Skip to content

Dubai Maritime City

Dubaiمدينة دبي الملاحيةAlso known as Madinat Dubai Al Melaheyah

FromAED 1.15MStudio flat

Dubai Maritime City has 2 finished buildings and 47 off-plan projects. Flats sold for a typical AED 2,151 per sq ft in 12 months, 58% above Dubai.

Price per sq ft
2,151AED · ▲ 1.4% since Nov 2025
1-bed rent
75kAED a year
Gross yieldEstimate
4.0%Flats, every size
Buildings
258 finished-home sales
New homes due
15,80647 off-plan projects

About

DLD’s register lists 381 homes here, most of them 1-beds, then 2-beds. Of the 1 buildings with an opening year on record, 1 opened in 2019 or later. 98% of its flat sales in 12 months were off-plan.

  • Nearest Metro Al Ghubaiba · Green Line · 1.9 km
  • Best for rental income
  • Best for first homes
  • Watch out for lots of new supply

Prices

Price per sq ft

Typical price by size

Studio
AED 1.15M6 sales
1 bed
AED 1.73M13 sales
2 beds
AED 2.5M29 sales
3 beds
AED 5.19M9 sales
4+ beds
Not enough sales0 sales

Against all of Dubai

  • Dubai1,362AED/sq ft
  • Entry level here1,735AED/sq ft
  • Dubai Maritime City2,151AED/sq ft
  • High end here3,023AED/sq ft

14th priciest of 60 areas · finished flats, 12 months

Against next door

Rent

Rent by size

Studio
AED 65k/yr9 rents · yield 5.7%
1 bed
AED 75k/yr172 rents · yield 4.3%
2 beds
AED 110k/yr190 rents · yield 4.4%
3 beds
AED 146k/yr25 rents · yield 2.8%
4+ beds
Not enough rents1 rent

The 30th priciest 1-bed rent of 121 areas. 397 new rent contracts were signed here in 12 months. Gross yields are an Estimate. Rent in every Dubai area

Buildings

Every building

2 buildings · lowest price first, those with 10 or more sales first
Every building in Dubai Maritime City with sales, Nov 2025 – Oct 2026
BuildingAED/sq ftSalesGross yield
The Anwa by Omniyat 2,068 20 4.9%
Riva Residence 2,189 8 3.9%

381 homes by size

2 buildings
  • Studio8%30 homes
  • 1 bed39%147 homes
  • 2 beds36%138 homes
  • 3 beds17%65 homes
  • 4 beds1 home

Off-plan

Homes due
15,806
Projects
47
Past planned date
2

When the new homes are due

  • 2025154homes
  • 20261,440homes
  • 20271,192homes
  • 20284,044homes
  • 20294,781homes
  • 2030563homes
  • No planned date3,632homes

