Fior 2
Dubai Maritime CityEmaar
Fior 2 is an off-plan project by Emaar in Dubai Maritime City, with 213 homes on 16 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q3 2030
- Sales in 12 months
- No sales
- Homes
- 213
Progress
- Q2 2026Building started
- Oct 2026Last inspection · 0%
- Q3 2030Planned handover
Homes
213 homes by size
- 1 bed45%95 homes · 760–907 sq ft · 4 layouts
- 2 beds43%91 homes · 1,141–1,440 sq ft · 8 layouts
- 3 beds13%27 homes · 1,592–2,967 sq ft · 6 layouts
Location
Drive times
- Downtown Dubai19min
- Dubai Airport (DXB)26min
- Dubai Marina32min
By car. Dubai Islands Beach, the nearest beach, is 3.7 km away.
Rated schools
- New Academy SchoolAmerican · Good2.3 kmaway
Getting around
- Al GhubaibaGreen Line15 minwalk
- Al Mina StreetGold Line · opens 20323.0 kmaway
- Al JaddafHigh-speed rail · planned7.2 kmaway
- Dubai InternationalDXB8.3 kmaway
- MeydanEtihad Rail · planned13 kmaway
Area guideDubai Maritime CityFinished homesAED 2,151/sq ft1-bed rentAED 75k/yrGross yieldEstimate4.0%Developer
- 193 finished
- 139 being built, on time
- 3 past their planned date
- Escrow bank
- Not on record
- Legal name
- Mina Rashid Properties L.L.C
Also being built by Emaar
| Project | Handover | Built |
|---|---|---|
| MaysanTown Square | Q3 2016Past planned date | 37% |
| Teema 1 & Teema 2Al Yalayis 4 | Q3 2016Past planned date | 9% |
| Ocean StarDubai Maritime City | Q3 2025Past planned date | 30% |
| SeascapeDubai Maritime City | Q4 2026Being built | 79% |
| The St. Regis Residences, Downtown DubaiDowntown Dubai | Q4 2026Being built | 76% |
More questions about Fior 2
Q3 2030, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 years.
213 homes on 16 floors: 95 1-bed flats of 760–907 sq ft, 91 2-bed flats of 1,141–1,440 sq ft and 27 3-bed flats of 1,592–2,967 sq ft.
About AED 75k a year for a 1-bed, AED 110k for a 2-bed and AED 146k for a 3-bed in Dubai Maritime City, a gross yield of about 4.0% Estimate.
Of Emaar’s 335 projects on DLD’s record, 193 are finished. Of the 142 being built, 3 are past their planned date.
In Dubai Maritime City, 19 minutes by car to Downtown Dubai and 26 to Dubai Airport (DXB). Al Ghubaiba Metro station on the Green Line is a 15-minute walk.