 4,983 | AED 6.74M |
| 20 May 2026 | 3 beds | 1,840 | 7,348 | AED 13.52M |
| 19 May 2026 | 3 beds | 1,815 | 7,219 | AED 13.1M |
Homes
552 homes by size
- 1 bed21%115 homes · 834–1,548 sq ft · 27 layouts
- 2 beds44%242 homes · 1,225–2,945 sq ft · 48 layouts
- 3 beds32%175 homes · 1,727–4,028 sq ft · 40 layouts
- 4 beds2%10 homes · 2,816–7,346 sq ft · 6 layouts
- 5 beds1%3 homes · 7,789–7,871 sq ft · 2 layouts
- 6 beds1%7 homes · 4,502–12,546 sq ft · 3 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 4.95MLocation
Drive times
- Downtown Dubai32min
- Dubai Airport (DXB)45min
- Dubai Marina21min
By car. JBR Beach, the nearest beach, is 4.4 km away.
Rated schools
No rated schools within 5 km
Getting around
- SOBHA REALTYRed Line5.4 kmaway
- Al YalayisEtihad Rail12 kmaway
- Al Maktoum AirportHigh-speed rail · planned25 kmaway
- Al Maktoum InternationalDWC25 kmaway
Area guidePalm JumeirahFinished homesAED 2,737/sq ft1-bed rentAED 150k/yrGross yieldEstimate4.8%Developer
- 10 being built, on time
- 1 past their planned date
- Escrow bank
- Mashreq Bank
- Legal name
- Estate Grand Real Estate Development L.L.C
Also being built by Beyond
| Project | Handover | Built |
|---|---|---|
| Aria By BeyondDubai Maritime City | Q1 2026Past planned date | 85% |
| SariaDubai Maritime City | Q4 2027Being built | 31% |
| OriseDubai Maritime City | Q4 2027Being built | 18% |
| TaleaDubai Maritime City | Q2 2028Being built | 5% |
| The MuralDubai Maritime City | Q3 2028Being built | 17% |
More questions about Passo by Beyond
From AED 4.95M for a 923 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 8.26M, 3-bed flats sell for about AED 13.44M, 4+ bed flats sell for about AED 21.92M and 4+ bed flats sell for about AED 90M.
Q4 2029, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.
552 homes on 14 floors: 115 1-bed flats of 834–1,548 sq ft, 242 2-bed flats of 1,225–2,945 sq ft, 175 3-bed flats of 1,727–4,028 sq ft, 10 4+ bed flats of 2,816–7,346 sq ft, 3 4+ bed flats of 7,789–7,871 sq ft and 7 4+ bed flats of 4,502–12,546 sq ft.
Up 2% for 1-bed flats, per sq ft. Against the launch sales of Aug 2025 – Oct 2025: 2-bed flats down 6%, 3-bed flats up 3%, 4+ bed flats up 14%.
About AED 150k a year for a 1-bed, AED 210k for a 2-bed, AED 300k for a 3-bed and AED 675k for a 4+ bed in Palm Jumeirah, a gross yield of about 4.8% Estimate.
Of Beyond’s 11 projects on DLD’s record, 0 are finished. Of the 11 being built, 1 is past its planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 4.95M.
In Palm Jumeirah, 32 minutes by car to Downtown Dubai and 45 to Dubai Airport (DXB). SOBHA REALTY Metro station on the Red Line is 5.4 km away.
More nearby
Off-plan nearby
- Orla Infinity by OmniyatFrom AED 70.59M61% built · Handover not on record
- Orla by OmniyatFrom AED 38M70% built · Planned Q4 2026
- SLS Residences at Palm JumeirahNo sales72% built · Past planned date
- The Palm CrownNo sales11% built · Planned Q3 2027
- Olaia ResidencesFrom AED 4.67M14% built · Planned Q4 2027
- Della XNo sales0% built · Planned Q4 2028
Finished buildings nearby
Typical next door AED 2,359/sq ft · 3 buildings within a 10-minute walk
- The 83,872AED/sq ft1-bed rent AED 148k/yr · 10-minute walk
- Emerald Palace Kempinski2,176AED/sq ftNot enough rents · 10-minute walk
- Balqis Residence2,359AED/sq ftNot enough rents · 10-minute walk
- Marina Residence2,219AED/sq ftNot enough rents
- Seven Hotel and Apartments The Palm3,510AED/sq ft1-bed rent AED 120k/yr
- Golden Mile1,942AED/sq ft1-bed rent AED 128k/yr
- The Palm Tower4,302AED/sq ft1-bed rent AED 240k/yr