Past planned date

Every project

47 projects, most sold first
Off-plan projects in Dubai Maritime City
ProjectHandoverBuiltHomesFromSales
Breez by DanubeDanube Q2 2029 1% 1,188 AED 1.4MStudio 857
Franck Muller YachtingLondon Gate Q3 2028 0% 574 AED 1.35MStudio 566
Kanyon by BeyondBeyond Q3 2028 4% 411 AED 2.58M1 bed 339
Chelsea Residences 2 by DAMACDAMAC Q4 2029 5% 958 AED 2.64M1 bed 267
Soulever' by BeyondBeyond Q4 2028 2% 513 AED 3.09M1 bed 215
AureaEmaar Q2 2030 0% 169 AED 2.36M1 bed 158
Chelsea Residences by DAMACDAMAC Q4 2029 5% 703 AED 2.5M1 bed 148
Portside SquareEllington Q4 2029 0% 408 AED 1.31MStudio 74
Fior 1Emaar Q3 2030 0% 181 AED 2.26M1 bed 66
Oceanz 2 by DanubeDanube No planned date 42% 775 AED 1.22MStudio 64
TaleaBeyond Q2 2028 5% 354 AED 2.36M1 bed 63
Sera 2Emaar Q4 2029 1% 183 AED 2.15M1 bed 62
Prestige One ResidencesPrestige One Q4 2029 0% 214 AED 2.71M1 bed 47
Baystar by VidaEmaar Q4 2029 6% 319 AED 2.17M1 bed 38
Sera 1Emaar Q4 2029 0% 203 AED 2.16M1 bed 35
Mar CasaDeyaar Q4 2026 56% 580 AED 898kStudio 34
Liv MaritimeLIV Q4 2028 28% 255 AED 3.95M1 bed 28
The PierLMD Q4 2026 48% 278 AED 1.75M1 bed 28
SeascapeEmaar Q4 2026 79% 391 AED 1.55M1 bed 26
ClearpointEmaar No planned date 45% 477 AED 1.69M1 bed 22
Oceanz 1 by DanubeDanube No planned date 50% 530 AED 1.26MStudio 20
BaylineEmaar No planned date 61% 151 AED 1.65M1 bed 17
Ocean PointEmaar No planned date 27% 217 AED 1.77M1 bed 17
Aria by BeyondBeyond Q1 2026Past planned date 85% 191 AED 4.42M2 beds 16
IL VentoKora Q3 2029 1% 330 AED 2.57M1 bed 16
Nautica OneSelect Group No planned date 85% 328 AED 1.69M1 bed 14
Marina ViewsEmaar Q4 2028 7% 545 AED 1.75M1 bed 13
The MuralBeyond Q3 2028 17% 265 AED 2.64M1 bed 13
Harbour LightsDAMAC Q2 2027 64% 294 AED 1.55M1 bed 12
Oceanz 3 by DanubeDanube No planned date 21% 386 AED 1.93M1 bed 8
SariaBeyond Q4 2027 31% 368 AED 1.82M1 bed 8
Ocean CoveEmaar Q3 2028 18% 233 AED 1.79M1 bed 7
Ocean StarEmaar Q3 2025Past planned date 30% 154 AED 3.64M3 beds 6
AvonleaEmaar No planned date 64% 161 AED 1.65M1 bed 5
Nautica TwoSelect Group No planned date 85% 328 AED 1.67M1 bed 5
Coral ReefDAMAC No planned date 33% 279 AED 2M1 bed 4
Marina Place 2Emaar Q4 2028 2% 179 AED 3.89M2 beds 4
OriseBeyond Q4 2027 18% 530 Not enough sales 4
Porto ViewEmaar Q4 2028 6% 114 Not enough sales 2
Marina Place 1Emaar Q4 2028 4% 162 Not enough sales 1
Pier Point 1Emaar Q4 2028 8% 122 Not enough sales 1
SensiaBeyond Q1 2029 18% 275 Not enough sales 1
31 Above by BeyondBeyond Q4 2028 1% 118 No sales No sales
Fior 2Emaar Q3 2030 0% 213 No sales No sales
Kamellia by BeyondDmc 5 Elit Q3 2029 0% – No sales No sales
Ocean ViewsEmaar Q3 2028 6% 78 No sales No sales
Pier Point 2Emaar Q4 2028 8% 121 No sales No sales

Location

Drive times

  • Downtown Dubai19min
  • Dubai Airport (DXB)26min
  • Dubai Marina32min

By car. Pearl Jumeirah Beach, the nearest beach, is 3.1 km away.

Rated schools

  • New Academy SchoolAmerican · Good2.5 kmaway

Getting around

  • Al GhubaibaGreen Line31 minwalk
  • Al Mina StreetGold Line · opens 20322.7 kmaway
  • Al JaddafHigh-speed rail · planned8.1 kmaway
  • Dubai InternationalDXB9.6 kmaway
  • MeydanEtihad Rail · planned13 kmaway

Getting to work

Travel times from Dubai Maritime City at 8am on a weekday, with Nol each month
ToCarMetro and busNol
DIFC17 min1 hr 43 min–
Dubai Media City29 min––
Downtown Dubai19 min––
Dubai International Airport (DXB)26 min––
Jebel Ali Free Zone38 min––
Dubai Internet City28 min––
Dubai Knowledge Park30 min––
Dubai Airport Free Zone26 min––
Dubai Healthcare City16 min1 hr 49 min–

See every trip in the app

Travel times © openrouteservice.org by HeiGIT, map data © OpenStreetMap contributors · Public transport timetables © RTA, Dubai open data

Questions

More questions about Dubai Maritime City

About AED 65k a year for a studio, AED 75k for a 1-bed and AED 110k for a 2-bed. The 30th priciest 1-bed rent of 121 areas. 397 new rent contracts were signed here in 12 months.

A studio sells for about AED 1.15M, a 1-bed sells for about AED 1.73M and a 2-bed sells for about AED 2.5M, the typical price paid in 12 months.

Up 1.4% per sq ft since Nov 2025, for finished flats.

About 4.0% gross Estimate. Studios earn the most, 5.7% gross. 98% of flat sales here are off-plan.

Not inside Dubai Maritime City: Al Ghubaiba station on the Green Line; Al Ras station on the Green Line are at its edge.

Al Ghubaiba station, on the Green Line, 1.9 km from the middle of Dubai Maritime City in a straight line.

17 min by car and 1 hr 43 min by Metro and bus at 8am on a weekday.

1 rated school within 5 km of its middle. The nearest, New Academy School, is rated Good.

15,806 homes in 47 off-plan projects, 2 projects past their planned date.

DLD and Dubai Municipality call it Madinat Dubai Al Melaheyah (مدينة دبي الملاحية). Title deeds and rent contracts use that name.

More nearby

How the numbers work

FromAED 1.15MSee it on the map