Orise
Dubai Maritime CityBeyond
Orise is an off-plan project by Beyond in Dubai Maritime City, with 530 homes on 45 floors. DLD’s last inspection, on 26 Oct 2026, found it 18% built.
- Built
- 18%
- Handover
- Q4 2027
- Sales in 12 months
- 4
- Homes
- 530
About
Orise is a 45-floor building of 530 homes in Dubai Maritime City, set along tree-lined walkways. Most homes are 1-bed and 2-bed flats, alongside chalets and penthouses and duplexes with roof terraces. A receptionist and round-the-clock security look after residents.
- Chalets and penthouses
- Duplexes with roof terraces
- Round-the-clock security
Shared facilities
- Lap pool
- Zen garden
- Pool deck and lounge
- Vitality hub
Progress
- Feb–Apr 2025Launch sales · 475
- Q1 2025Building started
- Oct 2026Last inspection · 18%
- Q4 2027Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- Not enough sales2 sales
- 2 beds
- Not enough sales2 sales
Against 29 Dubai Maritime City off-plan projects with 10 or more sales
- Lowest1,843AED/sq ft
- Typical2,800AED/sq ft
- Orise3,091AED/sq ft
- Highest5,056AED/sq ft
Latest sales
Plus 1 newer sale, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 4 Nov 2026 | 1 bed New | 827 | 2,680 | AED 2.22M |
| Sep 2026 · 1 sale | ||||
| 17 Sep 2026 | 2 beds | 2,024 | 2,686 | AED 5.44M |
| Aug 2026 · 1 sale | ||||
| 12 Aug 2026 | 2 beds | 1,350 | 2,902 | AED 3.92M |
| Jan 2026 · 1 sale | ||||
| 7 Jan 2026 | 1 bed | 767 | 3,279 | AED 2.52M |
| Nov 2025 · 1 sale | ||||
| 24 Nov 2025 | 1 bed | 766 | 3,590 | AED 2.75M |
Homes
530 homes by size
- 1 bed47%251 homes · 688–1,045 sq ft · 9 layouts
- 2 beds42%223 homes · 1,211–2,024 sq ft · 9 layouts
- 3 beds8%45 homes · 1,624–5,904 sq ft · 6 layouts
- 4 beds2%11 homes · 2,444–6,853 sq ft · 7 layouts
Location
Drive times
- Downtown Dubai19min
- Dubai Airport (DXB)26min
- Dubai Marina32min
By car. Pearl Jumeirah Beach, the nearest beach, is 3.4 km away.
Rated schools
- New Academy SchoolAmerican · Good3.2 kmaway
Getting around
- Al GhubaibaGreen Line2.5 kmaway
- Al JaddafHigh-speed rail · planned8.7 kmaway
- Dubai InternationalDXB10 kmaway
- MeydanEtihad Rail · planned13 kmaway
Area guideDubai Maritime CityFinished homesAED 2,151/sq ft1-bed rentAED 75k/yrGross yieldEstimate4.0%Developer
- 10 being built, on time
- 1 past their planned date
- Escrow bank
- Emirates NBD Bank
- Legal name
- Orise Residences Real Estate Development L.L.C
Also being built by Beyond
| Project | Handover | Built |
|---|---|---|
| Aria By BeyondDubai Maritime City | Q1 2026Past planned date | 85% |
| SariaDubai Maritime City | Q4 2027Being built | 31% |
| TaleaDubai Maritime City | Q2 2028Being built | 5% |
| The MuralDubai Maritime City | Q3 2028Being built | 17% |
| Kanyon By BeyondDubai Maritime City | Q3 2028Being built | 4% |
More questions about Orise
Q4 2027, the planned date in DLD’s register.
It is not past its planned date. It was 18% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.
530 homes on 45 floors: 251 1-bed flats of 688–1,045 sq ft, 223 2-bed flats of 1,211–2,024 sq ft, 45 3-bed flats of 1,624–5,904 sq ft and 11 4+ bed flats of 2,444–6,853 sq ft.
About AED 75k a year for a 1-bed, AED 110k for a 2-bed and AED 146k for a 3-bed in Dubai Maritime City, a gross yield of about 4.0% Estimate.
Of Beyond’s 11 projects on DLD’s record, 0 are finished. Of the 11 being built, 1 is past its planned date.
In Dubai Maritime City, 19 minutes by car to Downtown Dubai and 26 to Dubai Airport (DXB). Al Ghubaiba Metro station on the Green Line is 2.5 km away.
More nearby
Off-plan nearby
- SensiaNo sales18% built · Planned Q1 2029
- Prestige One ResidencesFrom AED 2.71M0% built · Planned Q4 2029
- Oceanz 1 by DanubeFrom AED 1.26M50% built · Handover not on record
- Oceanz 2 by DanubeFrom AED 1.22M42% built · Handover not on record
- Soulever' by BeyondFrom AED 3.09M2% built · Planned Q4 2028
- Oceanz 3 by DanubeFrom AED 1.93M21% built · Handover not on record
Finished buildings nearby
Typical next door AED 2,068/sq ft · 1 building within a 10-minute walk
